ACTIVE / CONTROLLER PORTFOLIO

William Ridley Elkins Jr

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER IDC15664

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
MINE #94407217 · Active6/8 quarters reportedDickenson, VAUnderground · MSHA: Coal (Bituminous)89,16078,0291382890.8

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

138

29 significant & substantial (S&S)

  1. 2025 Q115
  2. 2025 Q217
  3. 2025 Q313
  4. 2025 Q422
  5. 2026 Q127
  6. 2026 Q225
  7. 2026 Q319
  8. 2026 Q4 *0

Accident records

2

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q31
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

33,082.00

135 of 138 violations with amounts

  1. 2025 Q17,694
  2. 2025 Q22,916
  3. 2025 Q32,127
  4. 2025 Q44,488
  5. 2026 Q15,884
  6. 2026 Q24,353
  7. 2026 Q35,620
  8. 2026 Q4 *—

On-site inspection hours

890.75

12 inspections · 12 with hours

  1. 2025 Q190.50
  2. 2025 Q2115.25
  3. 2025 Q3120.50
  4. 2025 Q4146.50
  5. 2026 Q1140.25
  6. 2026 Q2148.50
  7. 2026 Q3129.25
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11547,694.0000390.5
2025-Q21712,916.00003115.3
2025-Q31332,127.00101120.5
2025-Q42234,488.00002146.5
2026-Q12735,884.00001140.3
2026-Q22574,353.00001148.5
2026-Q31985,620.00101129.3
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9272425
    MINE #9 · 4407217

    75.604(b) · S&S · $1,550.00 proposed

  2. violation9272424
    MINE #9 · 4407217

    75.1101-10 · $151.00 proposed

  3. violation9272423
    MINE #9 · 4407217

    75.1101-10 · $151.00 proposed

  4. violation9272422
    MINE #9 · 4407217

    75.512 · $313.00 proposed

  5. violation9272421
    MINE #9 · 4407217

    75.370(a)(1) · S&S · $755.00 proposed

  6. violation9272219
    MINE #9 · 4407217

    77.404(a) · S&S

  7. violation9271788
    MINE #9 · 4407217

    75.1103-5(a) · S&S

  8. violation9271787
    MINE #9 · 4407217

    75.1103-5(a)(1) · S&S

  9. violation9271786
    MINE #9 · 4407217

    75.1103-5(a)(2) · S&S · $697.00 proposed

  10. violation9271785
    MINE #9 · 4407217

    75.1103-8(b) · $151.00 proposed

  11. violation9272412
    MINE #9 · 4407217

    75.333(h) · $151.00 proposed

  12. violation9272411
    MINE #9 · 4407217

    75.1731(b) · $151.00 proposed

  13. violation9272410
    MINE #9 · 4407217

    75.1101-6 · $151.00 proposed

  14. violation9272409
    MINE #9 · 4407217

    75.1731(b) · $151.00 proposed

  15. violation9272915
    MINE #9 · 4407217

    75.202(a) · $151.00 proposed

  16. violation9272408
    MINE #9 · 4407217

    77.516 · S&S · $592.00 proposed

  17. violation9272407
    MINE #9 · 4407217

    75.380(d)(7)(iv) · $177.00 proposed

  18. violation9272406
    MINE #9 · 4407217

    77.205(b) · S&S · $177.00 proposed

  19. violation9272405
    MINE #9 · 4407217

    75.312(h) · $151.00 proposed

  20. inspectionF011C6D
    MINE #9 · 4407217

    Regular Safety and Health Inspection · 129.3 on-site hours

  21. accident220261950006
    MINE #9 · 4407217

    FALL OF ROOF OR BACK · ACCIDENT ONLY

    Accident narrative

    Roof fall in the return at spad #2417 between #1 and #2 entries. The fall was about 20' x 20' and 36" thick. The fall did not block the air course or travel way. It has been timbered off and dangered off.

  22. violation8303600
    MINE #9 · 4407217

    75.1600-3(a)(1) · $151.00 proposed

  23. violation8303599
    MINE #9 · 4407217

    75.370(a)(1) · $151.00 proposed

  24. violation8303598
    MINE #9 · 4407217

    75.342(a)(4) · $151.00 proposed

  25. violation8303597
    MINE #9 · 4407217

    75.370(a)(1) · S&S · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this controller in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON140.94Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS57,107Allocated from published county sales
ESTIMATED COAL REVENUE · USD8,048,643Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
No. 114407217 · Dickenson, Virginia57,591140.9457,1078,048,643County allocation estimate1.66% of eligible county production6 eligible mines / 6 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.