ACTIVE / OPERATOR PORTFOLIO

WARRIOR COAL LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDP24534

MINE PORTFOLIO

2 of 2 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
CARDINAL1517216 · Active6/8 quarters reportedHopkins, KYUnderground · MSHA: Coal (Bituminous)6,732,3141,639,1251,0827610,407.3
Warrior Preparation Plant1514335 · Active6/8 quarters reportedHopkins, KYFacility · MSHA: Coal (Bituminous)0124,119100354.5

LOCATION

Portfolio map

2 of 2 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

1,092

267 significant & substantial (S&S)

  1. 2025 Q1109
  2. 2025 Q2204
  3. 2025 Q3166
  4. 2025 Q4148
  5. 2026 Q1156
  6. 2026 Q2159
  7. 2026 Q3134
  8. 2026 Q4 *16

Accident records

76

0 records classified as fatality

  1. 2025 Q114
  2. 2025 Q27
  3. 2025 Q39
  4. 2025 Q49
  5. 2026 Q112
  6. 2026 Q213
  7. 2026 Q312
  8. 2026 Q4 *0

Proposed penalties · USD

590,232.00

1,023 of 1,092 violations with amounts

  1. 2025 Q163,502
  2. 2025 Q299,854
  3. 2025 Q387,077
  4. 2025 Q4120,698
  5. 2026 Q198,144
  6. 2026 Q271,468
  7. 2026 Q349,489
  8. 2026 Q4 *—

On-site inspection hours

10,761.75

196 inspections · 196 with hours

  1. 2025 Q11,267.50
  2. 2025 Q21,581.50
  3. 2025 Q31,634.50
  4. 2025 Q41,675.00
  5. 2026 Q11,641.50
  6. 2026 Q21,529.25
  7. 2026 Q31,393.25
  8. 2026 Q4 *39.25
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11093363,502.00140301,267.5
2025-Q22044499,854.0070221,581.5
2025-Q31663387,077.0090291,634.5
2025-Q414845120,698.0090291,675.0
2026-Q11564098,144.00120251,641.5
2026-Q21593471,468.00130301,529.3
2026-Q31343549,489.00120281,393.3
2026-Q4 *163—00339.3

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5221269
    CARDINAL · 1517216

    75.1714-8(a)(2)

  2. violation5221268
    CARDINAL · 1517216

    75.517 · S&S

  3. violation5221267
    CARDINAL · 1517216

    75.512

  4. violation5221211
    CARDINAL · 1517216

    75.370(a)(1)

  5. violation5221266
    CARDINAL · 1517216

    Description not reported

  6. violation5221210
    CARDINAL · 1517216

    75.517 · S&S

  7. violation5221209
    CARDINAL · 1517216

    75.220(a)(1)

  8. violation5221208
    CARDINAL · 1517216

    75.604(b) · S&S

  9. violation5045266
    CARDINAL · 1517216

    75.362(g)(3)

  10. inspectionF00AE9B
    CARDINAL · 1517216

    103(i) Spot Inspections · 6.8 on-site hours

  11. violation5045265
    CARDINAL · 1517216

    75.342(a)(4)

  12. violation5221207
    CARDINAL · 1517216

    75.370(a)(1)

  13. inspectionF035D57
    CARDINAL · 1517216

    103(i) Spot Inspections · 7.3 on-site hours

  14. violation5221265
    CARDINAL · 1517216

    Description not reported

  15. violation5047738
    CARDINAL · 1517216

    75.503

  16. violation5047737
    CARDINAL · 1517216

    75.606

  17. violation5047736
    CARDINAL · 1517216

    75.517

  18. inspectionF00AE9A
    CARDINAL · 1517216

    Regular Safety and Health Inspection · 25.3 on-site hours

  19. violation5221264
    CARDINAL · 1517216

    75.370(a)(1)

  20. inspectionF004936
    CARDINAL · 1517216

    Ventilation Technical Investigation · 14.0 on-site hours

  21. violation5048100
    CARDINAL · 1517216

    75.1403

  22. violation5048099
    CARDINAL · 1517216

    75.1714-4(e)

  23. inspectionF035D56
    CARDINAL · 1517216

    103(i) Spot Inspections · 7.3 on-site hours

  24. violation5221263
    CARDINAL · 1517216

    75.220(a)(1)

  25. violation5221262
    CARDINAL · 1517216

    75.220(a)(1)

