ACTIVE / OPERATOR PORTFOLIO

River View Coal LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0072463

MINE PORTFOLIO

3 of 3 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Henderson County Mine1502709 · Active6/8 quarters reportedHenderson, KYUnderground · MSHA: Coal (Bituminous)6,109,8381,079,642525686,081.3
River View Facilities1503178 · Active6/8 quarters reportedUnion, KYFacility · MSHA: Coal (Bituminous)0269,430346397.8
RIVER VIEW MINE1519374 · Active6/8 quarters reportedUnion, KYUnderground · MSHA: Coal (Bituminous)8,971,2681,910,316554738,559.3

LOCATION

Portfolio map

3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

1,113

241 significant & substantial (S&S)

  1. 2025 Q1154
  2. 2025 Q2168
  3. 2025 Q3158
  4. 2025 Q4170
  5. 2026 Q1137
  6. 2026 Q2150
  7. 2026 Q3151
  8. 2026 Q4 *25

Accident records

147

0 records classified as fatality

  1. 2025 Q113
  2. 2025 Q219
  3. 2025 Q334
  4. 2025 Q427
  5. 2026 Q113
  6. 2026 Q220
  7. 2026 Q321
  8. 2026 Q4 *0

Proposed penalties · USD

399,808.00

1,070 of 1,113 violations with amounts

  1. 2025 Q160,336
  2. 2025 Q250,692
  3. 2025 Q347,762
  4. 2025 Q453,682
  5. 2026 Q148,281
  6. 2026 Q254,410
  7. 2026 Q384,645
  8. 2026 Q4 *—

On-site inspection hours

15,038.25

124 inspections · 124 with hours

  1. 2025 Q12,043.25
  2. 2025 Q22,144.75
  3. 2025 Q32,168.00
  4. 2025 Q42,086.25
  5. 2026 Q12,098.00
  6. 2026 Q22,223.75
  7. 2026 Q32,074.75
  8. 2026 Q4 *199.50
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11543160,336.00130202,043.3
2025-Q21683050,692.00190162,144.8
2025-Q31582547,762.00340172,168.0
2025-Q41704653,682.00270172,086.3
2026-Q11373448,281.00130162,098.0
2026-Q21503254,410.00200172,223.8
2026-Q31513984,645.00210162,074.8
2026-Q4 *254—005199.5

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5044617
    RIVER VIEW MINE · 1519374

    75.380(d)(7)(vi) · $151.00 proposed

  2. violation5044616
    RIVER VIEW MINE · 1519374

    75.403 · $151.00 proposed

  3. accident220262290008
    Henderson County Mine · 1502709

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was lifting roof bolts to put on pinner when EE felt pain in EE's left shoulder. EE finished EE's shift but was hurting the next day. EE was seen by a physician who gave EE restrictions preventing EE from performing EE's normal duties.

  4. accident220262290006
    Henderson County Mine · 1502709

    MACHINERY · DAYS AWAY FROM WORK ONLY

    Accident narrative

    As employee was drilling a hole for a pin, the rock fractured and a piece fell out striking EE's right ankle. EE finished EE's shift but went to the ER afterwards where x-rays revealed a fracture. EE was taken off work due to restrictions preventing EE from performing EE's normal job.

  5. violation5047890
    Henderson County Mine · 1502709

    75.517 · $465.00 proposed

  6. violation5044615
    RIVER VIEW MINE · 1519374

    75.1725(a) · $193.00 proposed

  7. accident220262190002
    Henderson County Mine · 1502709

    MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    While drilling a hole, EE stopped EE's rotation while still applying upward pressure causing the pinner steel to break and strike EE in the forehead. EE was treated at the ER where EE received six sutures and a full release with no restrictions to return to EE's regular duties.

  8. accident220262190001
    Henderson County Mine · 1502709

    SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was welding on a belt structure when EE lost EE's balance and fell. EE landed on EE's left arm and felt immediate pain in EE's left shoulder. EE finished EE's shift but requested to see a physician afterward and was taken off work due to restrictions preventing EE from performing EE's normal job.

