ACTIVE / OPERATOR PORTFOLIO

Harman Branch Mining Inc

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0050384

MINE PORTFOLIO

1 of 1 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Mine No 24609207 · Active6/8 quarters reportedMcdowell, WVUnderground · MSHA: Coal (Bituminous)105,44640,668731450.8

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

73

8 significant & substantial (S&S)

  1. 2025 Q19
  2. 2025 Q27
  3. 2025 Q314
  4. 2025 Q412
  5. 2026 Q16
  6. 2026 Q27
  7. 2026 Q318
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

18,181.00

71 of 73 violations with amounts

  1. 2025 Q13,851
  2. 2025 Q22,357
  3. 2025 Q33,650
  4. 2025 Q43,329
  5. 2026 Q1906
  6. 2026 Q21,057
  7. 2026 Q33,031
  8. 2026 Q4 *—

On-site inspection hours

450.75

12 inspections · 12 with hours

  1. 2025 Q144.00
  2. 2025 Q233.50
  3. 2025 Q372.25
  4. 2025 Q465.25
  5. 2026 Q196.00
  6. 2026 Q265.50
  7. 2026 Q374.25
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q1913,851.0000244.0
2025-Q2712,357.0000233.5
2025-Q31433,650.0000272.3
2025-Q41213,329.0000265.3
2026-Q160906.0010196.0
2026-Q2701,057.0000165.5
2026-Q31823,031.0000274.3
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF00CDD9
    Mine No 2 · 4609207

    Spot Inspection · 7.0 on-site hours

  2. violation5132066
    Mine No 2 · 4609207

    75.370(a)(1) · $151.00 proposed

  3. violation5132065
    Mine No 2 · 4609207

    75.333(c)(2) · $151.00 proposed

  4. violation5132064
    Mine No 2 · 4609207

    75.1403

  5. violation5132063
    Mine No 2 · 4609207

    75.400 · $151.00 proposed

  6. violation5132062
    Mine No 2 · 4609207

    75.1731(a) · $151.00 proposed

  7. violation5132061
    Mine No 2 · 4609207

    75.1103-8(c) · $151.00 proposed

  8. violation5132060
    Mine No 2 · 4609207

    75.400 · $151.00 proposed

  9. violation5132059
    Mine No 2 · 4609207

    75.516 · $151.00 proposed

  10. violation5132058
    Mine No 2 · 4609207

    75.370(a)(1) · S&S · $245.00 proposed

  11. violation5132057
    Mine No 2 · 4609207

    75.604(b) · $151.00 proposed

  12. violation5132056
    Mine No 2 · 4609207

    75.342(a)(4) · $151.00 proposed

  13. violation5132055
    Mine No 2 · 4609207

    75.604(b) · S&S · $504.00 proposed

  14. violation5132054
    Mine No 2 · 4609207

    75.400 · $151.00 proposed

  15. violation5132053
    Mine No 2 · 4609207

    75.503 · $151.00 proposed

  16. violation5132052
    Mine No 2 · 4609207

    75.811 · $151.00 proposed

  17. violation5132051
    Mine No 2 · 4609207

    Description not reported · $168.00 proposed

  18. violation5132050
    Mine No 2 · 4609207

    75.1714-5 · $151.00 proposed

  19. violation5132049
    Mine No 2 · 4609207

    75.220(a)(1) · $151.00 proposed

  20. inspection7047949
    Mine No 2 · 4609207

    Regular Safety and Health Inspection · 67.3 on-site hours

  21. violation5132023
    Mine No 2 · 4609207

    75.310(a)(3) · $151.00 proposed

  22. violation5132022
    Mine No 2 · 4609207

    75.400 · $151.00 proposed

  23. violation5132021
    Mine No 2 · 4609207

    75.516 · $151.00 proposed

  24. violation5132020
    Mine No 2 · 4609207

    75.1100-3 · $151.00 proposed

  25. violation5132019
    Mine No 2 · 4609207

    75.1107-1(a)(3)(ii) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this operator in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON150.07Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS123,164Allocated from published county sales
ESTIMATED COAL REVENUE · USD18,483,250Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Mine No 24609207 · Mcdowell, West Virginia121,926150.07123,16418,483,250County allocation estimate6.42% of eligible county production10 eligible mines / 10 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.