MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

Buckskin Mine

ActiveSurfaceCoal (Bituminous)
MSHA MINE ID4801200
LOCATIONCampbell, WY
PUBLIC RECORD7,336 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

34

9 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q317
  4. 2025 Q40
  5. 2026 Q17
  6. 2026 Q20
  7. 2026 Q310
  8. 2026 Q4 *0

Accident records

2

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q32
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

14,084.00

23 of 34 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q39,798
  4. 2025 Q4—
  5. 2026 Q14,286
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

274.25

7 inspections · 7 with hours

  1. 2025 Q1—
  2. 2025 Q26.75
  3. 2025 Q389.50
  4. 2025 Q41.75
  5. 2026 Q183.50
  6. 2026 Q2—
  7. 2026 Q392.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q200—0026.8
2025-Q31759,798.0020289.5
2025-Q400—0011.8
2026-Q1724,286.0000183.5
2026-Q200—000—
2026-Q3102—00192.8
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5034574

    77.404(a)

  2. violation5033804

    77.1104 · S&S

  3. violation5033803

    77.410(b)

  4. violation5033802

    77.1104 · S&S

  5. violation5033801

    77.512

  6. violation5033800

    77.1303(g)

  7. violation5033799

    77.904

  8. violation5034569

    77.807

  9. violation5033798

    77.904

  10. violation5033797

    77.1101(c)