  9. violation5221148
    Henderson County Mine · 1502709

    75.903 · $193.00 proposed

  10. violation5221147
    Henderson County Mine · 1502709

    75.904 · $193.00 proposed

  11. violation5221146
    Henderson County Mine · 1502709

    75.220(a)(1) · $151.00 proposed

  12. violation5044614
    RIVER VIEW MINE · 1519374

    75.333(c)(2) · $193.00 proposed

  13. violation5044613
    RIVER VIEW MINE · 1519374

    75.380(d)(7)(vi) · $193.00 proposed

  14. accident220262180017
    Henderson County Mine · 1502709

    HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    Employee was using a utility knife to cut a plastic band when the knife slipped, causing a laceration to left forearm which required three sutures. Employee was given a full release with no restrictions and returned to finish the shift.

  15. violation5221142
    Henderson County Mine · 1502709

    75.503 · $226.00 proposed

  16. violation5221141
    Henderson County Mine · 1502709

    75.512 · $245.00 proposed

  17. violation5221140
    Henderson County Mine · 1502709

    75.1725(a) · S&S · $3,448.00 proposed

  18. violation5044612
    Henderson County Mine · 1502709

    75.370(a)(1) · S&S · $2,133.00 proposed

  19. violation5044611
    Henderson County Mine · 1502709

    70.100(b)(2) · S&S · $1,431.00 proposed

  20. violation5044610
    Henderson County Mine · 1502709

    70.100(b)(2) · S&S · $1,431.00 proposed

  21. violation5044302
    RIVER VIEW MINE · 1519374

    75.1714-3(a) · $151.00 proposed

  22. accident220262450007
    Henderson County Mine · 1502709

    POWERED HAULAGE · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee had just started shift and was backing EE's tractor up to a supply trailer, when EE struck the rib causing it to fall off striking EE's right arm, shoulder, and elbow. EE continued to work until 8/18/26 when a physician gave EE restrictions preventing EE from performing EE's normal job.

