Spot Inspections
CARDINAL · 1517216103(i) · 6.5 on-site hours reported
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Hazardous conditions and violations of mandatory health or safety standards; posting, correcting, and recording.
CARDINAL · 151721630 CFR 75.363(a) · $267.00 proposed penalty
Protection from falls of roof, face and ribs.
CARDINAL · 151721630 CFR 75.202(a) · Significant and substantial (S&S) · $755.00 proposed penalty
Methane monitors.
CARDINAL · 151721630 CFR 75.342(a)(4) · $165.00 proposed penalty
Hoisting
CARDINAL · 1517216Accident only
Accident narrative
An empty trailer was loaded on the 630 hoist and during it's travel to the surface came in contact with the shaft wall causing damage to the metal skirting.
Impoundment Spot Inspection
Warrior Preparation Plant · 15143356.0 on-site hours reported
Verbal Hazard Complaint Inspections
CARDINAL · 151721617.0 on-site hours reported
Permanent splicing of trailing cables.
CARDINAL · 151721630 CFR 75.604(b) · Significant and substantial (S&S) · $755.00 proposed penalty
Spot Inspections
CARDINAL · 1517216103(i) · 6.5 on-site hours reported
Short circuit protection; ratings and settings of circuit breakers.
CARDINAL · 151721630 CFR 75.601-1 · $245.00 proposed penalty
Permanent splicing of trailing cables.
CARDINAL · 151721630 CFR 75.604(b) · Significant and substantial (S&S) · $755.00 proposed penalty
Power wires and cables; insulation and protection.
CARDINAL · 151721630 CFR 75.517 · Significant and substantial (S&S) · $883.00 proposed penalty
Maintenance of incombustible content of rock dust.
CARDINAL · 151721630 CFR 75.403 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
CARDINAL · 151721630 CFR 75.512 · $288.00 proposed penalty
Power wires and cables; insulation and protection.
CARDINAL · 151721630 CFR 75.517 · Significant and substantial (S&S) · $1,968.00 proposed penalty
Violation — cited standard not reported
CARDINAL · 1517216$168.00 proposed penalty
Machinery and equipment; operation and maintenance.
CARDINAL · 151721630 CFR 75.1725(a) · $151.00 proposed penalty
Spot Inspections
CARDINAL · 1517216103(i) · 7.3 on-site hours reported
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · $465.00 proposed penalty
Mine ventilation plan; submission and approval.
CARDINAL · 151721630 CFR 75.370(a)(1) · $465.00 proposed penalty
Self-rescue devices; use and location requirements.
CARDINAL · 151721630 CFR 75.1714-2(c) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
CARDINAL · 151721630 CFR 75.202(a) · $336.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
CARDINAL · 151721630 CFR 75.1731(c) · Significant and substantial (S&S) · $1,219.00 proposed penalty
Accumulation of combustible materials.
CARDINAL · 151721630 CFR 75.400 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.