MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

MINE #9

ActiveUndergroundCoal (Bituminous)
MSHA MINE ID4407217
LOCATIONDickenson, VA
PUBLIC RECORD5,799 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

138

29 significant & substantial (S&S)

  1. 2025 Q115
  2. 2025 Q217
  3. 2025 Q313
  4. 2025 Q422
  5. 2026 Q127
  6. 2026 Q225
  7. 2026 Q319
  8. 2026 Q4 *0

Accident records

2

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q31
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

33,082.00

135 of 138 violations with amounts

  1. 2025 Q17,694
  2. 2025 Q22,916
  3. 2025 Q32,127
  4. 2025 Q44,488
  5. 2026 Q15,884
  6. 2026 Q24,353
  7. 2026 Q35,620
  8. 2026 Q4 *—

On-site inspection hours

890.75

12 inspections · 12 with hours

  1. 2025 Q190.50
  2. 2025 Q2115.25
  3. 2025 Q3120.50
  4. 2025 Q4146.50
  5. 2026 Q1140.25
  6. 2026 Q2148.50
  7. 2026 Q3129.25
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11547,694.0000390.5
2025-Q21712,916.00003115.3
2025-Q31332,127.00101120.5
2025-Q42234,488.00002146.5
2026-Q12735,884.00001140.3
2026-Q22574,353.00001148.5
2026-Q31985,620.00101129.3
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9272425

    75.604(b) · S&S · $1,550.00 proposed

  2. violation9272424

    75.1101-10 · $151.00 proposed

  3. violation9272423

    75.1101-10 · $151.00 proposed

  4. violation9272422

    75.512 · $313.00 proposed

  5. violation9272421

    75.370(a)(1) · S&S · $755.00 proposed

  6. violation9272219

    77.404(a) · S&S

  7. violation9271788

    75.1103-5(a) · S&S

  8. violation9271787

    75.1103-5(a)(1) · S&S

  9. violation9271786

    75.1103-5(a)(2) · S&S · $697.00 proposed

  10. violation9271785

    75.1103-8(b) · $151.00 proposed

  11. violation9272412

    75.333(h) · $151.00 proposed

  12. violation9272411

    75.1731(b) · $151.00 proposed

  13. violation9272410

    75.1101-6 · $151.00 proposed

  14. violation9272409

    75.1731(b) · $151.00 proposed

  15. violation9272915

    75.202(a) · $151.00 proposed

  16. violation9272408

    77.516 · S&S · $592.00 proposed

  17. violation9272407

    75.380(d)(7)(iv) · $177.00 proposed

  18. violation9272406

    77.205(b) · S&S · $177.00 proposed

  19. violation9272405

    75.312(h) · $151.00 proposed

  20. inspectionF011C6D

    Regular Safety and Health Inspection · 129.3 on-site hours

  21. accident220261950006

    FALL OF ROOF OR BACK · ACCIDENT ONLY

    Accident narrative

    Roof fall in the return at spad #2417 between #1 and #2 entries. The fall was about 20' x 20' and 36" thick. The fall did not block the air course or travel way. It has been timbered off and dangered off.

  22. violation8303600

    75.1600-3(a)(1) · $151.00 proposed

  23. violation8303599

    75.370(a)(1) · $151.00 proposed

  24. violation8303598

    75.342(a)(4) · $151.00 proposed

  25. violation8303597

    75.370(a)(1) · S&S · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON140.94Published county average
ESTIMATED SALES · SHORT TONS57,107Allocated from published county sales
ESTIMATED COAL REVENUE · USD8,048,643Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
No. 114407217 · Dickenson, Virginia57,591140.9457,1078,048,643County allocation estimate1.66% of eligible county production6 eligible mines / 6 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYWilliam Ridley Elkins Jr → CLAS COAL COMPANY INC. → MINE #9
HISTORY RECORDS717 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

William Ridley Elkins JrcontrolsClas Coal Company Inc.operatesMINE #9

msha-controller-operator-history · controller/operator co-tenure derived on mine 4407217
—

Fred D Matney et alcontrolsCapital Coal Corp.operatesMINE #9

msha-controller-operator-history · controller/operator co-tenure derived on mine 4407217
—