  23. inspectionF014705
    RIVER VIEW MINE · 1519374

    103(i) Spot Inspections · 8.0 on-site hours

  24. violation5044609
    RIVER VIEW MINE · 1519374

    75.342(a)(4) · S&S · $549.00 proposed

  25. violation5044768
    Henderson County Mine · 1502709

    75.403 · $245.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS8,887,539255 rows · 10 receiving plants
HEAT CONTENT · BTU/LB11,396Weighted by reported tons
SULFUR / ASH · % BY WEIGHT2.99 / 9.15Separate averages over measured receipts
DELIVERED COST · USD/TON57.7998.9% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *1,501,67511,4252.959.2957.93
2025-Q42,071,41311,4012.999.1558.25
2026-Q11,922,24511,3892.999.0856.68
2026-Q22,591,49611,3873.009.1257.69
2026-Q3 *800,71011,3773.009.1959.41
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11475 · preliminaryRIVER VIEW MINE1519374Clifty Creek983 · IN · ALLIANCE COAL29,94761.7311,3643.019.30ContractBITRiver
2026-07EIA row 11477 · preliminaryRIVER VIEW MINE1519374Clifty Creek983 · IN · ALLIANCE COAL43,14856.6411,4332.999.10ContractBITRiver
2026-07EIA row 11478 · preliminaryRIVER VIEW MINE1519374Clifty Creek983 · IN · ALLIANCE COAL26,41265.7311,3493.059.30ContractBITRiver
2026-07EIA row 11546 · preliminaryRIVER VIEW MINE1519374Ghent1356 · KY · ALLIANCE COAL44,87855.5311,3663.029.30ContractBITRiver
2026-07EIA row 11552 · preliminaryRIVER VIEW MINE1519374Ghent1356 · KY · FORE LLC4,92547.6211,5762.778.80ContractBITRiver
2026-07EIA row 11553 · preliminaryRIVER VIEW MINE1519374Ghent1356 · KY · ALLIANCE COAL23,54555.9011,3723.019.20ContractBITRiver
2026-07EIA row 11558 · preliminaryRIVER VIEW MINE1519374Ghent1356 · KY · ALLIANCE COAL117,96956.0911,3453.039.30ContractBITRiver
2026-07EIA row 11564 · preliminaryRIVER VIEW MINE1519374Mill Creek (KY)1364 · KY · ALLIANCE COAL18,40654.9011,3713.019.30ContractBITRiver
2026-07EIA row 11567 · preliminaryRIVER VIEW MINE1519374Mill Creek (KY)1364 · KY · ALLIANCE COAL18,43855.0211,3633.029.20ContractBITRiver
2026-07EIA row 11782 · preliminaryRIVER VIEW MINE1519374Miami Fort2832 · OH · ALLIANCE COAL52,839—Not published11,3853.059.20SpotBITRiver
2026-07EIA row 11872 · preliminaryRIVER VIEW MINE1519374Cumberland (TN)3399 · TN · ALLIANCE COAL99,06455.2411,4222.878.90ContractBITRiver
2026-07EIA row 12012 · preliminaryRIVER VIEW FACILITIES1503178East Bend6018 · KY · ALLIANCE COAL12,14363.3711,3932.999.10SpotBITRiver
2026-07EIA row 12023 · preliminaryRIVER VIEW MINE1519374H L Spurlock6041 · KY · ALLIANCE COAL16,10060.3111,3753.029.20ContractBITRiver
2026-07EIA row 12024 · preliminaryRIVER VIEW MINE1519374H L Spurlock6041 · KY · ALLIANCE COAL37,64562.3111,3703.019.30ContractBITRiver
2026-07EIA row 12032 · preliminaryRIVER VIEW MINE1519374H L Spurlock6041 · KY · ALLIANCE COAL26,86266.8311,3703.049.30SpotBITRiver
2026-07EIA row 12036 · preliminaryRIVER VIEW MINE1519374H L Spurlock6041 · KY · ALLIANCE COAL67,14167.1911,3803.049.20SpotBITRiver
2026-07EIA row 12072 · preliminaryRIVER VIEW MINE1519374Trimble County6071 · KY · ALLIANCE COAL39,73954.9511,3593.039.20ContractBITRiver
2026-07EIA row 12076 · preliminaryRIVER VIEW MINE1519374Trimble County6071 · KY · ALLIANCE COAL28,75356.2011,3623.039.20ContractBITRiver
2026-07EIA row 12079 · preliminaryRIVER VIEW MINE1519374Trimble County6071 · KY · ALLIANCE COAL34,98956.1911,3613.049.20ContractBITRiver
2026-07EIA row 12505 · preliminaryRIVER VIEW FACILITIES1503178IMT Transfer8827 · FL · ALLIANCE COAL47,49771.9711,3743.029.20ContractBITRiver
2026-07EIA row 12567 · preliminaryRIVER VIEW FACILITIES1503178Associated TerminalS8851 · MS · ALLIANCE COAL10,27065.1611,3752.999.30ContractBITRiver
2026-06EIA row 9586 · preliminaryRIVER VIEW MINE1519374Clifty Creek983 · IN · ALLIANCE COAL99,92859.8411,3723.029.20ContractBITRiver
2026-06EIA row 9588 · preliminaryRIVER VIEW MINE1519374Clifty Creek983 · IN · ALLIANCE COAL59,69654.7611,3903.029.10ContractBITRiver
2026-06EIA row 9589 · preliminaryRIVER VIEW MINE1519374Clifty Creek983 · IN · ALLIANCE COAL37,82563.8411,3643.029.20ContractBITRiver
2026-06EIA row 9655 · preliminaryRIVER VIEW MINE1519374Ghent1356 · KY · ALLIANCE COAL24,85654.4811,3743.049.20ContractBITRiver
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 2 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Henderson County Mine1502709 · Union, Kentucky254,286———County sales or price not published2 eligible mines / 2 sales respondents
River View Facilities1503178 · Union, Kentucky0———Preparation plant2 eligible mines / 2 sales respondents
River View Mine1519374 · Union, Kentucky8,999,873———County sales or price not published2 eligible mines / 2 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.