  11. inspectionF010EF7

    Regular Safety and Health Inspection · 92.8 on-site hours

  12. violation9732831

    77.404(a) · S&S · $755.00 proposed

  13. violation9732830

    77.1110 · $151.00 proposed

  14. violation9732829

    77.1607(b) · S&S · $2,503.00 proposed

  15. violation9733015

    77.502 · $398.00 proposed

  16. violation9732828

    77.2104(b) · $151.00 proposed

  17. violation9732827

    77.106 · $151.00 proposed

  18. violation9732826

    77.410(a)(1) · $177.00 proposed

  19. inspectionF00F36F

    Regular Safety and Health Inspection · 83.5 on-site hours

  20. inspectionF0065CB

    Compliance Follow-up Inspection · 1.8 on-site hours

  21. violation5034125

    77.807 · $151.00 proposed

  22. violation5034124

    47.42(a) · $177.00 proposed

  23. violation5033706

    77.205(b) · $177.00 proposed

  24. violation9732353

    77.509(c) · $177.00 proposed

  25. violation9732352

    77.502 · $177.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS5,377,68479 rows · 7 receiving plants
HEAT CONTENT · BTU/LB8,358Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.33 / 4.99Separate averages over measured receipts
DELIVERED COST · USD/TON43.2538.2% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *1,422,5548,2620.284.9135.88
2025-Q41,405,4878,2290.405.3645.41
2026-Q11,226,8788,4280.334.9947.75
2026-Q2999,2138,5210.354.8045.83
2026-Q3 *323,5528,5710.244.2748.60
Month / sourceReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11526 · preliminaryMuscatine Plant #11167 · IA · BUCKSKIN58,57340.378,5720.234.30SpotSUBRail
2026-07EIA row 11899 · preliminaryW A Parish3470 · TX · BUCKSKIN62,032—Not published8,6100.264.20ContractSUBRail
2026-07EIA row 11900 · preliminaryW A Parish3470 · TX · BUCKSKIN138,996—Not published8,5350.234.30ContractSUBRail
2026-07EIA row 12202 · preliminaryScherer6257 · GA · BUCKSKIN MINING CO15,99556.168,6340.264.30ContractSUBRail
2026-07EIA row 12204 · preliminaryScherer6257 · GA · BUCKSKIN MINING CO47,95656.138,6010.234.20ContractSUBRail
2026-06EIA row 9474 · preliminaryLimestone298 · TX · BUCKSKIN15,509—Not published8,4950.314.60ContractSUBRail
2026-06EIA row 9641 · preliminaryMuscatine Plant #11167 · IA · BUCKSKIN58,59039.768,5730.274.50SpotSUBRail
2026-06EIA row 10005 · preliminaryW A Parish3470 · TX · BUCKSKIN138,336—Not published8,5200.284.60ContractSUBRail
2026-06EIA row 10008 · preliminaryW A Parish3470 · TX · BUCKSKIN62,031—Not published8,6600.264.50ContractSUBRail
2026-06EIA row 10294 · preliminaryScherer6257 · GA · BUCKSKIN MINING CO15,97555.938,6440.274.20ContractSUBRail
2026-06EIA row 10295 · preliminaryScherer6257 · GA · BUCKSKIN MINING CO63,21154.948,5400.284.50ContractSUBRail
2026-05EIA row 7834 · preliminaryMuscatine Plant #11167 · IA · BUCKSKIN73,08538.868,4770.304.90SpotSUBRail
2026-05EIA row 8164 · preliminaryW A Parish3470 · TX · BUCKSKIN31,036—Not published8,5000.394.90ContractSUBRail
2026-05EIA row 8165 · preliminaryW A Parish3470 · TX · BUCKSKIN155,095—Not published8,5100.294.90ContractSUBRail
2026-05EIA row 8428 · preliminaryScherer6257 · GA · BUCKSKIN MINING CO15,97050.668,5690.404.90ContractSUBRail
2026-05EIA row 8434 · preliminaryScherer6257 · GA · BUCKSKIN MINING CO63,40853.168,4930.314.90ContractSUBRail
2026-04EIA row 5864 · preliminaryLimestone298 · TX · BUCKSKIN46,719—Not published8,4850.395.30ContractSUBRail
2026-04EIA row 6001 · preliminaryMuscatine Plant #11167 · IA · BUCKSKIN58,61937.478,4660.805.00SpotSUBRail
2026-04EIA row 6347 · preliminaryW A Parish3470 · TX · BUCKSKIN77,094—Not published8,5550.414.90ContractSUBRail
2026-04EIA row 6348 · preliminaryW A Parish3470 · TX · BUCKSKIN108,554—Not published8,4750.375.00ContractSUBRail
2026-04EIA row 6642 · preliminaryScherer6257 · GA · BUCKSKIN MINING CO15,98150.578,4740.364.70ContractSUBRail
2026-03EIA row 4010 · preliminaryLimestone298 · TX · BUCKSKIN15,517—Not published8,5300.314.80ContractSUBRail
2026-03EIA row 4013 · preliminaryLimestone298 · TX · BUCKSKIN15,407—Not published8,4350.386.50ContractSUBRail
2026-03EIA row 4190 · preliminaryMuscatine Plant #11167 · IA · BUCKSKIN73,03036.638,4360.365.50SpotSUBRail
2026-03EIA row 4536 · preliminaryW A Parish3470 · TX · BUCKSKIN46,516—Not published8,4100.365.30ContractSUBRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON13.96Published county average
ESTIMATED SALES · SHORT TONS6,752,058Allocated from published county sales
ESTIMATED COAL REVENUE · USD94,258,733Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Buckskin Mine4801200 · Campbell, Wyoming6,752,57013.966,752,05894,258,733County allocation estimate3.97% of eligible county production11 eligible mines / 11 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYKiewit Peter Sons' Inc → Buckskin Mining Company → Buckskin Mine
HISTORY RECORDS618 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

Kiewit Peter Sons' InccontrolsBuckskin Mining CompanyoperatesBuckskin Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4801200
—

Kiewit Peter Sons' InccontrolsKiewit Mining Group Inc.operatesBuckskin Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4801200
—

Vulcan PartnerscontrolsTriton Coal Company LlcoperatesBuckskin Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4801200
—

Horizon Natural Resources IncorporatedcontrolsTriton Coal CompanyoperatesBuckskin Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4801200
—

Zeigler Coal Holding CompanycontrolsTriton Coal CompanyoperatesBuckskin Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4801200
—

Shell Oil CompanycontrolsTriton Coal CompanyoperatesBuckskin Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4801200
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

122 historical accident/injury rows; 0 coded fatalities and 1,018 lost days across the published record.