Hank K Matney et alcontrolsCapital Coal Corp.operatesMINE #9

msha-controller-operator-history · controller/operator co-tenure derived on mine 4407217
—

Rick A Matney et alcontrolsCapital Coal Corp.operatesMINE #9

msha-controller-operator-history · controller/operator co-tenure derived on mine 4407217
—

Alpha Metallurgical Resources InccontrolsParamont Contura LLCoperatesMINE #9

msha-controller-operator-history · controller/operator co-tenure derived on mine 4407217
—

Ricky L OwenscontrolsFour O Mining CorporationoperatesMINE #9

msha-controller-operator-history · controller/operator co-tenure derived on mine 4407217
—

Alpha Natural Resources, Inc.controlsParamont Coal Company Virginia LLCoperatesMINE #9

msha-controller-operator-history · controller/operator co-tenure derived on mine 4407217
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

7 historical accident/injury rows; 0 coded fatalities and 104 lost days across the published record.

ACCIDENT + INJURY RECORD4 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

905 violation rows across the full record; 221 carry an S&S flag and $260,834 appears in current assessed amounts.

ENFORCEMENT ACTIVITY403 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

2,464 coal dust; 70 coal quartz; 161 noise. 0 personal-sample rows have a published C/E ratio above 1; 11 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE3K samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

11K employee hours and 30 summed average employees across reported subunits in the latest published quarter.

2026-Q214K tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

125 contested-violation rows, 125 civil-penalty docket/decision rows, and 16 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE266 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT4 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

160 inspection events and 11K published inspection hours across the historical record.

OVERSIGHT COVERAGE34 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records55 coal · 0 personal · 0 area
Sample status5 not voided0 voided · 0 status not reported
Mean coal quartz concentration14.6 µg/m³5 eligible measurements · 0 missing concentration
2026 · Jan 13, 2026–Aug 25, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58566321 / lab 2026035316Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION7 µg/m³2.7% quartzNot voidedNot reported
58566300 / lab 2026035314Coal quartzQuartzOCCUPATION CODE NOT FOUNDDESIGNATED AREA12 µg/m³2.2% quartzNot voidedNot reported
58565810 / lab 2026035315Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION12 µg/m³3.8% quartzNot voidedNot reported
58566075 / lab 2026025362Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION26 µg/m³5% quartzNot voidedNot reported
58561571 / lab 2026001476Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION16 µg/m³8.2% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
927242575.604(b)S&S
927242475.1101-10Citation
927242375.1101-10Citation
927242275.512Citation
927242175.370(a)(1)S&S
927221977.404(a)S&S
927178875.1103-5(a)S&S
927178775.1103-5(a)(1)S&S
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustCONTINUOUS MINER OPERATOR
.667 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
1.007 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
1.264 mg/m³Not voided
Coal dustCONTINUOUS MINER OPERATOR
.744 mg/m³Voided
Coal dustOCCUPATION CODE NOT FOUND
.625 mg/m³Not voided
Coal dustCONTINUOUS MINER OPERATOR
.389 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
1.113 mg/m³Not voided
Coal dustCONTINUOUS MINER OPERATOR
.207 mg/m³Not voided

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors7Aug 30, 2011—Jul 1, 2026mine-keyed
Addresses of Recordidentity · logistics1Apr 14, 2026—Apr 14, 2026mine-keyed
Assessed Violationscompliance · legal885Mar 25, 2010—Aug 12, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal125Jul 5, 2022—Sep 16, 2026mine-keyed
Coal Dust Sampleshealth · safety2,464May 25, 2010—Oct 8, 2026mine-keyed
Conferencescompliance · legal16Sep 21, 2015—Sep 29, 2026mine-keyed
Contested Violationscompliance · legal125Jan 4, 2022—Jan 23, 2026mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety553Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety114Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance7Feb 27, 2008—Apr 1, 2026mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance161Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance44Not published—Not publishedmine-keyed
Inspectionssafety · compliance160Mar 19, 2008—Jul 21, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment161Aug 17, 2010—Sep 14, 2026mine-keyed
Quartz Samples — Coalhealth · safety70Apr 12, 2011—Aug 25, 2026mine-keyed
Violationscompliance · safety · legal905Mar 25, 2010—Aug 12, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.