Ramaco Resources, LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Permissible electric face equipment; maintenance.
Laurel Fork Mine · 460908430 CFR 75.503 · $959.00 proposed penalty
Permissible electric face equipment; maintenance.
Laurel Fork Mine · 460908430 CFR 75.503 · Significant and substantial (S&S) · $1,431.00 proposed penalty
Mine ventilation plan; submission and approval.
Laurel Fork Mine · 460908430 CFR 75.370(a)(1) · $642.00 proposed penalty
Power wires and cables; insulation and protection.
Berwind Deep Mine · 460953330 CFR 75.517 · Significant and substantial (S&S) · $2,712.00 proposed penalty
Roof control plan.
Berwind Deep Mine · 460953330 CFR 75.220(a)(1) · $592.00 proposed penalty
Criteria—Self-propelled personnel carriers.
Berwind Deep Mine · 460953330 CFR 75.1403-6(b)(1) · $151.00 proposed penalty
Permanent splicing of trailing cables.
NO. 2 GAS · 460954130 CFR 75.604(b) · Significant and substantial (S&S) · $8,315.00 proposed penalty
Permissible electric face equipment; maintenance.
NO. 2 GAS · 460954130 CFR 75.503 · $267.00 proposed penalty
Mine ventilation plan; submission and approval.
NO. 2 GAS · 460954130 CFR 75.370(a)(1) · Significant and substantial (S&S) · $3,448.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Crucible Deep Mine · 460961430 CFR 75.512 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
Crucible Deep Mine · 460961430 CFR 75.503 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Crucible Deep Mine · 460961430 CFR 75.512 · $151.00 proposed penalty
Spot Inspections
Berwind Deep Mine · 4609533103(i) · 7.5 on-site hours reported
Maintenance of incombustible content of rock dust.
Berwind Deep Mine · 460953330 CFR 75.403 · $6,037.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Crucible Deep Mine · 460961430 CFR 75.512 · $151.00 proposed penalty
Regular Safety and Health Inspection
Ram Surface Mine No. 3 · 4609578127.3 on-site hours reported
Criteria—Haulage; general.
Stonecoal Branch Mine No. 2 · 460866330 CFR 75.1403-10(f)
Preshift examination at fixed intervals.
Stonecoal Branch Mine No. 2 · 460866330 CFR 75.360(f) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Laurel Fork Mine · 460908430 CFR 77.1605(a) · $1,126.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
NO. 2 GAS · 460954130 CFR 75.1107-4(a)(1) · $549.00 proposed penalty
Highwalls, pits and spoil banks; plans.
Ram Surface Mine No. 3 · 460957830 CFR 77.1000 · Significant and substantial (S&S) · $1,818.00 proposed penalty
Loading and haulage; general.
Ram Surface Mine No. 3 · 460957830 CFR 77.1600(b) · $151.00 proposed penalty
Loading and haulage equipment; installations.
Ram Surface Mine No. 3 · 460957830 CFR 77.1605(k) · $151.00 proposed penalty
Spot Inspections
Berwind Deep Mine · 4609533103(i) · 20.0 on-site hours reported
Mine ventilation plan; submission and approval.
Stonecoal Branch Mine No. 2 · 460866330 CFR 75.370(a)(1) · $432.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.