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS4,430,90851 rows · 5 receiving plants
HEAT CONTENT · BTU/LB12,379Weighted by reported tons
SULFUR / ASH · % BY WEIGHT3.05 / 8.94Separate averages over measured receipts
DELIVERED COST · USD/TON71.51100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *736,29812,3903.088.9872.29
2025-Q41,123,89712,3673.078.9071.44
2026-Q11,083,85912,3393.019.1271.20
2026-Q21,150,47012,4123.068.7971.72
2026-Q3 *336,38412,4063.058.9270.32
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11369 · preliminaryCARDINAL1517216Seminole (FL)136 · FL · ALLIANCE COAL12,60476.8212,3703.099.40ContractBITRail
2026-07EIA row 11560 · preliminaryCARDINAL1517216Mill Creek (KY)1364 · KY · ALLIANCE COAL154,74373.1212,3843.078.90ContractBITRail
2026-07EIA row 12553 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL126,55464.4512,4433.038.80ContractBITRail
2026-07EIA row 12554 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL42,48375.7212,3853.059.20ContractBITRail
2026-06EIA row 9465 · preliminaryCARDINAL1517216Seminole (FL)136 · FL · ALLIANCE COAL36,97177.4712,3403.089.10ContractBITRail
2026-06EIA row 9670 · preliminaryCARDINAL1517216Mill Creek (KY)1364 · KY · ALLIANCE COAL154,95272.4012,4143.128.90ContractBITRail
2026-06EIA row 10605 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL123,21366.2812,3933.078.90ContractBITRail
2026-06EIA row 10606 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL54,27977.2412,4343.098.60ContractBITRail
2026-05EIA row 7664 · preliminaryCARDINAL1517216Seminole (FL)136 · FL · ALLIANCE COAL63,99877.3512,3253.117.90ContractBITRail
2026-05EIA row 7860 · preliminaryCARDINAL1517216Mill Creek (KY)1364 · KY · ALLIANCE COAL169,05172.6012,4523.148.80ContractBITRail
2026-05EIA row 8727 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL133,64065.9812,4353.078.70ContractBITRail
2026-05EIA row 8728 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL66,61974.9812,4303.099.00ContractBITRail
2026-04EIA row 5854 · preliminaryCARDINAL1517216Seminole (FL)136 · FL · ALLIANCE COAL65,01477.3512,3603.009.40ContractBITRail
2026-04EIA row 6033 · preliminaryCARDINAL1517216Mill Creek (KY)1364 · KY · ALLIANCE COAL151,42572.3712,4092.908.70ContractBITRail
2026-04EIA row 6939 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL94,19165.9112,4222.978.70ContractBITRail
2026-04EIA row 6940 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL37,11776.3812,4283.018.80ContractBITRail
2026-03EIA row 4001 · preliminaryCARDINAL1517216Seminole (FL)136 · FL · ALLIANCE COAL26,59877.6712,3203.119.80ContractBITRail
2026-03EIA row 4225 · preliminaryCARDINAL1517216Mill Creek (KY)1364 · KY · ALLIANCE COAL183,23872.0212,3973.038.80ContractBITRail
2026-03EIA row 5116 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL134,16865.2612,3373.069.40ContractBITRail
2026-03EIA row 5117 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL53,81276.3612,2533.029.40ContractBITRail
2026-02EIA row 2054 · preliminaryCARDINAL1517216Seminole (FL)136 · FL · ALLIANCE COAL14,28177.5312,2103.049.50ContractBITRail
2026-02EIA row 2242 · preliminaryCARDINAL1517216Mill Creek (KY)1364 · KY · ALLIANCE COAL190,21672.7312,4112.988.60ContractBITRail
2026-02EIA row 3216 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL133,02766.0312,2603.019.70ContractBITRail
2026-02EIA row 3217 · preliminaryCARDINAL1517216Calvert City8837 · KY · ALLIANCE COAL38,07875.4512,2213.019.60ContractBITRail
2026-01EIA row 38 · preliminaryCARDINAL1517216Seminole (FL)136 · FL · ALLIANCE COAL41,05976.8612,2702.979.30ContractBITRail
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Warrior Preparation Plant1514335 · Hopkins, Kentucky0———Preparation plant1 eligible mines / 1 sales respondents
Cardinal1517216 · Hopkins, Kentucky4,406,080———County sales or price not published1 eligible mines / 1 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.