MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

Eagle Seam Deep Mine

NonProducingUndergroundCoal (Bituminous)
MSHA MINE ID4609495
LOCATIONLogan, WV
PUBLIC RECORD8,863 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

93

9 significant & substantial (S&S)

  1. 2025 Q130
  2. 2025 Q229
  3. 2025 Q312
  4. 2025 Q42
  5. 2026 Q15
  6. 2026 Q22
  7. 2026 Q36
  8. 2026 Q4 *7

Accident records

2

0 records classified as fatality

  1. 2025 Q12
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

51,064.00

79 of 93 violations with amounts

  1. 2025 Q129,254
  2. 2025 Q213,432
  3. 2025 Q35,060
  4. 2025 Q4418
  5. 2026 Q12,240
  6. 2026 Q2330
  7. 2026 Q3330
  8. 2026 Q4 *—

On-site inspection hours

687.25

11 inspections · 11 with hours

  1. 2025 Q1205.25
  2. 2025 Q2135.50
  3. 2025 Q384.00
  4. 2025 Q489.00
  5. 2026 Q143.75
  6. 2026 Q273.50
  7. 2026 Q349.00
  8. 2026 Q4 *7.25
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q130529,254.00202205.3
2025-Q229113,432.00001135.5
2025-Q31215,060.0000284.0
2025-Q420418.0000289.0
2026-Q1512,240.0000143.8
2026-Q220330.0000173.5
2026-Q360330.0000149.0
2026-Q4 *71—0017.3

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5131849

    77.1109(a)

  2. violation5131848

    75.1100-3

  3. violation5131847

    75.904

  4. violation5131846

    75.1731(a)

  5. violation5131845

    75.351(n)(3)

  6. violation5131844

    77.400(d) · S&S

  7. inspectionF03DF79

    Regular Safety and Health Inspection · 7.3 on-site hours

  8. violation5131843

    75.209(f)

  9. violation5098916

    75.1731(b)

  10. violation5098915

    75.333(c)(3)

  11. violation5098914

    75.204(c)(1)

  12. violation5098913

    75.400

  13. violation5098910

    75.512 · $165.00 proposed

  14. violation5098909

    77.207 · $165.00 proposed

  15. inspectionF00EB07

    Regular Safety and Health Inspection · 49.0 on-site hours

  16. violation5099719

    75.1100-3 · $165.00 proposed

  17. violation5099718

    75.1731(b) · $165.00 proposed

  18. inspection7048878

    Regular Safety and Health Inspection · 73.5 on-site hours

  19. violation5132513

    75.818(b)(4) · $288.00 proposed

  20. inspectionF010C65

    Regular Safety and Health Inspection · 43.8 on-site hours

  21. violation5132512

    75.1101-10 · $151.00 proposed

  22. violation5132511

    75.400 · $177.00 proposed

  23. violation5132510

    77.512 · S&S · $1,431.00 proposed

  24. violation5132509

    77.205(b) · $193.00 proposed

  25. inspectionF02EC70

    103 (g) Written Notification Hazard Complaint Inspectio · 3.8 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON123.83Published county average
ESTIMATED SALES · SHORT TONS225,236Allocated from published county sales
ESTIMATED COAL REVENUE · USD27,890,914Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Eagle Seam Deep Mine4609495 · Logan, West Virginia228,611123.83225,23627,890,914County allocation estimate2.35% of eligible county production24 eligible mines / 24 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYRamaco Resources Inc → Ramaco Resources, LLC → Eagle Seam Deep Mine
HISTORY RECORDS25 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

Ramaco Resources InccontrolsRamaco Resources, LLCoperatesEagle Seam Deep Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4609495
—

Michael D BauersachscontrolsRamaco Resources, LLCoperatesEagle Seam Deep Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4609495
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

50 historical accident/injury rows; 0 coded fatalities and 3,261 lost days across the published record.

ACCIDENT + INJURY RECORD20 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

1,006 violation rows across the full record; 171 carry an S&S flag and $665,840 appears in current assessed amounts.

ENFORCEMENT ACTIVITY663 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

3,995 coal dust; 148 coal quartz; 110 noise. 0 personal-sample rows have a published C/E ratio above 1; 14 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE4K samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

7K employee hours and 10 summed average employees across reported subunits in the latest published quarter.

2026-Q20 tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

274 contested-violation rows, 273 civil-penalty docket/decision rows, and 24 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE571 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT10 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

116 inspection events and 8K published inspection hours across the historical record.

OVERSIGHT COVERAGE51 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records00 coal · 0 personal · 0 area
Sample status0 not voided0 voided · 0 status not reported
Mean coal quartz concentration— µg/m³0 eligible measurements · 0 missing concentration
2026 · No reported dates in this selection
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
No silica records match these filters. Missing samples do not establish safe conditions.
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
513184977.1109(a)Citation
513184875.1100-3Citation
513184775.904Citation
513184675.1731(a)Citation
513184575.351(n)(3)Citation
513184477.400(d)S&S
513184375.209(f)Citation
509891675.1731(b)Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustOCCUPATION CODE NOT FOUND
.047 mg/m³Voided
Coal dustOCCUPATION CODE NOT FOUND
.105 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
.045 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
.1 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
.076 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
.005 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
1.03 mg/m³Voided · EXCESS SAMPLE
Coal dustOCCUPATION CODE NOT FOUND
0 mg/m³Voided

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors50Oct 9, 2017—Mar 18, 2025mine-keyed
Addresses of Recordidentity · logistics1Jun 3, 2024—Jun 3, 2024mine-keyed
Assessed Violationscompliance · legal956Nov 8, 2016—Aug 3, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal273May 18, 2018—Oct 1, 2026mine-keyed
Coal Dust Sampleshealth · safety3,995Jun 12, 2017—Oct 7, 2026mine-keyed
Conferencescompliance · legal24Mar 26, 2018—Jul 15, 2024mine-keyed
Contested Violationscompliance · legal274Aug 29, 2017—May 5, 2025mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety1,438Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety337Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance2Jul 31, 2014—Jul 31, 2014mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance104Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance28Not published—Not publishedmine-keyed
Inspectionssafety · compliance116Sep 29, 2014—Oct 1, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment110Jul 26, 2017—Apr 20, 2026mine-keyed
Quartz Samples — Coalhealth · safety148Jun 29, 2017—May 8, 2025mine-keyed
Violationscompliance · safety · legal1,006Nov 8, 2016—Oct 8, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.