Coal production
920,029reported short tons
ALL STATUSES / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Grindstone4105586 · Active6/8 quarters reported | Palo Pinto, TXSurface · MSHA: Crushed, Broken Limestone NEC | 0 | 204,945 | 26 | 2 | 51.0 |
| Colowyo Mine0502962 · NonProducing6/8 quarters reported | Moffat, COSurface · MSHA: Coal (Bituminous) | 920,029 | 348,505 | 13 | 7 | 322.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 2 mines listed under this operator were checked; 2 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 408,832 | 108,077 | 3.78 | 214 | 2/2 mines reporting |
| 2025 Q2 | 263,019 | 96,077 | 2.74 | 200 | 2/2 mines reporting |
| 2025 Q3 | 214,240 | 92,969 | 2.30 | 191 | 2/2 mines reporting |
| 2025 Q4 | 33,938 | 103,036 | 0.33 | 188 | 2/2 mines reporting |
| 2026 Q1 | 0 | 36,743 | 0.00 | 52 | 2/2 mines reporting |
| 2026 Q2 | 0 | 116,548 | 0.00 | 209 | 2/2 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
4 significant & substantial (S&S)
0 records classified as fatality
39 of 39 violations with amounts
12 inspections · 12 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 8 | 0 | 1,324.00 | 1 | 0 | 2 | 113.5 |
| 2025-Q2 | 1 | 1 | 1,320.00 | 4 | 0 | 2 | 94.0 |
| 2025-Q3 | 0 | 0 | — | 1 | 0 | 0 | — |
| 2025-Q4 | 7 | 1 | 1,547.00 | 1 | 0 | 1 | 14.8 |
| 2026-Q1 | 5 | 0 | 3,532.00 | 1 | 0 | 2 | 68.0 |
| 2026-Q2 | 11 | 2 | 3,921.00 | 0 | 0 | 2 | 23.5 |
| 2026-Q3 | 7 | 0 | 1,057.00 | 1 | 0 | 2 | 52.5 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 1 | 7.3 |
All violations issued in the selected period. Counts combine subsections.
Regular Safety and Health Inspection · 105.3 on-site hours
HANDTOOLS (NONPOWERED) · DAYS AWAY FROM WORK ONLY
Production Operator was shoveling mud off the track frame of a dozer while standing on the ground when Operator slipped and fell, landing on left shoulder. X-ray was negative and physician has referred employee for an MRI.
Regular Safety and Health Inspection · 8.3 on-site hours
50.30(a) · $151.00 proposed
50.30(a) · $151.00 proposed
50.30(a) · $151.00 proposed
56.14100(c) · $151.00 proposed
56.12006 · $267.00 proposed
56.16006 · $151.00 proposed
47.44(b) · $151.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 141,391 | 9,872 | 0.34 | 8.08 | 80.55 | |
| 2026-Q1 | 136,065 | 9,920 | 0.31 | 6.50 | 81.21 | |
| 2026-Q2 | 360,661 | 9,600 | 0.37 | 9.09 | 78.54 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-06EIA row 10108 · preliminary | COLOWYO MINE0502962 | Craig (CO)6021 · CO · COLOWYO MINE | 57,742 | 77.96 | 9,552 | 0.38 | 9.40 | ContractSUB | Rail |
| 2026-05EIA row 8262 · preliminary | COLOWYO MINE0502962 | Craig (CO)6021 · CO · COLOWYO MINE | 128,368 | 77.42 | 9,490 | 0.41 | 10.30 | ContractSUB | Rail |
| 2026-04EIA row 6457 · preliminary | COLOWYO MINE0502962 | Craig (CO)6021 · CO · COLOWYO MINE | 174,551 | 79.55 | 9,696 | 0.34 | 8.10 | ContractSUB | Rail |
| 2026-03EIA row 4643 · preliminary | COLOWYO MINE0502962 | Craig (CO)6021 · CO · COLOWYO MINE | 136,065 | 81.21 | 9,920 | 0.31 | 6.50 | ContractSUB | Rail |
| 2025-09EIA row 25742 · final | COLOWYO MINE0502962 | Craig (CO)6021 · CO · COLOWYO MINE | 37,985 | 78.98 | 9,755 | 0.35 | 9.10 | ContractSUB | Rail |
| 2025-08EIA row 22601 · final | COLOWYO MINE0502962 | Craig (CO)6021 · CO · COLOWYO MINE | 103,406 | 81.12 | 9,915 | 0.33 | 7.70 | ContractSUB | Rail |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. All producing annual records in this selection have estimates. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Colowyo Mine0502962 · Moffat, Colorado | 1,713,919 | 55.97 | 1,728,783 | 96,759,987 | County allocation estimate32.95% of eligible county production4 eligible mines / 4 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.