← Ramaco Resources, LLC

Ramaco Resources, LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Protection from falls of roof, face and ribs.

    violationRecord 5130809
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 75.202(a) · Significant and substantial (S&S) · $1,126.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5130808
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 75.400 · $642.00 proposed penalty

  3. Mine ventilation plan; submission and approval.

    violationRecord 5097509
    Laurel Fork Mine · 4609084

    30 CFR 75.370(a)(1) · $1,431.00 proposed penalty

  4. Accumulation of combustible materials.

    violationRecord 5097508
    Laurel Fork Mine · 4609084

    30 CFR 75.400 · $288.00 proposed penalty

  5. Permissible electric face equipment; maintenance.

    violationRecord 5097507
    Laurel Fork Mine · 4609084

    30 CFR 75.503 · $336.00 proposed penalty

  6. Mine ventilation plan; submission and approval.

    violationRecord 5097506
    Laurel Fork Mine · 4609084

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  7. Electric equipment; examination, testing and maintenance.

    violationRecord 5097505
    Laurel Fork Mine · 4609084

    30 CFR 75.512 · $336.00 proposed penalty

  8. Accumulation of combustible materials.

    violationRecord 9216667
    Berwind Deep Mine · 4609533

    30 CFR 75.400 · $313.00 proposed penalty

  9. Accumulation of combustible materials.

    violationRecord 9216666
    Berwind Deep Mine · 4609533

    30 CFR 75.400 · $697.00 proposed penalty

  10. Criteria—Haulage; general.

    violationRecord 9216665
    Berwind Deep Mine · 4609533

    30 CFR 75.1403-10(e) · $313.00 proposed penalty

  11. Electric wiring and equipment; installation and maintenance.

    violationRecord 3146825
    Berwind Deep Mine · 4609533

    30 CFR 77.516 · $313.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5098388
    NO. 2 GAS · 4609541

    30 CFR 75.370(a)(1) · $959.00 proposed penalty

  13. Preshift examination at fixed intervals.

    violationRecord 5098387
    NO. 2 GAS · 4609541

    30 CFR 75.360(f) · $151.00 proposed penalty

  14. Escapeway maps.

    violationRecord 5098386
    NO. 2 GAS · 4609541

    30 CFR 75.1505(b) · $366.00 proposed penalty

  15. Protection from falls of roof, face and ribs.

    violationRecord 5098385
    NO. 2 GAS · 4609541

    30 CFR 75.202(a) · $818.00 proposed penalty

  16. Spot Inspection

    inspectionRecord F010860
    Elk Creek Plant · 4602444

    4.5 on-site hours reported

  17. Preshift examination at fixed intervals.

    violationRecord 5130807
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 75.360(f) · $151.00 proposed penalty

  18. Permissible electric face equipment; maintenance.

    violationRecord 5130806
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 75.503 · $549.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 5092532
    Stonecoal Branch Mine No. 2 · 4608663

    30 CFR 75.202(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty

  20. Electric equipment other than power-connection points; outby the last open crosscut; return air; permissibility requirements.

    violationRecord 9216664
    Berwind Deep Mine · 4609533

    30 CFR 75.507-1(a) · $313.00 proposed penalty

  21. Permanent splicing of trailing cables.

    violationRecord 5098384
    Crucible Deep Mine · 4609614

    30 CFR 75.604(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  22. Drill dust control at underground areas of underground mines.

    violationRecord 5098383
    Crucible Deep Mine · 4609614

    30 CFR 72.630(b) · $313.00 proposed penalty

  23. Permanent splicing of trailing cables.

    violationRecord 5098382
    Crucible Deep Mine · 4609614

    30 CFR 75.604(b) · $432.00 proposed penalty

  24. Verbal Hazard Complaint Inspections

    inspectionRecord F01085F
    Elk Creek Plant · 4602444

    4.0 on-site hours reported

  25. Loading and haulage equipment; inspection and maintenance.

    violationRecord 5092328
    Elk Creek Plant · 4602444

    30 CFR 77.1606(c) · $151.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.