ALL STATUSES / OPERATOR PORTFOLIO

Prospect Mining & Development Co., LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0151473

MINE PORTFOLIO

3 of 3 mines and facilities

2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Carbon Hill Prep Plant0103426 · NonProducing6/8 quarters reportedWalker, ALFacility · MSHA: Coal (Bituminous)026,3940021.5
Corinth Prep Plant0103155 · Temporarily Idled6/8 quarters reportedWalker, ALFacility · MSHA: Coal (Bituminous)031,1983033.8
Maxine-Pratt Mine0103419 · Abandoned and Sealed5/8 quarters reportedJefferson, ALUnderground · MSHA: Coal (Bituminous)93,95576,905923543.5

LOCATION

Portfolio map

3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

95

18 significant & substantial (S&S)

  1. 2025 Q115
  2. 2025 Q222
  3. 2025 Q339
  4. 2025 Q418
  5. 2026 Q11
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

3

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q22
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

28,072.00

94 of 95 violations with amounts

  1. 2025 Q15,900
  2. 2025 Q25,190
  3. 2025 Q39,096
  4. 2025 Q47,735
  5. 2026 Q1151
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

598.75

24 inspections · 24 with hours

  1. 2025 Q1133.00
  2. 2025 Q2178.00
  3. 2025 Q3145.25
  4. 2025 Q4116.00
  5. 2026 Q120.00
  6. 2026 Q25.00
  7. 2026 Q3—
  8. 2026 Q4 *1.50
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q11555,900.00104133.0
2025-Q22265,190.00205178.0
2025-Q33939,096.00006145.3
2025-Q41847,735.00002116.0
2026-Q110151.0000220.0
2026-Q200—0035.0
2026-Q300—000—
2026-Q4 *00—0021.5

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation9824152
    Maxine-Pratt Mine · 0103419

    75.220(a)(1) · $151.00 proposed

  2. violation9824146
    Maxine-Pratt Mine · 0103419

    50.11(b) · $151.00 proposed

  3. violation9824145
    Maxine-Pratt Mine · 0103419

    75.380(d)(7)(i) · S&S · $336.00 proposed

  4. violation9824144
    Maxine-Pratt Mine · 0103419

    75.220(e) · $151.00 proposed

  5. violation9709140
    Maxine-Pratt Mine · 0103419

    75.1725(a) · S&S · $336.00 proposed

  6. violation9709139
    Maxine-Pratt Mine · 0103419

    75.503 · $151.00 proposed

  7. inspection6920858
    Maxine-Pratt Mine · 0103419

    Roof Control Technical Investigation · 16.5 on-site hours

  8. violation9820787
    Maxine-Pratt Mine · 0103419

    77.502 · $336.00 proposed

  9. accident220251530005
    Maxine-Pratt Mine · 0103419

    HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    Two employees were lifting a welding cart onto a ride when employee felt pain in back and left knee

  10. accident220251340014
    Maxine-Pratt Mine · 0103419

    FALL OF ROOF OR BACK · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was making first cut inby the intersection of #1 entry, oo3 mining section. Because of wet conditions EE was sitting on some loose material at the corner of #1 when a piece of rock measuring aprox. 30 inches by 30 inches by 2 inches thick fell from between the bolt and the rib striking the employee on the head.

  11. inspectionF01C2A9
    Carbon Hill Prep Plant · 0103426

    Regular Safety and Health Inspection · 13.5 on-site hours

  12. inspectionF01C2A2
    Corinth Prep Plant · 0103155

    Regular Safety and Health Inspection · 14.0 on-site hours

  13. violation9639485
    Corinth Prep Plant · 0103155

    77.402 · $151.00 proposed

  14. violation9709135
    Maxine-Pratt Mine · 0103419

    48.9(a) · $151.00 proposed

  15. violation9758123
    Maxine-Pratt Mine · 0103419

    77.502 · $151.00 proposed

  16. violation9758122
    Maxine-Pratt Mine · 0103419

    77.512 · $151.00 proposed

  17. inspectionF00F79D
    Maxine-Pratt Mine · 0103419

    Verbal Hazard Complaint Inspections · 4.5 on-site hours

  18. violation9758121
    Maxine-Pratt Mine · 0103419

    75.333(c) · $151.00 proposed

  19. violation9758120
    Maxine-Pratt Mine · 0103419

    75.503 · $151.00 proposed

  20. violation9758119
    Maxine-Pratt Mine · 0103419

    75.606 · S&S · $336.00 proposed

  21. violation9758118
    Maxine-Pratt Mine · 0103419

    75.1725(a) · $151.00 proposed

  22. violation9758117
    Maxine-Pratt Mine · 0103419

    Description not reported · S&S · $909.00 proposed

  23. violation9758116
    Maxine-Pratt Mine · 0103419

    75.503 · $151.00 proposed

  24. violation9758115
    Maxine-Pratt Mine · 0103419

    75.604(b) · S&S · $336.00 proposed

  25. violation9709134
    Maxine-Pratt Mine · 0103419

    75.333(e)(1)(ii) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this operator in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON205.24Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS107,592Allocated from published county sales
ESTIMATED COAL REVENUE · USD22,082,147Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Maxine-Pratt Mine0103419 · Jefferson, Alabama102,539205.24107,59222,082,147County allocation estimate1.22% of eligible county production4 eligible mines / 4 sales respondents
Corinth Prep Plant0103155 · Walker, Alabama0———Preparation plant3 eligible mines / 3 sales respondents
Carbon Hill Prep Plant0103426 · Walker, Alabama0———Preparation plant3 eligible mines / 3 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.