ACCIDENT + INJURY RECORD35 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

431 violation rows across the full record; 72 carry an S&S flag and $185,493 appears in current assessed amounts.

ENFORCEMENT ACTIVITY154 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

519 coal dust; 27 coal quartz; 204 noise. 0 personal-sample rows have a published C/E ratio above 1; 14 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE750 samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

49K employee hours and 102 summed average employees across reported subunits in the latest published quarter.

2026-Q21M tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

15 contested-violation rows, 15 civil-penalty docket/decision rows, and 2 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE32 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT24 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

132 inspection events and 7K published inspection hours across the historical record.

OVERSIGHT COVERAGE28 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records22 coal · 0 personal · 0 area
Sample status2 not voided0 voided · 0 status not reported
Mean coal quartz concentration7.5 µg/m³2 eligible measurements · 0 missing concentration
2026 · Feb 26, 2026–Sep 22, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58000938 / lab 2026040114Coal quartzQuartzHIGHWALL DRILL OPERATORDESIGNATED WORK POSITION8 µg/m³3.7% quartzNot voidedNot reported
58541956 / lab 2026007760Coal quartzQuartzHIGHWALL DRILL OPERATORDESIGNATED WORK POSITION7 µg/m³1.1% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

EIA MINE CONTEXT2024 record
ANNUAL COAL PRODUCTION6,752,570short tons
LABOR HOURS
277,580
AVG EMPLOYEES
180
SUPPLY REGION
Powder River Basin
UNION
No union code published
OPERATION
Mine and Preparation Plant
COMPANY TYPE
Independent Producer Operator

1 published EIA row aggregated under this MSHA ID. Components remain available in JSON.

TITLE 30 CROSSWALKCurrent through 2026-08-19

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
503457477.404(a)Citation
503380477.1104S&S
503380377.410(b)Citation
503380277.1104S&S
503380177.512Citation
503380077.1303(g)Citation
503379977.904Citation
503456977.807Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustHIGHWALL DRILL OPERATOR
.24 mg/m³Not voided
Coal dustCLEANUP MAN
.005 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.019 mg/m³Not voided
Coal dustREFUSE TRUCK DRIVER/BACKFILL TRUCK DRIVE
.013 mg/m³Not voided
Coal dustHIGHWALL DRILL OPERATOR
.232 mg/m³Not voided
Coal dustROAD GRADER OPERATOR
.039 mg/m³Not voided
NoiseOILER/GREASER
PEL dose: 7%Action-level dose: 20%
NoiseREFUSE TRUCK DRIVER/BACKFILL TRUCK DRIVE
PEL dose: 1%Action-level dose: 10%

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors122Jan 13, 2000—Sep 17, 2025mine-keyed
Addresses of Recordidentity · logistics1Oct 18, 1982—Oct 18, 1982mine-keyed
Assessed Violationscompliance · legal420Jan 22, 2001—Mar 4, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal15Feb 27, 2013—May 23, 2025mine-keyed
Coal Dust Sampleshealth · safety519Mar 6, 2000—Sep 22, 2026mine-keyed
Conferencescompliance · legal2Sep 3, 2004—Mar 27, 2012mine-keyed
Contested Violationscompliance · legal15Sep 29, 2011—Oct 16, 2024mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety4,176Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety867Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance6Nov 1, 1978—May 4, 2015mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance318Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance80Not published—Not publishedmine-keyed
Inspectionssafety · compliance132Mar 1, 2000—Sep 9, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment204Mar 7, 2000—Sep 22, 2026mine-keyed
Quartz Samples — Coalhealth · safety27Jul 12, 2000—Sep 22, 2026mine-keyed
Violationscompliance · safety · legal431Jan 22, 2001—Sep 25, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.