ACTIVE / CONTROLLER PORTFOLIO

Daniel W Bunn

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA CONTROLLER ID0101029

MINE PORTFOLIO

7 of 7 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Addcar System 381800813 · Active6/8 quarters reportedWarrick, INSurface · MSHA: Coal (Bituminous)233,46018,63411090.3
ADDCAR System 40 HWM Serial No. 230401202445 · Active6/8 quarters reportedSullivan, INSurface · MSHA: Coal (Bituminous)828,36661,4691183.0
Glen Alum Plant4608122 · Active6/8 quarters reportedMingo, WVFacility · MSHA: Coal (Bituminous)032,736220182.3
SHM-711519809 · Active6/8 quarters reportedMingo, WVSurface · MSHA: Coal (Bituminous)236,43616,31614177.5
SHM System-774407288 · Active6/8 quarters reportedWarrick, INSurface · MSHA: Coal (Bituminous)151,26831,7561088.3
SHM System-814407313 · Active6/8 quarters reportedMcdowell, WVSurface · MSHA: Coal (Bituminous)408,68734,99416081.5
Talley Hollow Surface Mine4609658 · Active6/8 quarters reportedMingo, WVSurface · MSHA: Coal (Bituminous)111,61424,23114179.5

LOCATION

Portfolio map

7 of 7 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

79

18 significant & substantial (S&S)

  1. 2025 Q14
  2. 2025 Q211
  3. 2025 Q33
  4. 2025 Q49
  5. 2026 Q117
  6. 2026 Q234
  7. 2026 Q31
  8. 2026 Q4 *0

Accident records

3

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q21
  3. 2025 Q31
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

18,736.00

76 of 79 violations with amounts

  1. 2025 Q1618
  2. 2025 Q22,183
  3. 2025 Q3302
  4. 2025 Q42,575
  5. 2026 Q14,396
  6. 2026 Q28,662
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

682.25

40 inspections · 40 with hours

  1. 2025 Q132.25
  2. 2025 Q298.25
  3. 2025 Q378.00
  4. 2025 Q498.50
  5. 2026 Q192.00
  6. 2026 Q2237.25
  7. 2026 Q346.00
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q140618.0000432.3
2025-Q21122,183.0010698.3
2025-Q330302.0010778.0
2025-Q4922,575.0000398.5
2026-Q11744,396.0000692.0
2026-Q234108,662.00009237.3
2026-Q310—10546.0
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF016BAB
    Addcar System 38 · 1800813

    Spot Inspection · 4.8 on-site hours

  2. violation9780055
    Addcar System 38 · 1800813

    77.1607(n)

  3. inspectionF010197
    Talley Hollow Surface Mine · 4609658

    Spot Inspection · 6.5 on-site hours

  4. inspectionF02F685
    SHM System-81 · 4407313

    Regular Safety and Health Inspection · 13.5 on-site hours

  5. inspectionF01E460
    ADDCAR System 40 HWM Serial No. 23040 · 1202445

    Spot Inspection · 1.8 on-site hours

  6. accident220262230015
    Talley Hollow Surface Mine · 4609658

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Stacking boxes when the box underneath shifted/fell while their hand was still caught in the banding. As the box dropped, the band jerked their arm before the box reached the floor.

  7. inspectionF01E45F
    ADDCAR System 40 HWM Serial No. 23040 · 1202445

    Regular Safety and Health Inspection · 19.5 on-site hours

  8. violation5133692
    SHM-71 · 1519809

    77.502 · $267.00 proposed

  9. violation5133691
    Talley Hollow Surface Mine · 4609658

    77.1607(i) · S&S · $336.00 proposed

  10. violation5133678
    Talley Hollow Surface Mine · 4609658

    77.1102 · $151.00 proposed

  11. violation5133677
    Talley Hollow Surface Mine · 4609658

    77.404(a) · S&S · $226.00 proposed

  12. violation5131251
    Talley Hollow Surface Mine · 4609658

    77.1004(b) · S&S · $755.00 proposed

  13. violation5133690
    Talley Hollow Surface Mine · 4609658

    77.1606(c) · $151.00 proposed

  14. violation5133676
    SHM-71 · 1519809

    77.1703 · $151.00 proposed

  15. violation5133675
    SHM-71 · 1519809

    48.23(c)(3) · $151.00 proposed

  16. violation5133674
    SHM-71 · 1519809

    77.502 · $883.00 proposed

  17. violation5133689
    Talley Hollow Surface Mine · 4609658

    77.1605(k) · S&S · $226.00 proposed

  18. inspectionF017B5B
    SHM System-77 · 4407288

    Regular Safety and Health Inspection · 22.0 on-site hours

  19. violation5222087
    Addcar System 38 · 1800813

    77.502 · $151.00 proposed

  20. violation5222086
    Addcar System 38 · 1800813

    77.404(a) · $151.00 proposed

  21. violation5222085
    Addcar System 38 · 1800813

    77.502 · S&S · $226.00 proposed

  22. violation5222084
    Addcar System 38 · 1800813

    77.206(e) · $151.00 proposed

  23. violation5222083
    Addcar System 38 · 1800813

    77.1110 · $151.00 proposed

  24. violation5222082
    Addcar System 38 · 1800813

    77.502 · $151.00 proposed

  25. violation5222081
    Addcar System 38 · 1800813

    77.404(a) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this controller in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON61.33Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS1,030,608Allocated from published county sales
ESTIMATED COAL REVENUE · USD63,211,444Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%5 of 5 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Addcar System 40 Hwm Serial No1202445 · Moffat, Colorado479,99655.97484,15927,098,367County allocation estimate9.23% of eligible county production4 eligible mines / 4 sales respondents
Addcar System 381800813 · Warrick, Indiana239,16652.34254,21713,305,719County allocation estimate9.02% of eligible county production4 eligible mines / 4 sales respondents
Shm System-814407313 · Mingo, West Virginia115,41593.46118,18411,045,435County allocation estimate4.49% of eligible county production8 eligible mines / 8 sales respondents
Shm System-774407288 · Warrick, Indiana112,82152.34119,9216,276,663County allocation estimate4.25% of eligible county production4 eligible mines / 4 sales respondents
Shm-711519809 · Wise, Virginia54,079101.3454,1275,485,259County allocation estimate22.46% of eligible county production4 eligible mines / 4 sales respondents
Glen Alum Plant4608122 · Mingo, West Virginia093.46——Preparation plant8 eligible mines / 8 sales respondents
Talley Hollow Surface Mine4609658 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked operator.

Relationships reflect the selected mine status and current MSHA controller/operator fields.