ALL STATUSES / CONTROLLER PORTFOLIO

Kiewit Peter Sons' Inc

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER IDC02111

MINE PORTFOLIO

5 of 5 mines and facilities

2025-01-01 – 2026-10-17. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Buckskin Mine4801200 · ActiveCampbell, WYSurface · MSHA: Coal (Bituminous)——342274.3
Grindstone4105586 · ActivePalo Pinto, TXSurface · MSHA: Crushed, Broken Limestone NEC——26251.0
Big Horn Coal Co4800090 · AbandonedSheridan, WYSurface · MSHA: Coal (Bituminous)——00—
Colowyo Mine0502962 · NonProducingMoffat, COSurface · MSHA: Coal (Bituminous)——137322.5
Rosebud Coal Sales Company4800084 · Abandoned and SealedCarbon, WYSurface · MSHA: Coal (Bituminous)——00—

LOCATION

Portfolio map

5 of 5 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-17Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

73

13 significant & substantial (S&S)

  1. 2025 Q18
  2. 2025 Q21
  3. 2025 Q317
  4. 2025 Q47
  5. 2026 Q112
  6. 2026 Q211
  7. 2026 Q317
  8. 2026 Q4 *0

Accident records

11

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q24
  3. 2025 Q33
  4. 2025 Q41
  5. 2026 Q11
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

26,785.00

62 of 73 violations with amounts

  1. 2025 Q11,324
  2. 2025 Q21,320
  3. 2025 Q39,798
  4. 2025 Q41,547
  5. 2026 Q17,818
  6. 2026 Q23,921
  7. 2026 Q31,057
  8. 2026 Q4 *—

On-site inspection hours

647.75

19 inspections · 19 with hours

  1. 2025 Q1113.50
  2. 2025 Q2100.75
  3. 2025 Q389.50
  4. 2025 Q416.50
  5. 2026 Q1151.50
  6. 2026 Q223.50
  7. 2026 Q3145.25
  8. 2026 Q4 *7.25
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1801,324.00102113.5
2025-Q2111,320.00404100.8
2025-Q31759,798.0030289.5
2025-Q4711,547.0010216.5
2026-Q11227,818.00103151.5
2026-Q21123,921.0000223.5
2026-Q31721,057.00103145.3
2026-Q4 *00—0017.3

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF033D04
    Colowyo Mine · 0502962

    Verbal Hazard Complaint Inspections · 7.3 on-site hours

  2. violation5034574
    Buckskin Mine · 4801200

    77.404(a)

  3. violation5033804
    Buckskin Mine · 4801200

    77.1104 · S&S

  4. violation5033803
    Buckskin Mine · 4801200

    77.410(b)

  5. violation5033802
    Buckskin Mine · 4801200

    77.1104 · S&S

  6. violation5033801
    Buckskin Mine · 4801200

    77.512

  7. violation5033800
    Buckskin Mine · 4801200

    77.1303(g)

  8. violation5033799
    Buckskin Mine · 4801200

    77.904

  9. violation5034569
    Buckskin Mine · 4801200

    77.807

  10. violation5033798
    Buckskin Mine · 4801200

    77.904

  11. violation5033797
    Buckskin Mine · 4801200

    77.1101(c)

  12. accident220262610001
    Colowyo Mine · 0502962

    HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    pulling/cutting liner. forgot blade was not retracted. cut arm above the wrist.

