MSHA DATABASEMSHA records · 16 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

Surface Mine 1

NonProducingSurfaceCoal (Bituminous)
MSHA MINE ID4609632
LOCATIONMingo, WV
PUBLIC RECORD617 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

32

5 significant & substantial (S&S)

  1. 2025 Q12
  2. 2025 Q26
  3. 2025 Q30
  4. 2025 Q422
  5. 2026 Q10
  6. 2026 Q22
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q21
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

5,896.00

32 of 32 violations with amounts

  1. 2025 Q1302
  2. 2025 Q2906
  3. 2025 Q3—
  4. 2025 Q44,386
  5. 2026 Q1—
  6. 2026 Q2302
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

255.00

8 inspections · 8 with hours

  1. 2025 Q134.00
  2. 2025 Q266.25
  3. 2025 Q3—
  4. 2025 Q4136.25
  5. 2026 Q114.50
  6. 2026 Q24.00
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q120302.0000134.0
2025-Q260906.0010166.3
2025-Q300—000—
2025-Q42254,386.00003136.3
2026-Q100—00214.5
2026-Q220302.000014.0
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF022927

    Regular Safety and Health Inspection · 4.0 on-site hours

  2. violation5133648

    77.208(d) · $151.00 proposed

  3. violation5133647

    77.1110 · $151.00 proposed

  4. inspectionF02EB98

    Spot Inspection · 11.0 on-site hours

  5. inspection7047862

    Spot Inspection · 3.5 on-site hours

  6. inspectionF011539

    Spot Inspection · 3.0 on-site hours

  7. violation5186165

    77.1606(c) · S&S · $151.00 proposed

  8. violation5186164

    77.1605(d) · $151.00 proposed

  9. violation5186163

    77.1605(a) · $151.00 proposed

  10. inspectionF03DF69

    Verbal Hazard Complaint Inspections · 6.0 on-site hours

  11. violation5186162

    77.1606(c) · $151.00 proposed

  12. violation5186161

    77.1606(c) · S&S · $398.00 proposed

  13. violation5186160

    77.205(d) · S&S · $245.00 proposed

  14. violation5186159

    77.1606(c) · $151.00 proposed

  15. violation5186158

    77.1606(c) · $151.00 proposed

  16. violation5186157

    77.1605(k) · $151.00 proposed

  17. violation5186156

    77.1004(b) · $165.00 proposed

  18. violation5186155

    77.404(a) · S&S · $165.00 proposed

  19. violation5186154

    77.1606(c) · S&S · $818.00 proposed

  20. violation5186153

    77.1605(l) · $151.00 proposed

  21. violation5186152

    77.1000 · $151.00 proposed

  22. violation5186151

    77.1605(k) · $165.00 proposed

  23. inspection7047857

    Regular Safety and Health Inspection · 127.3 on-site hours

  24. violation5186145

    77.1110 · $151.00 proposed

  25. violation5186144

    77.904 · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Published county average
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Surface Mine 14609632 · Mingo, West Virginia5,28093.46——Below EIA sales-reporting threshold8 eligible mines / 8 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYDaniel W Bunn → Mega Highwall Mining, LLC → Surface Mine 1
HISTORY RECORDS410 relationships
INTERVAL CHECK1 REVIEWcontroller/operator overlap
—

Daniel W BunncontrolsMega Highwall Mining, LLCoperatesSurface Mine 1

msha-controller-operator-history · controller/operator co-tenure derived on mine 4609632
—

Bens Creek Group PLCcontrolsBen's Creek Operations WV, LLCoperatesSurface Mine 1

msha-controller-operator-history · controller/operator co-tenure derived on mine 4609632
—

Ben's Creek LimitedcontrolsBen's Creek Operations WV, LLCoperatesSurface Mine 1

msha-controller-operator-history · controller/operator co-tenure derived on mine 4609632
—

MBU Capital Group LTD et alcontrolsBen's Creek Operations WV, LLCoperatesSurface Mine 1

msha-controller-operator-history · controller/operator co-tenure derived on mine 4609632
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

2 historical accident/injury rows; 0 coded fatalities and 6 lost days across the published record.

ACCIDENT + INJURY RECORD1 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

123 violation rows across the full record; 36 carry an S&S flag and $51,386 appears in current assessed amounts.

ENFORCEMENT ACTIVITY123 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHcontext

Occupational health samples

59 coal dust; 7 coal quartz; 15 noise. 0 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE81 samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

4K employee hours and 9 summed average employees across reported subunits in the latest published quarter.

2026-Q20 tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

10 contested-violation rows, 12 civil-penalty docket/decision rows, and 0 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE22 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT2 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

20 inspection events and 1K published inspection hours across the historical record.

OVERSIGHT COVERAGE20 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records11 coal · 0 personal · 0 area
Sample status1 not voided0 voided · 0 status not reported
Mean coal quartz concentration27 µg/m³1 eligible measurements · 0 missing concentration
2026 · Mar 24, 2026–Mar 24, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58594645 / lab 2026012759Coal quartzQuartzBULLDOZER OPERATORDESIGNATED WORK POSITION27 µg/m³6.9% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

EIA MINE CONTEXT2024 record
ANNUAL COAL PRODUCTION5,280short tons
LABOR HOURS
40,474
AVG EMPLOYEES
26
SUPPLY REGION
Appalachia Central
UNION
No union code published
OPERATION
Mine only
COMPANY TYPE
Independent Producer Operator

1 published EIA row aggregated under this MSHA ID. Components remain available in JSON.

TITLE 30 CROSSWALKCurrent through 2026-08-19

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
513364877.208(d)Citation
513364777.1110Citation
518616577.1606(c)S&S
518616477.1605(d)Citation
518616377.1605(a)Citation
518616277.1606(c)Citation
518616177.1606(c)S&S
518616077.205(d)S&S
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustHIGHWALL DRILL OPERATOR
.087 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.353 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.064 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.399 mg/m³Not voided
Coal dustHIGHWALL DRILL OPERATOR
0 mg/m³Not voided
Coal dustHIGHWALL DRILL OPERATOR
.021 mg/m³Voided · CONTROL FILTER VOID
Coal dustBULLDOZER OPERATOR
.043 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.267 mg/m³Not voided

SOURCE COVERAGE

Reporting dates and coverage

16 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors2Aug 4, 2003—Jun 5, 2025mine-keyed
Addresses of Recordidentity · logistics1Jul 28, 2026—Jul 28, 2026mine-keyed
Assessed Violationscompliance · legal117Dec 19, 2022—May 21, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal12Jul 6, 2023—Apr 25, 2025mine-keyed
Coal Dust Sampleshealth · safety59Jan 10, 2023—Apr 15, 2026mine-keyed
Conferencescompliance · legal—No published rowsabsent / not applicable
Contested Violationscompliance · legal10Dec 19, 2022—Aug 2, 2023mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety177Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety50Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance4Sep 1, 2022—Oct 10, 2024mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance14Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance5Not published—Not publishedmine-keyed
Inspectionssafety · compliance20Dec 19, 2022—May 21, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment15Jan 10, 2023—Jul 15, 2025mine-keyed
Quartz Samples — Coalhealth · safety7Jul 31, 2023—Mar 24, 2026mine-keyed
Violationscompliance · safety · legal123Dec 19, 2022—May 21, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.