Panther Creek Mining LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
On-shift examination.
Maple Eagle No. 1 Mine · 460423630 CFR 75.362(a)(2) · $151.00 proposed penalty
Machinery and equipment; operation and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1725(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Roof control plan.
Maple Eagle No. 1 Mine · 460423630 CFR 75.220(a)(1) · $366.00 proposed penalty
Permanent splicing of trailing cables.
Winchester 2 · 460961530 CFR 75.604(b) · Significant and substantial (S&S) · $1,968.00 proposed penalty
Maintenance of incombustible content of rock dust.
Winchester 2 · 460961530 CFR 75.403 · $288.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(a) · Significant and substantial (S&S) · $1,037.00 proposed penalty
Power wires; support.
Coal Clean Prep Plant · 460857130 CFR 75.516 · $151.00 proposed penalty
Requirement for container labels.
Coal Clean Prep Plant · 460857130 CFR 47.41(a) · $151.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(a) · Significant and substantial (S&S) · $313.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(a)
Verbal Hazard Complaint Inspections
Maple Eagle No. 1 Mine · 460423617.5 on-site hours reported
Spot Inspections
Speed Mine · 4605437103(i) · 5.0 on-site hours reported
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $504.00 proposed penalty
Power wires and cables; insulation and protection.
Speed Mine · 460543730 CFR 75.517 · Significant and substantial (S&S) · $4,749.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $504.00 proposed penalty
Maintenance of incombustible content of rock dust.
Maple Eagle No. 1 Mine · 460423630 CFR 75.403 · $592.00 proposed penalty
Maintenance of incombustible content of rock dust.
Maple Eagle No. 1 Mine · 460423630 CFR 75.403 · $592.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $883.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $883.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(a) · Significant and substantial (S&S) · $697.00 proposed penalty
Electric wiring and equipment; installation and maintenance.
Coal Clean Prep Plant · 460857130 CFR 77.516 · $151.00 proposed penalty
Accumulations of combustible materials.
Coal Clean Prep Plant · 460857130 CFR 77.1104 · $151.00 proposed penalty
Surface installations; general.
Coal Clean Prep Plant · 460857130 CFR 77.200 · $209.00 proposed penalty
Travelways at surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.205(b) · Significant and substantial (S&S) · $313.00 proposed penalty
Dust accumulations in surface installations.
Coal Clean Prep Plant · 460857130 CFR 77.202 · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.