  13. inspectionF010EF7
    Buckskin Mine · 4801200

    Regular Safety and Health Inspection · 92.8 on-site hours

  14. violation5031256
    Colowyo Mine · 0502962

    77.1102 · $151.00 proposed

  15. violation5031255
    Colowyo Mine · 0502962

    77.404(a) · $151.00 proposed

  16. violation5031254
    Colowyo Mine · 0502962

    77.1110 · $151.00 proposed

  17. violation5031253
    Colowyo Mine · 0502962

    77.1110 · $151.00 proposed

  18. violation5031252
    Colowyo Mine · 0502962

    77.502 · $151.00 proposed

  19. violation5031251
    Colowyo Mine · 0502962

    77.1110 · $151.00 proposed

  20. inspectionF0196FC
    Colowyo Mine · 0502962

    Regular Safety and Health Inspection · 52.5 on-site hours

  21. inspectionF0196FD
    Colowyo Mine · 0502962

    Verbal Hazard Complaint Inspections · 0.0 on-site hours

  22. violation5031250
    Colowyo Mine · 0502962

    77.404(a) · $151.00 proposed

  23. violation5173598
    Grindstone · 4105586

    56.14100(b) · $151.00 proposed

  24. violation5173597
    Grindstone · 4105586

    56.14107(a) · $209.00 proposed

  25. violation5173596
    Grindstone · 4105586

    56.4201(a)(1) · $209.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-17.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-17 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS6,015,80185 rows · 8 receiving plants
HEAT CONTENT · BTU/LB8,503Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.33 / 5.34Separate averages over measured receipts
DELIVERED COST · USD/TON51.8544.8% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *1,563,9458,4080.295.1943.94
2025-Q41,405,4878,2290.405.3645.41
2026-Q11,362,9438,5770.335.1455.07
2026-Q21,359,8748,8070.355.9462.09
2026-Q3 *323,5528,5710.244.2748.60
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11526 · preliminaryBUCKSKIN MINE4801200Muscatine Plant #11167 · IA · BUCKSKIN58,57340.378,5720.234.30SpotSUBRail
2026-07EIA row 11899 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN62,032—Not published8,6100.264.20ContractSUBRail
2026-07EIA row 11900 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN138,996—Not published8,5350.234.30ContractSUBRail
2026-07EIA row 12202 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO15,99556.168,6340.264.30ContractSUBRail
2026-07EIA row 12204 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO47,95656.138,6010.234.20ContractSUBRail
2026-06EIA row 9474 · preliminaryBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN15,509—Not published8,4950.314.60ContractSUBRail
2026-06EIA row 9641 · preliminaryBUCKSKIN MINE4801200Muscatine Plant #11167 · IA · BUCKSKIN58,59039.768,5730.274.50SpotSUBRail
2026-06EIA row 10005 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN138,336—Not published8,5200.284.60ContractSUBRail
2026-06EIA row 10008 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN62,031—Not published8,6600.264.50ContractSUBRail
2026-06EIA row 10108 · preliminaryCOLOWYO MINE0502962Craig (CO)6021 · CO · COLOWYO MINE57,74277.969,5520.389.40ContractSUBRail
2026-06EIA row 10294 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO15,97555.938,6440.274.20ContractSUBRail
2026-06EIA row 10295 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO63,21154.948,5400.284.50ContractSUBRail
2026-05EIA row 7834 · preliminaryBUCKSKIN MINE4801200Muscatine Plant #11167 · IA · BUCKSKIN73,08538.868,4770.304.90SpotSUBRail
2026-05EIA row 8164 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN31,036—Not published8,5000.394.90ContractSUBRail
2026-05EIA row 8165 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN155,095—Not published8,5100.294.90ContractSUBRail
2026-05EIA row 8262 · preliminaryCOLOWYO MINE0502962Craig (CO)6021 · CO · COLOWYO MINE128,36877.429,4900.4110.30ContractSUBRail
2026-05EIA row 8428 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO15,97050.668,5690.404.90ContractSUBRail
2026-05EIA row 8434 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO63,40853.168,4930.314.90ContractSUBRail
2026-04EIA row 5864 · preliminaryBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN46,719—Not published8,4850.395.30ContractSUBRail
2026-04EIA row 6001 · preliminaryBUCKSKIN MINE4801200Muscatine Plant #11167 · IA · BUCKSKIN58,61937.478,4660.805.00SpotSUBRail
2026-04EIA row 6347 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN77,094—Not published8,5550.414.90ContractSUBRail
2026-04EIA row 6348 · preliminaryBUCKSKIN MINE4801200W A Parish3470 · TX · BUCKSKIN108,554—Not published8,4750.375.00ContractSUBRail
2026-04EIA row 6457 · preliminaryCOLOWYO MINE0502962Craig (CO)6021 · CO · COLOWYO MINE174,55179.559,6960.348.10ContractSUBRail
2026-04EIA row 6642 · preliminaryBUCKSKIN MINE4801200Scherer6257 · GA · BUCKSKIN MINING CO15,98150.578,4740.364.70ContractSUBRail
2026-03EIA row 4010 · preliminaryBUCKSKIN MINE4801200Limestone298 · TX · BUCKSKIN15,517—Not published8,5300.314.80ContractSUBRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-17. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON22.52Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS8,480,841Allocated from published county sales
ESTIMATED COAL REVENUE · USD191,018,720Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%2 of 2 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Colowyo Mine0502962 · Moffat, Colorado1,713,91955.971,728,78396,759,987County allocation estimate32.95% of eligible county production4 eligible mines / 4 sales respondents
Buckskin Mine4801200 · Campbell, Wyoming6,752,57013.966,752,05894,258,733County allocation estimate3.97% of eligible county production11 eligible mines / 11 sales respondents
Rosebud Coal Sales Company4800084 · Location unavailable————No matching annual production record
Big Horn Coal Co4800090 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

4 linked operators.

Relationships reflect the selected mine status and current MSHA controller/operator fields.