Coal production
10,664,512reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Marion County Mine4601433 · Active6/8 quarters reported | Marion, WVUnderground · MSHA: Coal (Bituminous) | 10,664,512 | 1,926,403 | 968 | 148 | 6,615.8 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 1 mines listed under this operator were checked; 1 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 2,107,006 | 316,474 | 6.66 | 532 | 1/1 mines reporting |
| 2025 Q2 | 1,387,212 | 316,551 | 4.38 | 533 | 1/1 mines reporting |
| 2025 Q3 | 1,825,651 | 327,078 | 5.58 | 527 | 1/1 mines reporting |
| 2025 Q4 | 1,751,590 | 316,954 | 5.53 | 530 | 1/1 mines reporting |
| 2026 Q1 | 1,952,672 | 316,662 | 6.17 | 523 | 1/1 mines reporting |
| 2026 Q2 | 1,640,381 | 332,684 | 4.93 | 531 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
172 significant & substantial (S&S)
0 records classified as fatality
883 of 968 violations with amounts
268 inspections · 268 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 82 | 10 | 45,662.00 | 8 | 0 | 32 | 838.0 |
| 2025-Q2 | 117 | 8 | 70,934.00 | 18 | 0 | 33 | 952.5 |
| 2025-Q3 | 194 | 37 | 183,646.00 | 33 | 0 | 45 | 1,063.3 |
| 2025-Q4 | 127 | 20 | 89,798.00 | 21 | 0 | 32 | 884.0 |
| 2026-Q1 | 103 | 22 | 88,610.00 | 18 | 0 | 32 | 917.0 |
| 2026-Q2 | 123 | 27 | 224,139.00 | 13 | 0 | 30 | 862.8 |
| 2026-Q3 | 206 | 47 | 157,593.00 | 37 | 0 | 56 | 1,021.0 |
| 2026-Q4 * | 16 | 1 | — | 0 | 0 | 8 | 77.3 |
All violations issued in the selected period. Counts combine subsections.
75.1731(a) · $165.00 proposed
77.404(a) · $151.00 proposed
77.202 · $245.00 proposed
77.205(b) · $245.00 proposed
77.205(b) · $245.00 proposed
77.205(b) · $245.00 proposed
103 (g) Written Notification Hazard Complaint Inspectio · 7.0 on-site hours
FALL OF ROOF OR BACK · ACCIDENT ONLY
Unplanned roof fall discovered reportable in the old 11 belt entry, which is now common with 9 South track, at 82 1/2 block. Fall was approx. 10' high, 16' wide and 30' long. The fall will not be cleaned up or re-supported. No problems with equipment or compliance issues, training or PPE.
STRIKING OR BUMPING · DAYS AWAY FROM WORK ONLY
Injured stopped EE's motor outby the 9 North 27 block switch underneath a 6" aqualine (water discharge line). When EE stood up, EE struck EE's head on the airline causing pain in EE's lower neck (previously injured 4/28/25). No problems with equipment or compliance issues, training or PPE.
DISORDERS (REPEATED TRAUMA) · OCCUPATNAL ILLNESS NOT DEG 1-6
The mine received a Self-Insured Employer Decision on 3/5/26 from a medical report dated 10/17/25. The report identifies a 12.55% permanent partial disability (hearing loss) possibly from occupational noise exposure. Employee has been retired since 4/16/25.
103(i) Spot Inspections · 4.0 on-site hours
77.1301(c)(11) · $151.00 proposed
75.1903(a)(5) · $151.00 proposed
75.1403-10(e) · $151.00 proposed
SLIP OR FALL OF PERSON · DAYS AWAY FROM WORK ONLY
Injured was attempting to dismount Volvo rock truck with wet muddy boots and EE's foot slipped while climbing down steps causing an unexpected load on EE's left shoulder resulting in a sprain/strain type injury. Injured started missing work on 3/13/26 and was put off work pending an MRI. No problems with equipment or compliance issues, training or PPE.
72.701 · $267.00 proposed
75.517 · S&S · $2,312.00 proposed
75.202(a) · $313.00 proposed
75.370(a)(1) · $313.00 proposed
103(i) Spot Inspections · 7.0 on-site hours
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Injured loading top belt structure into a belt tub in the Sugar Run Supply yard with the rest of belt crew. When EE placed the structure down the other employee pushed it over before injured's gloved finger was out of way and pinched it between structure and tub resulting in a chipped bone. No problems with equipment or compliance issues, training or PPE.
MACHINERY · NO DYS AWY FRM WRK,NO RSTR ACT
Injured holding up airline and cables at 97 blk 5 belt while another employee was using grinder to cut of belt structure nuts when the grinder caught and kicked striking EE's left index finger and causing a laceration that required 5 sutures. No problems with equipment or compliance issues, training or PPE.
