Coal production
49,354,405reported short tons
ACTIVE / CONTROLLER PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| CARDINAL1517216 · Active6/8 quarters reported | Hopkins, KYUnderground · MSHA: Coal (Bituminous) | 6,732,314 | 1,639,125 | 1,093 | 76 | 10,522.3 |
| Excel #51519838 · Active6/8 quarters reported | Pike, KYUnderground · MSHA: Coal (Bituminous) | 959,134 | 504,585 | 275 | 20 | 3,924.0 |
| Gibson South1202388 · Active6/8 quarters reported | Gibson, INUnderground · MSHA: Coal (Bituminous) | 8,342,126 | 1,376,266 | 181 | 37 | 4,947.5 |
| Hamilton County Coal Processing1103242 · Active6/8 quarters reported | Hamilton, ILFacility · MSHA: Coal (Bituminous) | 0 | 118,925 | 8 | 4 | 278.5 |
| Henderson County Mine1502709 · Active6/8 quarters reported | Henderson, KYUnderground · MSHA: Coal (Bituminous) | 6,109,838 | 1,079,642 | 525 | 68 | 6,081.3 |
| Mettiki General1800671 · Active6/8 quarters reported | Garrett, MDFacility · MSHA: Coal (Bituminous) | 0 | 128,024 | 9 | 5 | 119.8 |
| Mid-America Carbonates LLC1103176 · Active6/8 quarters reported | Hardin, ILFacility · MSHA: Crushed, Broken Limestone NEC | 0 | 27,740 | 2 | 0 | 14.5 |
| MINE NO. 11103203 · Active6/8 quarters reported | Hamilton, ILUnderground · MSHA: Coal (Bituminous) | 8,095,575 | 1,211,252 | 315 | 40 | 4,558.0 |
| Mountain View Mine4609028 · Active6/8 quarters reported | Tucker, WVUnderground · MSHA: Coal (Bituminous) | 1,387,915 | 538,176 | 162 | 22 | 2,026.8 |
| Preparation Plant1517733 · Active6/8 quarters reported | Pike, KYFacility · MSHA: Coal (Bituminous) | 0 | 80,736 | 26 | 0 | 371.3 |
| River View Facilities1503178 · Active6/8 quarters reported | Union, KYFacility · MSHA: Coal (Bituminous) | 0 | 269,430 | 34 | 6 | 397.8 |
| RIVER VIEW MINE1519374 · Active6/8 quarters reported | Union, KYUnderground · MSHA: Coal (Bituminous) | 8,971,268 | 1,910,316 | 554 | 73 | 8,559.3 |
| TUNNEL RIDGE MINE4608864 · Active6/8 quarters reported | Ohio, WVUnderground · MSHA: Coal (Bituminous) | 8,756,235 | 1,710,129 | 224 | 50 | 4,257.3 |
| Warrior Preparation Plant1514335 · Active6/8 quarters reported | Hopkins, KYFacility · MSHA: Coal (Bituminous) | 0 | 124,119 | 10 | 0 | 354.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
14 of 14 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 14 mines listed under this controller were checked; 14 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 8,456,605 | 1,903,683 | 4.44 | 3,174 | 14/14 mines reporting |
| 2025 Q2 | 8,092,011 | 1,806,353 | 4.48 | 3,084 | 14/14 mines reporting |
| 2025 Q3 | 8,462,109 | 1,815,374 | 4.66 | 3,109 | 14/14 mines reporting |
| 2025 Q4 | 8,134,225 | 1,718,106 | 4.73 | 3,082 | 14/14 mines reporting |
| 2026 Q1 | 7,983,752 | 1,759,338 | 4.54 | 3,010 | 14/14 mines reporting |
| 2026 Q2 | 8,225,703 | 1,715,611 | 4.79 | 2,935 | 14/14 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
690 significant & substantial (S&S)
1 records classified as fatality
3,210 of 3,418 violations with amounts
1,011 inspections · 1,011 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 416 | 80 | 184,864.00 | 55 | 0 | 141 | 6,095.8 |
| 2025-Q2 | 566 | 96 | 250,886.00 | 49 | 0 | 145 | 6,729.0 |
| 2025-Q3 | 532 | 87 | 240,859.00 | 71 | 0 | 146 | 6,888.8 |
| 2025-Q4 | 430 | 113 | 223,297.00 | 53 | 1 | 126 | 6,731.8 |
| 2026-Q1 | 429 | 98 | 238,348.00 | 49 | 0 | 122 | 6,319.8 |
| 2026-Q2 | 527 | 98 | 214,411.00 | 58 | 0 | 147 | 6,863.0 |
| 2026-Q3 | 444 | 103 | 172,406.00 | 65 | 0 | 155 | 6,183.5 |
| 2026-Q4 * | 74 | 15 | — | 1 | 0 | 29 | 601.0 |
All violations issued in the selected period. Counts combine subsections.
77.502 · $151.00 proposed
75.517 · S&S · $883.00 proposed
75.370(a)(1) · $1,550.00 proposed
75.517 · S&S · $883.00 proposed
75.517 · S&S · $883.00 proposed
75.342(a)(4) · $165.00 proposed
75.503 · $151.00 proposed
75.400 · $366.00 proposed
75.403 · $1,968.00 proposed
75.403 · $1,968.00 proposed
75.403 · $1,126.00 proposed
75.403 · $1,968.00 proposed
75.370(a)(1) · $151.00 proposed
75.517 · $151.00 proposed
75.333(h) · $151.00 proposed
75.512 · $336.00 proposed
MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT
Employee was using a bolter wrench to tap the dust out of EE's drill steel. After striking the drill steel the employee struck self with the wrench in the mouth. It was determined on 8/11/25 that EE had a chipped tooth that would need repaired.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
On 7/31/25 the injured employee experienced discomfort in left upper back and shoulder area while performing longwall support duties. After initial medical evaluation, the employee continued to work normal job until being removed from work on 11/4/25 pending surgery, which is scheduled for 11/20/25.
75.370(a)(1) · $465.00 proposed
75.1107-16(c) · $226.00 proposed
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Employee was drilling a hole to install a pin when the steel became stuck. As they went to pull the steel out they felt a pain in their right shoulder. They continued to work their normal job until they were taken off work beginning 9/5/25 as they were unable to perform their normal job.
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Employee was lifting a man door for a brattice when they felt a sharp pain in lower back. They finished the shift, but when they awoke the next day, they were having lower back pain. EE was seen by a physician on 7/31/25 and was taken off work as they were unable to perform their normal job.
103(i) Spot Inspections · 4.0 on-site hours
103(i) Spot Inspections · 6.0 on-site hours
103(i) Spot Inspections · 6.8 on-site hours
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA source checks are overdue. Refresh receipts before serving this report.
Annual coal-price source checks are overdue. Refresh before serving estimates.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.