MINE DETAILS
Colowyo Mine
LOCATION
Mine location
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
Mine coordinates
- Colowyo Mine40.29972, -107.78306Open map ↗
Quarterly trends
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. MSHA quarterly production and employment reports.
Coal production
920,029reported short tons
Hours worked
348,505reported employee hours
Tons per hour
2.64production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
Quarterly data and reporting coverage
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 408,832 | 73,551 | 5.56 | 161 | 1/1 mines reporting |
| 2025 Q2 | 263,019 | 65,805 | 4.00 | 153 | 1/1 mines reporting |
| 2025 Q3 | 214,240 | 60,850 | 3.52 | 144 | 1/1 mines reporting |
| 2025 Q4 | 33,938 | 69,726 | 0.49 | 138 | 1/1 mines reporting |
| 2026 Q1 | 0 | 73 | 0.00 | 2 | 1/1 mines reporting |
| 2026 Q2 | 0 | 78,500 | 0.00 | 152 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
Safety and enforcement
2025-01-01 – 2026-10-13
Violations
130 significant & substantial (S&S)
Accident records
70 records classified as fatality
Proposed penalties · USD
4,740.0013 of 13 violations with amounts
On-site inspection hours
315.258 inspections · 8 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
Quarterly safety data
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 1 | 0 | 151.00 | 1 | 0 | 1 | 105.3 |
| 2025-Q2 | 0 | 0 | — | 4 | 0 | 1 | 83.0 |
| 2025-Q3 | 0 | 0 | — | 1 | 0 | 0 | — |
| 2025-Q4 | 0 | 0 | — | 0 | 0 | 0 | — |
| 2026-Q1 | 5 | 0 | 3,532.00 | 0 | 0 | 2 | 68.0 |
| 2026-Q2 | 0 | 0 | — | 0 | 0 | 1 | 6.5 |
| 2026-Q3 | 7 | 0 | 1,057.00 | 1 | 0 | 2 | 52.5 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 1 | 0.0 |
Most cited CFR sections
All violations issued in the selected period. Counts combine subsections.
Safety activity
Verbal Hazard Complaint Inspections · 0.0 on-site hours
HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
pulling/cutting liner. forgot blade was not retracted. cut arm above the wrist.
77.1102 · $151.00 proposed
77.404(a) · $151.00 proposed
77.1110 · $151.00 proposed
77.1110 · $151.00 proposed
77.502 · $151.00 proposed
77.1110 · $151.00 proposed
Regular Safety and Health Inspection · 52.5 on-site hours
Verbal Hazard Complaint Inspections · 0.0 on-site hours
77.404(a) · $151.00 proposed
Verbal Hazard Complaint Inspections · 6.5 on-site hours
77.1110 · $592.00 proposed
77.1110 · $549.00 proposed
77.1110 · $549.00 proposed
77.502-2 · $959.00 proposed
Regular Safety and Health Inspection · 65.3 on-site hours
Verbal Hazard Complaint Inspections · 2.8 on-site hours
77.1110 · $883.00 proposed
FIRE · ACCIDENT ONLY
Accident narrative
A wildland fire was discovered west of the active mining area and not extinguished within 1/2 hour of discovery. Upon further investigation, the fire is not within the mining permit boundary. No mine personnel, equipment, or facilities were in danger. The fire was believed to be started by lightning that was in the area.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee states that their back was hurting after doing clean up and shoveling at the loadout.
FIRE · ACCIDENT ONLY
Accident narrative
On June 20, 2025, at approximately 1420, a wildland fire was discovered inside the mine permit boundary near a public utility powerline during high wind conditions. The fire was not extinguished within 30 minutes of discovery making this event immediately reportable to MSHA. No personnel, equipment or facilities were endangered by this event.
Regular Safety and Health Inspection · 83.0 on-site hours
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Accident narrative
Employee was pulling fuel hose and twisted to get slack in the hose so the nozzle could be hooked to the piece of equipment to be fueled. When the employee twisted this caused pain to the lower left abdomen. The employee was taken to the hospital for evaluation and not allowed to return for their next scheduled shift on 5/25/25 but given a full release to return to work on 5/26/25.
OTHER · DAYS AWAY FROM WORK ONLY
Accident narrative
On 4/18/25 employee was walking and as they took a step their knee buckled. The employee didn't feel any sort of pop or discomfort at that time. On 4/19/25 the employee went to a physician due to their knee being sore and stiff. X-ray was negative and the employee has been referred to an orthopedic physician for further evaluation. Appointment for ortho is pending.
Safety sources and definitions
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Coal shipments and quality
Receipts reported by power plants and terminals, matched by MSHA mine ID.
