  1. Spot Inspection

    inspectionRecord F039584
    MINE #9 · 4407217

    10.5 on-site hours reported

  2. Flammable liquids; storage.

    violationRecord 9270129
    MINE #9 · 4407217

    30 CFR 77.1103(a)

  3. Permanent splicing of trailing cables.

    violationRecord 9272425
    MINE #9 · 4407217

    30 CFR 75.604(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty

  4. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 9272424
    MINE #9 · 4407217

    30 CFR 75.1101-10 · $151.00 proposed penalty

  5. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 9272423
    MINE #9 · 4407217

    30 CFR 75.1101-10 · $151.00 proposed penalty

  6. Electric equipment; examination, testing and maintenance.

    violationRecord 9272422
    MINE #9 · 4407217

    30 CFR 75.512 · $313.00 proposed penalty

  7. Mine ventilation plan; submission and approval.

    violationRecord 9272421
    MINE #9 · 4407217

    30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $755.00 proposed penalty

  8. Machinery and equipment; operation and maintenance.

    violationRecord 9272219
    MINE #9 · 4407217

    30 CFR 77.404(a) · Significant and substantial (S&S)

  9. Automatic fire warning devices; actions and response.

    violationRecord 9271788
    MINE #9 · 4407217

    30 CFR 75.1103-5(a) · Significant and substantial (S&S)

  10. Automatic fire warning devices; actions and response.

    violationRecord 9271787
    MINE #9 · 4407217

    30 CFR 75.1103-5(a)(1) · Significant and substantial (S&S)

  11. Automatic fire warning devices; actions and response.

    violationRecord 9271786
    MINE #9 · 4407217

    30 CFR 75.1103-5(a)(2) · Significant and substantial (S&S) · $697.00 proposed penalty

  12. Automatic fire sensor and warning device systems; examination and test requirements.

    violationRecord 9271785
    MINE #9 · 4407217

    30 CFR 75.1103-8(b) · $151.00 proposed penalty

  13. Ventilation controls.

    violationRecord 9272412
    MINE #9 · 4407217

    30 CFR 75.333(h) · $151.00 proposed penalty

  14. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9272411
    MINE #9 · 4407217

    30 CFR 75.1731(b) · $151.00 proposed penalty

  15. Water sprinkler systems; general.

    violationRecord 9272410
    MINE #9 · 4407217

    30 CFR 75.1101-6 · $151.00 proposed penalty

  16. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 9272409
    MINE #9 · 4407217

    30 CFR 75.1731(b) · $151.00 proposed penalty

  17. Protection from falls of roof, face and ribs.

    violationRecord 9272915
    MINE #9 · 4407217

    30 CFR 75.202(a) · $151.00 proposed penalty

  18. Electric wiring and equipment; installation and maintenance.

    violationRecord 9272408
    MINE #9 · 4407217

    30 CFR 77.516 · Significant and substantial (S&S) · $592.00 proposed penalty

  19. Escapeways; bituminous and lignite mines.

    violationRecord 9272407
    MINE #9 · 4407217

    30 CFR 75.380(d)(7)(iv) · $177.00 proposed penalty

  20. Travelways at surface installations.

    violationRecord 9272406
    MINE #9 · 4407217

    30 CFR 77.205(b) · Significant and substantial (S&S) · $177.00 proposed penalty

  21. Main mine fan examinations and records.

    violationRecord 9272405
    MINE #9 · 4407217

    30 CFR 75.312(h) · $151.00 proposed penalty

  22. Regular Safety and Health Inspection

    inspectionRecord F011C6D
    MINE #9 · 4407217

    129.3 on-site hours reported

  23. Fall of roof or back

    accidentRecord 220261950006
    MINE #9 · 4407217

    Accident only

    Accident narrative

    Roof fall in the return at spad #2417 between #1 and #2 entries. The fall was about 20' x 20' and 36" thick. The fall did not block the air course or travel way. It has been timbered off and dangered off.

  24. Communications facilities; refuge alternatives.

    violationRecord 8303600
    MINE #9 · 4407217

    30 CFR 75.1600-3(a)(1) · $151.00 proposed penalty

  25. Mine ventilation plan; submission and approval.

    violationRecord 8303599
    MINE #9 · 4407217

    30 CFR 75.370(a)(1) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.