← Panther Creek Mining LLC

Panther Creek Mining LLC safety activity

MSHA violations, accident reports and inspections across the current mine portfolio.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5134403
    Speed Mine · 4605437

    30 CFR 75.1101-10 · $398.00 proposed penalty

  2. Accumulation of combustible materials.

    violationRecord 5134402
    Speed Mine · 4605437

    30 CFR 75.400 · $959.00 proposed penalty

  3. Methane monitors.

    violationRecord 5186380
    Maple Eagle East Deep Mine · 4609416

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  4. Drill dust control at underground areas of underground mines.

    violationRecord 5027667
    Speed Mine · 4605437

    30 CFR 72.630(a) · $288.00 proposed penalty

  5. Mine ventilation plan; submission and approval.

    violationRecord 5027666
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $549.00 proposed penalty

  6. Power wires and cables; insulation and protection.

    violationRecord 5027665
    Speed Mine · 4605437

    30 CFR 75.517 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  7. Spot Inspections

    inspectionRecord F00C772
    Speed Mine · 4605437

    103(i) · 5.0 on-site hours reported

  8. Rock dusting.

    violationRecord 5134401
    Speed Mine · 4605437

    30 CFR 75.402 · $432.00 proposed penalty

  9. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5021855
    Speed Mine · 4605437

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $5,144.00 proposed penalty

  10. Mine ventilation plan; submission and approval.

    violationRecord 5183761
    Maple Eagle No. 1 Mine · 4604236

    30 CFR 75.370(a)(1) · $1,431.00 proposed penalty

  11. Maintenance of belt conveyors and belt conveyor entries.

    violationRecord 5021854
    Speed Mine · 4605437

    30 CFR 75.1731(a) · Significant and substantial (S&S) · $13,436.00 proposed penalty

  12. Mine ventilation plan; submission and approval.

    violationRecord 5021853
    Speed Mine · 4605437

    30 CFR 75.370(a)(1) · $1,431.00 proposed penalty

  13. Permanent splicing of trailing cables.

    violationRecord 5186427
    Speed Mine · 4605437

    30 CFR 75.604(b) · $2,503.00 proposed penalty

  14. Spot Inspections

    inspectionRecord 6321170
    Speed Mine · 4605437

    103(i) · 4.0 on-site hours reported

  15. Methane monitors.

    violationRecord 5134400
    Speed Mine · 4605437

    30 CFR 75.342(a)(4) · $313.00 proposed penalty

  16. Mechanical equipment guards.

    violationRecord 5021852
    Speed Mine · 4605437

    30 CFR 75.1722(b) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  17. Escapeways; bituminous and lignite mines.

    violationRecord 5021851
    Speed Mine · 4605437

    30 CFR 75.380(d)(7)(iii) · Significant and substantial (S&S) · $25,484.00 proposed penalty

  18. Accumulation of combustible materials.

    violationRecord 5021850
    Speed Mine · 4605437

    30 CFR 75.400 · $959.00 proposed penalty

  19. Handling of materials

    accidentRecord 220262260004
    Maple Eagle No. 1 Mine · 4604236

    Days away from work only

    Accident narrative

    EE was struck in the back by a falling timber, then fell forward into a scoop bucket. EE's face struck the scoop bucket. EE is off work awaiting an appointment with a specialist for a fracture in EE's lumbar spine.

  20. Accumulation of combustible materials.

    violationRecord 5027661
    Speed Mine · 4605437

    30 CFR 75.400 · $504.00 proposed penalty

  21. First-aid equipment; location; minimum requirements.

    violationRecord 5027660
    Speed Mine · 4605437

    30 CFR 75.1713-7(c) · Significant and substantial (S&S) · $3,448.00 proposed penalty

  22. Escapeways; bituminous and lignite mines.

    violationRecord 5027659
    Speed Mine · 4605437

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $2,936.00 proposed penalty

  23. Escapeways; bituminous and lignite mines.

    violationRecord 5027658
    Speed Mine · 4605437

    30 CFR 75.380(d)(7)(vii) · $592.00 proposed penalty

  24. Electric equipment; examination, testing and maintenance.

    violationRecord 5021849
    Speed Mine · 4605437

    30 CFR 75.512 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  25. Roof control plan.

    violationRecord 5020480
    Speed Mine · 4605437

    30 CFR 75.220(a)(1) · $883.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.