Roof bolting.
Speed Mine · 460543730 CFR 75.204(c)(1) · $465.00 proposed penalty
Permissible electric face equipment; maintenance.
Speed Mine · 460543730 CFR 75.503 · $2,712.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
Speed Mine · 460543730 CFR 75.1107-7(b) · $432.00 proposed penalty
Water spray devices; capacity; water supply; minimum requirements.
Speed Mine · 460543730 CFR 75.1107-7(b) · $432.00 proposed penalty
Fire-resistant hydraulic fluids and fire suppression devices on underground equipment.
Speed Mine · 460543730 CFR 75.1107-1(a)(3)(ii) · $398.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Speed Mine · 460543730 CFR 75.512 · $642.00 proposed penalty
Daily examination of hoisting equipment.
Speed Mine · 460543730 CFR 75.1400-3(b)(3) · $1,320.00 proposed penalty
Examinations.
Speed Mine · 460543730 CFR 75.1433(c) · $398.00 proposed penalty
Permanent splicing of trailing cables.
Speed Mine · 460543730 CFR 75.604(b) · Significant and substantial (S&S) · $12,403.00 proposed penalty
Power wires and cables; insulation and protection.
Speed Mine · 460543730 CFR 75.517 · Significant and substantial (S&S) · $10,569.00 proposed penalty
Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · $2,712.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $959.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Speed Mine · 460543730 CFR 75.512 · Significant and substantial (S&S) · $4,749.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $959.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · Significant and substantial (S&S) · $6,037.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
Winchester 2 · 460961530 CFR 75.1731(b) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
Winchester 2 · 460961530 CFR 75.202(a) · Significant and substantial (S&S) · $313.00 proposed penalty
Electric equipment; examination, testing and maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.512 · $504.00 proposed penalty
Permissible electric face equipment; maintenance.
Maple Eagle No. 1 Mine · 460423630 CFR 75.503 · $1,037.00 proposed penalty
Quantity and location of firefighting equipment.
Maple Eagle No. 1 Mine · 460423630 CFR 75.1100-2(f) · $336.00 proposed penalty
Quarterly sampling; mechanized mining units.
Speed Mine · 460543730 CFR 70.208(a)(2) · $642.00 proposed penalty
Roof control plan.
Speed Mine · 460543730 CFR 75.220(a)(1) · Significant and substantial (S&S) · $5,574.00 proposed penalty
Accumulation of combustible materials.
Speed Mine · 460543730 CFR 75.400 · $959.00 proposed penalty
Mine ventilation plan; submission and approval.
Speed Mine · 460543730 CFR 75.370(a)(1) · $2,936.00 proposed penalty
Mobile equipment; automatic warning devices.
Toms Fork Prep Plant and Loadout · 460846530 CFR 77.410(c) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Status is from the current MSHA Mines snapshot, not the selected reporting period. Closed records can retain their last reported controller/operator.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.