Warrior Coal LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Methane monitors.
CARDINAL · 151721630 CFR 75.342(a)(4) · Significant and substantial (S&S) · $818.00 proposed penalty
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
CARDINAL · 151721630 CFR 75.1731(b) · $288.00 proposed penalty
Permissible electric face equipment; maintenance.
CARDINAL · 151721630 CFR 75.503 · $267.00 proposed penalty
Power wires and cables; insulation and protection.
CARDINAL · 151721630 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Power wires and cables; insulation and protection.
CARDINAL · 151721630 CFR 75.517 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Permanent splicing of trailing cables.
CARDINAL · 151721630 CFR 75.604(b) · $432.00 proposed penalty
Roof control plan.
CARDINAL · 151721630 CFR 75.220(a)(1) · $366.00 proposed penalty
Permissible electric face equipment; maintenance.
CARDINAL · 151721630 CFR 75.503 · $245.00 proposed penalty
Permanent splicing of trailing cables.
CARDINAL · 151721630 CFR 75.604(b) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Exploding vessels under pressure
CARDINAL · 1517216Days away from work only
Accident narrative
Employee had finished bolting the #6 entry on the #4 unit and was standing beside the roof bolter between the dust box and the boom when a hose fitting broke causing the employee to get oil in their eyes. Employee was treated for a scratch to their eye.
Maintenance of belt conveyors and belt conveyor entries.
CARDINAL · 151721630 CFR 75.1731(a) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
CARDINAL · 151721630 CFR 75.1731(a) · $151.00 proposed penalty
Belt air course ventilation.
CARDINAL · 151721630 CFR 75.350(a)(2) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · $193.00 proposed penalty
Permanent splicing of trailing cables.
CARDINAL · 151721630 CFR 75.604(b) · Significant and substantial (S&S) · $642.00 proposed penalty
Power wires and cables; insulation and protection.
CARDINAL · 151721630 CFR 75.517 · Significant and substantial (S&S) · $883.00 proposed penalty
Spot Inspections
CARDINAL · 1517216103(i) · 7.5 on-site hours reported
Electric equipment; examination, testing and maintenance.
CARDINAL · 151721630 CFR 75.512 · $288.00 proposed penalty
Permanent splicing of trailing cables.
CARDINAL · 151721630 CFR 75.604(b) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Hoisting
CARDINAL · 1517216Accident only
Accident narrative
While testing the drum brake on the Hanson hoist it was discovered to allow the drum to move while under a load from the electric motor. The drum was found to have a residue that was removed and the system then passed the performed test.
Spot Inspections
CARDINAL · 1517216103(i) · 9.0 on-site hours reported
Methane monitors.
CARDINAL · 151721630 CFR 75.342(a)(4) · Significant and substantial (S&S) · $818.00 proposed penalty
Hoists; brakes, capability.
CARDINAL · 151721630 CFR 75.1400-1 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Permanent splicing of trailing cables.
CARDINAL · 151721630 CFR 75.604(b) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.