ACTIVE / OPERATOR PORTFOLIO

Panther Creek Mining LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0141673

MINE PORTFOLIO

10 of 10 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
Coal Clean Prep Plant4608571 · Active6/8 quarters reportedKanawha, WVFacility · MSHA: Coal (Bituminous)0138,059681343.3
Maple Eagle East Deep Mine4609416 · Active2/8 quarters reportedFayette, WVUnderground · MSHA: Coal (Bituminous)14,3528,651400165.3
Maple Eagle No. 1 Mine4604236 · Active6/8 quarters reportedFayette, WVUnderground · MSHA: Coal (Bituminous)574,380384,812691123,246.8
Maple Eagle Preparation Plant4605145 · Active6/8 quarters reportedFayette, WVFacility · MSHA: Coal (Bituminous)0100,717390226.0
Samples Mine Highwall Miner4609153 · Active6/8 quarters reportedKanawha, WVSurface · MSHA: Coal (Bituminous)40,46138,4743169.8
Samples Surface Mine4607178 · Active6/8 quarters reportedKanawha, WVSurface · MSHA: Coal (Bituminous)1,009,720407,562785814.5
Speed Mine4605437 · Active6/8 quarters reportedKanawha, WVUnderground · MSHA: Coal (Bituminous)740,923432,63351983,977.0
Sycamore Surface Mine4607058 · Active6/8 quarters reportedFayette, WVSurface · MSHA: Coal (Bituminous)177,583129,321231288.0
Toms Fork Prep Plant and Loadout4608465 · Active6/8 quarters reportedKanawha, WVFacility · MSHA: Coal (Bituminous)039,467690292.0
Winchester 24609615 · Active6/8 quarters reportedKanawha, WVUnderground · MSHA: Coal (Bituminous)481,891200,93311711,273.3

LOCATION

Portfolio map

10 of 10 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

1,647

249 significant & substantial (S&S)

  1. 2025 Q1236
  2. 2025 Q2197
  3. 2025 Q3285
  4. 2025 Q4152
  5. 2026 Q1248
  6. 2026 Q2288
  7. 2026 Q3214
  8. 2026 Q4 *27

Accident records

29

0 records classified as fatality

  1. 2025 Q15
  2. 2025 Q25
  3. 2025 Q34
  4. 2025 Q45
  5. 2026 Q12
  6. 2026 Q24
  7. 2026 Q34
  8. 2026 Q4 *0

Proposed penalties · USD

1,965,711.00

1,521 of 1,647 violations with amounts

  1. 2025 Q1180,611
  2. 2025 Q2179,014
  3. 2025 Q3355,903
  4. 2025 Q4152,261
  5. 2026 Q1295,111
  6. 2026 Q2541,845
  7. 2026 Q3260,966
  8. 2026 Q4 *—

On-site inspection hours

10,695.75

262 inspections · 262 with hours

  1. 2025 Q11,344.25
  2. 2025 Q21,540.00
  3. 2025 Q31,692.00
  4. 2025 Q41,529.25
  5. 2026 Q11,470.25
  6. 2026 Q21,660.50
  7. 2026 Q31,378.75
  8. 2026 Q4 *80.75
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q123633180,611.0050221,344.3
2025-Q219721179,014.0050351,540.0
2025-Q328528355,903.0040471,692.0
2025-Q415215152,261.0050381,529.3
2026-Q124848295,111.0020461,470.3
2026-Q228855541,845.0040391,660.5
2026-Q321447260,966.0040301,378.8
2026-Q4 *272—00580.8

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5026774
    Samples Surface Mine · 4607178

    77.1606(c)

  2. violation5029885
    Maple Eagle East Deep Mine · 4609416

    75.202(a) · S&S

  3. violation5029884
    Maple Eagle East Deep Mine · 4609416

    75.370(a)(1)

  4. violation9847613
    Speed Mine · 4605437

    75.370(a)(1)