Quarterly receipts and quality
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 141,391 | 9,872 | 0.34 | 8.08 | 80.55 | |
| 2026-Q1 | 136,065 | 9,920 | 0.31 | 6.50 | 81.21 | |
| 2026-Q2 | 360,661 | 9,600 | 0.37 | 9.09 | 78.54 |
| Month / source | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|
| 2026-06EIA row 10108 · preliminary | Craig (CO)6021 · CO · COLOWYO MINE | 57,742 | 77.96 | 9,552 | 0.38 | 9.40 | ContractSUB | Rail |
| 2026-05EIA row 8262 · preliminary | Craig (CO)6021 · CO · COLOWYO MINE | 128,368 | 77.42 | 9,490 | 0.41 | 10.30 | ContractSUB | Rail |
| 2026-04EIA row 6457 · preliminary | Craig (CO)6021 · CO · COLOWYO MINE | 174,551 | 79.55 | 9,696 | 0.34 | 8.10 | ContractSUB | Rail |
| 2026-03EIA row 4643 · preliminary | Craig (CO)6021 · CO · COLOWYO MINE | 136,065 | 81.21 | 9,920 | 0.31 | 6.50 | ContractSUB | Rail |
| 2025-09EIA row 25742 · final | Craig (CO)6021 · CO · COLOWYO MINE | 37,985 | 78.98 | 9,755 | 0.35 | 9.10 | ContractSUB | Rail |
| 2025-08EIA row 22601 · final | Craig (CO)6021 · CO · COLOWYO MINE | 103,406 | 81.12 | 9,915 | 0.33 | 7.70 | ContractSUB | Rail |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Coverage, sources and calculations
- Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
- Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
- Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
- Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
- USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
- Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
- 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
- 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs
EIA ANNUAL COAL REPORT · 2024
Coal prices and estimated revenue
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. All producing annual records in this selection have estimates. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Colowyo Mine0502962 · Moffat, Colorado | 1,713,919 | 55.97 | 1,728,783 | 96,759,987 | County allocation estimate32.95% of eligible county production4 eligible mines / 4 sales respondents |
Method, assumptions and source records
- This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
- Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
- The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
- FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
- Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
- County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
- Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
OWNERSHIP
Operator and controller history
Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.
Kiewit Peter Sons' InccontrolsKiewit Mining Group IncoperatesColowyo Mine
msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962Tri-State Generation and Transmission Assn InccontrolsColowyo Coal Company L PoperatesColowyo Mine
msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962Tri-State Generation & Transmission Assn Inc et alcontrolsColowyo Coal Company L PoperatesColowyo Mine
msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962Western Fuels Assoc Inc et alcontrolsColowyo Coal Company L PoperatesColowyo Mine
msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962RTZ-CRA GroupcontrolsColowyo Coal Company L PoperatesColowyo Mine
msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962W R Grace & CompanycontrolsColowyo Coal Company L PoperatesColowyo Mine
msha-controller-operator-history · controller/operator co-tenure derived on mine 0502962Other historical summaries · source-specific periods
RECORD SUMMARY
Production, safety and enforcement
These summaries use the periods stated on each card, independently of the reporting period above.
Accidents and injuries
114 historical accident/injury rows; 1 coded fatalities and 2,580 lost days across the published record.
accidentsmine-production-quarterlyViolations and penalties
671 violation rows across the full record; 130 carry an S&S flag and $448,768 appears in current assessed amounts.
inspectionsviolationsassessed-violationsorders-107aOccupational health samples
623 coal dust; 60 coal quartz; 237 noise. 0 personal-sample rows have a published C/E ratio above 1; 8 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
coal-dust-samplesquartz-samplesnoise-samplesQuarterly production and employment
79K employee hours and 152 summed average employees across reported subunits in the latest published quarter.
mine-production-quarterlymine-production-yearlyContests, conferences and decisions
41 contested-violation rows, 42 civil-penalty docket/decision rows, and 10 conference records linked by issuance number.
conferencescontested-violationscivil-penalty-dockets-decisionsContractors
Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
contractor-production-quarterlycontractor-production-yearlyaccidentsviolationsInspections
147 inspection events and 12K published inspection hours across the historical record.
inspectionsviolationsHEALTH SAMPLING
Silica and quartz
Coal quartz, metal/nonmetal personal samples and area samples. Snapshot Oct 13, 2026. 60 silica records across the mine’s published history.
Coal quartz concentration
Quarterly mean · µg/m³ · not-voided samples
— No eligible measurements. * Quarter in progress. Means describe the available samples, not average exposure across the mine.
Quartz % is the sample’s quartz content; µg/m³ is its reported concentration. Personal C/E is the ratio to the limit published with that sample. Personal and area concentration units and void status are not specified in those source files.
| Date / sample | Dataset / analyte | Occupation / area | Measurement | Sample status | Published action |
|---|---|---|---|---|---|
| 58544923 / lab 2026011893 | Coal quartzQuartz | BULLDOZER OPERATORDESIGNATED WORK POSITION | 3 µg/m³3.7% quartz | Not voided | Not reported |
Sources and interpretation
- Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
- Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
- Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
- Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
- Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.
Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗
EIA + TITLE 30
EIA production and cited regulations
EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.
- LABOR HOURS
- 305,379
- AVG EMPLOYEES
- 184
- SUPPLY REGION
- Uinta Region
- UNION
- No union code published
- OPERATION
- Mine and Preparation Plant
- COMPANY TYPE
- Operating Subsidiary
1 published EIA row aggregated under this MSHA ID. Components remain available in JSON.
RECENT PUBLIC RECORDS
Recent violations and samples
Latest records retained for inspection; aggregates above use the full source history.
Coal dust, noise and other contaminants. Silica records above ↑
SOURCE COVERAGE
Reporting dates and coverage
17 datasets contain linked records. Missing datasets are listed below.
NOTES
Limitations
- Contractor production is entity-level and is never represented as mine-attributable.
- Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.