Panther Creek Mining LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Permanent splicing of trailing cables.
Maple Eagle No. 1 Mine · 460423630 CFR 75.604(b) · $432.00 proposed penalty
Spot Inspections
Speed Mine · 4605437103(i) · 6.0 on-site hours reported
Maintenance of incombustible content of rock dust.
Maple Eagle No. 1 Mine · 460423630 CFR 75.403 · $336.00 proposed penalty
Maintenance of incombustible content of rock dust.
Maple Eagle No. 1 Mine · 460423630 CFR 75.403 · $336.00 proposed penalty
Maintenance of incombustible content of rock dust.
Maple Eagle No. 1 Mine · 460423630 CFR 75.403 · $336.00 proposed penalty
Maintenance of incombustible content of rock dust.
Maple Eagle No. 1 Mine · 460423630 CFR 75.403 · $336.00 proposed penalty
Permissible exposure level.
Speed Mine · 460543730 CFR 62.130(b) · $366.00 proposed penalty
Permissible exposure level.
Speed Mine · 460543730 CFR 62.130(b) · $366.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1731(b) · $151.00 proposed penalty
Ventilation controls.
Maple Eagle No. 1 Mine · 460423630 CFR 75.333(h) · $151.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $209.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · $151.00 proposed penalty
Inspection of fire suppression devices.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1107-16(b) · $226.00 proposed penalty
Dry chemical devices; capacity; minimum requirements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1107-9(a)(1) · $151.00 proposed penalty
High-voltage equipment; grounding.
Maple Eagle No. 1 Mine · 460423630 CFR 77.810 · $336.00 proposed penalty
Methane monitors.
Maple Eagle No. 1 Mine · 460423630 CFR 75.342(a)(4) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $432.00 proposed penalty
Emergency tethers.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1714-6 · $336.00 proposed penalty
Permissible exposure level.
Speed Mine · 460543730 CFR 62.130(b) · $366.00 proposed penalty
Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · $1,818.00 proposed penalty
Protection from falls of roof, face and ribs.
Speed Mine · 460543730 CFR 75.202(b) · Significant and substantial (S&S) · $4,047.00 proposed penalty
Methane monitors.
Speed Mine · 460543730 CFR 75.342(a)(4) · $209.00 proposed penalty
Temporary notations, revisions, and supplements.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1202-1(b)(3) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1731(a) · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
Maple Eagle No. 1 Mine · 460423630 CFR 75.380(d)(1) · $4,383.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.