  5. violation5090074
    Speed Mine · 4605437

    75.512

  6. violation5026773
    Samples Surface Mine · 4607178

    77.1606(c)

  7. violation5026772
    Samples Surface Mine · 4607178

    77.1606(c)

  8. violation5186390
    Maple Eagle No. 1 Mine · 4604236

    75.517

  9. violation5186389
    Maple Eagle No. 1 Mine · 4604236

    75.400

  10. violation5186388
    Maple Eagle No. 1 Mine · 4604236

    75.503

  11. violation5184055
    Winchester 2 · 4609615

    75.220(a)(1)

  12. violation5184054
    Winchester 2 · 4609615

    75.370(a)(1)

  13. violation5090073
    Speed Mine · 4605437

    75.1202-1(a)

  14. violation5090072
    Speed Mine · 4605437

    75.1100-2(e)

  15. violation5090071
    Speed Mine · 4605437

    75.360(f)

  16. violation5023603
    Speed Mine · 4605437

    75.503

  17. violation5023602
    Speed Mine · 4605437

    75.1100-3

  18. violation5029883
    Maple Eagle East Deep Mine · 4609416

    75.211(d)

  19. violation5029882
    Maple Eagle East Deep Mine · 4609416

    75.400

  20. violation5029881
    Maple Eagle East Deep Mine · 4609416

    75.400

  21. inspectionF014297
    Maple Eagle No. 1 Mine · 4604236

    Regular Safety and Health Inspection · 26.5 on-site hours

  22. inspectionF00EA07
    Speed Mine · 4605437

    Regular Safety and Health Inspection · 29.5 on-site hours

  23. inspectionF015C7F
    Samples Surface Mine · 4607178

    Regular Safety and Health Inspection · 7.0 on-site hours

  24. inspectionF00CD0A
    Maple Eagle East Deep Mine · 4609416

    Regular Safety and Health Inspection · 17.8 on-site hours

  25. inspectionF0058C0
    Winchester 2 · 4609615

    Regular Safety and Health Inspection · 0.0 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS405,00623 rows · 5 receiving plants
HEAT CONTENT · BTU/LB12,537Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.96 / 10.78Separate averages over measured receipts
DELIVERED COST · USD/TON124.80100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *111,81512,6801.0511.07119.40
2025-Q4143,04112,5260.9710.28123.16
2026-Q160,91612,3650.8911.07128.72
2026-Q264,39312,4410.8411.40131.53
2026-Q3 *24,84112,6200.9010.10131.49
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 11860 · preliminaryTOMS FORK LOADOUT4608465Wateree3297 · SC · BLACKHAWK MINING LLC12,532129.5112,6600.899.80ContractBITRail
2026-07EIA row 11867 · preliminaryTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC12,309133.5012,5800.9110.40ContractBITRail
2026-06EIA row 9964 · preliminaryTOMS FORK LOADOUT4608465Wateree3297 · SC · BLACKHAWK MINING LLC12,985130.0612,2100.8312.60ContractBITRail
2026-06EIA row 9973 · preliminaryTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC25,717132.6612,8950.849.60ContractBITRail
2026-05EIA row 8123 · preliminaryTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC12,945131.5111,9450.8113.30ContractBITRail
2026-04EIA row 6308 · preliminaryTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC12,746130.7412,2650.9011.90ContractBITRail
2026-03EIA row 4498 · preliminaryTOMS FORK LOADOUT4608465Wateree3297 · SC · BLACKHAWK MINING LLC12,908126.1612,2600.8211.80ContractBITRail
2026-03EIA row 4502 · preliminaryTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC12,549129.8112,3300.9110.90ContractBITRail
2026-02EIA row 2542 · preliminaryTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC10,370131.8112,5200.9010.20ContractBITRail
2026-01EIA row 552 · preliminaryTOMS FORK LOADOUT4608465Wateree3297 · SC · BLACKHAWK COAL SALES, LLC13,401126.7512,3150.9211.70ContractBITRail
