Panther Creek Mining LLC safety activity
MSHA violations, accident reports and inspections across the current mine portfolio.
Safety activity
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $1,679.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $818.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $1,431.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(2) · $245.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $5,574.00 proposed penalty
Accumulation of combustible materials.
Maple Eagle No. 1 Mine · 460423630 CFR 75.400 · $755.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · Significant and substantial (S&S) · $7,084.00 proposed penalty
Condition and examination of firefighting equipment.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1100-3 · $245.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $642.00 proposed penalty
Protection from falls of roof, face and ribs.
Maple Eagle No. 1 Mine · 460423630 CFR 75.202(a) · $1,037.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $1,431.00 proposed penalty
Other safeguards.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1403 · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $818.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $1,968.00 proposed penalty
Mine ventilation plan; submission and approval.
Maple Eagle No. 1 Mine · 460423630 CFR 75.370(a)(1) · $1,818.00 proposed penalty
Machinery and equipment; operation and maintenance.
Speed Mine · 460543730 CFR 75.1725(a) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Roof testing and scaling.
Speed Mine · 460543730 CFR 75.211(d) · $398.00 proposed penalty
Roof bolting.
Speed Mine · 460543730 CFR 75.204(c)(1) · $592.00 proposed penalty
Permanent splicing of trailing cables.
Speed Mine · 460543730 CFR 75.604(b) · Significant and substantial (S&S) · $12,403.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $959.00 proposed penalty
Transportation of liquefied and nonliquefied compressed gas cylinders; requirements.
Speed Mine · 460543730 CFR 75.1106-2(a)(3) · $398.00 proposed penalty
Ground control; inspection and maintenance; general.
Samples Surface Mine · 460717830 CFR 77.1004(b) · $165.00 proposed penalty
Spot Inspection
Coal Clean Prep Plant · 46085712.0 on-site hours reported
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $1,219.00 proposed penalty
Quarterly sampling; mechanized mining units.
Maple Eagle No. 1 Mine · 460423630 CFR 70.208(a)(2) · $1,219.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.