2026-01EIA row 566 · preliminaryTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC11,688129.9012,4400.8810.50ContractBITRail
2025-12EIA row 34497 · finalTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC50,176129.4012,4950.869.80ContractBITRail
2025-11EIA row 31507 · finalTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC25,628128.6312,1900.8911.50ContractBITRail
2025-11EIA row 31775 · finalSAMPLES MINE4607178H L Spurlock6041 · KY · RAW MATERIALS RECYCLING, INC.4,72861.2812,9453.478.00SpotBITRiver
2025-10EIA row 28558 · finalTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC60,926122.1212,6500.8710.40ContractBITRail
2025-10EIA row 28831 · finalSAMPLES MINE4607178H L Spurlock6041 · KY · RAW MATERIALS RECYCLING, INC.1,58361.1912,9202.497.70SpotBITRiver
2025-09EIA row 25485 · finalTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC37,150123.8212,6400.8810.70ContractBITRail
2025-09EIA row 25759 · finalSAMPLES MINE4607178H L Spurlock6041 · KY · BLACKHAWK COAL SALES, LLC4,91461.8612,6602.6212.90SpotBITRiver
2025-09EIA row 25991 · finalTOMS FORK LOADOUT4608465Cope7210 · SC · BLACKHAWK MINING LLC11,497129.4712,9500.939.80ContractBITRail
2025-08EIA row 22167 · finalTOMS FORK LOADOUT4608465James E. Rogers Energy Complex2721 · NC · BLACKHAWK COAL SALES, LLC13,365118.7712,8650.7410.00ContractBITRail
2025-08EIA row 22319 · finalTOMS FORK LOADOUT4608465Wateree3297 · SC · BLACKHAWK MINING LLC12,961129.3612,7800.8212.90ContractBITRail
2025-08EIA row 22328 · finalTOMS FORK LOADOUT4608465Williams3298 · SC · BLACKHAWK MINING LLC25,596129.4512,5750.8511.00ContractBITRail
2025-08EIA row 22623 · finalSAMPLES MINE4607178H L Spurlock6041 · KY · BLACKHAWK COAL SALES, LLC6,33260.1012,2652.9513.00SpotBITRiver
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON108.30Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS2,218,960Allocated from published county sales
ESTIMATED COAL REVENUE · USD240,306,797Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED98.6%5 of 6 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Samples Surface Mine4607178 · Kanawha, West Virginia743,56999.79761,35675,975,755County allocation estimate25.57% of eligible county production5 eligible mines / 5 sales respondents
Speed Mine4605437 · Kanawha, West Virginia572,37399.79586,06558,483,437County allocation estimate19.69% of eligible county production5 eligible mines / 5 sales respondents
Maple Eagle No. 1 Mine4604236 · Fayette, West Virginia400,254129.97399,27051,893,062County allocation estimate13.78% of eligible county production9 eligible mines / 9 sales respondents
Sycamore Surface Mine4607058 · Fayette, West Virginia226,761129.97226,20329,399,638County allocation estimate7.81% of eligible county production9 eligible mines / 9 sales respondents
Winchester 24609615 · Kanawha, West Virginia240,31799.79246,06624,554,904County allocation estimate8.27% of eligible county production5 eligible mines / 5 sales respondents
Maple Eagle Preparation Plant4605145 · Fayette, West Virginia0129.97——Preparation plant9 eligible mines / 9 sales respondents
Toms Fork Prep Plant And Loado4608465 · Kanawha, West Virginia099.79——Preparation plant5 eligible mines / 5 sales respondents
Coal Clean Prep Plant4608571 · Kanawha, West Virginia099.79——Preparation plant5 eligible mines / 5 sales respondents
Samples Mine Highwall Miner4609153 · Kanawha, West Virginia31,79899.79——Below EIA sales-reporting threshold5 eligible mines / 5 sales respondents
Maple Eagle East Deep Mine4609416 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.