75.1600-2(e) · $313.00 proposed
75.400 · $1,550.00 proposed
75.1731(a) · $209.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 493,674 | 13,197 | 3.18 | 7.83 | 71.53 | |
| 2025-Q4 | 448,205 | 13,285 | 2.72 | 7.97 | 76.38 | |
| 2026-Q1 | 526,077 | 13,192 | 2.60 | 8.06 | 77.70 | |
| 2026-Q2 | 685,369 | 13,109 | 3.02 | 8.10 | 79.72 | |
| 2026-Q3 * | 114,305 | 13,133 | 3.27 | 7.98 | 89.57 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 11412 · preliminary | LOVERIDGE #224601433 | Brandon Shores602 · MD · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 52,786 | —Not published | 13,135 | 3.17 | 7.90 | ContractBIT | Rail |
| 2026-07EIA row 11724 · preliminary | LOVERIDGE #224601433 | Roxboro2712 · NC · ACNR COAL SALES, Inc. | 12,444 | 98.75 | 13,195 | 3.32 | 8.00 | ContractBIT | Rail |
| 2026-07EIA row 11925 · preliminary | LOVERIDGE #224601433 | John E Amos3935 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 15,313 | 74.66 | 12,975 | 3.80 | 8.76 | ContractBIT | Rail |
| 2026-07EIA row 12192 · preliminary | LOVERIDGE #224601433 | Mayo6250 · NC · ACNR INC | 12,449 | 98.73 | 13,429 | 2.73 | 7.80 | ContractBIT | Rail |
| 2026-07EIA row 13112 · preliminary | LOVERIDGE #224601433 | Longview Power Plant56671 · WV · ACNR COAL SALES, Inc. | 21,313 | —Not published | 13,035 | 3.44 | 7.70 | ContractBIT | River / Truck |
| 2026-06EIA row 9515 · preliminary | LOVERIDGE #224601433 | Brandon Shores602 · MD · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 76,664 | —Not published | 13,175 | 3.40 | 8.20 | ContractBIT | Rail |
| 2026-06EIA row 9833 · preliminary | LOVERIDGE #224601433 | Roxboro2712 · NC · ACNR COAL SALES, Inc. | 12,445 | 100.62 | 13,163 | 3.41 | 8.60 | ContractBIT | Rail |
| 2026-06EIA row 10029 · preliminary | LOVERIDGE #224601433 | John E Amos3935 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 15,142 | 77.82 | 13,270 | 3.62 | 7.96 | ContractBIT | Rail |
| 2026-06EIA row 10285 · preliminary | LOVERIDGE #224601433 | Mayo6250 · NC · ACNR INC | 12,445 | 93.64 | 13,063 | 3.35 | 8.60 | ContractBIT | Rail |
| 2026-06EIA row 11159 · preliminary | LOVERIDGE #224601433 | Longview Power Plant56671 · WV · ACNR COAL SALES, Inc. | 77,408 | —Not published | 13,005 | 3.42 | 8.00 | ContractBIT | River / Truck |
| 2026-05EIA row 7711 · preliminary | LOVERIDGE #224601433 | Brandon Shores602 · MD · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 70,625 | —Not published | 13,070 | 3.14 | 9.10 | ContractBIT | Rail |
| 2026-05EIA row 7916 · preliminary | LOVERIDGE #224601433 | Monroe (MI)1733 · MI · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 15,706 | 71.72 | 13,276 | 2.71 | 8.60 | ContractBIT | Rail |
| 2026-05EIA row 7924 · preliminary | LOVERIDGE #224601433 | Monroe (MI)1733 · MI · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 15,253 | 81.19 | 13,190 | 2.54 | 7.60 | ContractBIT | Rail / Great Lakes |
| 2026-05EIA row 7925 · preliminary | LOVERIDGE #224601433 | Monroe (MI)1733 · MI · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 10,733 | 72.53 | 13,102 | 2.95 | 7.60 | ContractBIT | Rail / Great Lakes |
| 2026-05EIA row 8189 · preliminary | LOVERIDGE #224601433 | John E Amos3935 · WV · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 15,352 | 80.51 | 13,070 | 3.22 | 8.18 | ContractBIT | Rail |
| 2026-05EIA row 8421 · preliminary | LOVERIDGE #224601433 | Mayo6250 · NC · ACNR COAL SALES, Inc. | 12,445 | 93.63 | 13,364 | 2.62 | 8.40 | ContractBIT | Rail |
| 2026-05EIA row 9250 · preliminary | LOVERIDGE #224601433 | Longview Power Plant56671 · WV · ACNR COAL SALES, Inc. | 52,265 | —Not published | 12,930 | 3.27 | 8.60 | ContractBIT | River / Truck |
| 2026-04EIA row 5898 · preliminary | LOVERIDGE #224601433 | Brandon Shores602 · MD · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 76,933 | —Not published | 13,170 | 2.77 | 7.80 | ContractBIT | Rail |
| 2026-04EIA row 6086 · preliminary | LOVERIDGE #224601433 | Monroe (MI)1733 · MI · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 31,320 | 69.89 | 13,147 | 2.81 | 7.90 | ContractBIT | Rail |
| 2026-04EIA row 6087 · preliminary | LOVERIDGE #224601433 | Monroe (MI)1733 · MI · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 31,316 | 61.84 | 13,118 | 2.72 | 7.90 | ContractBIT | Rail |
| 2026-04EIA row 6096 · preliminary | LOVERIDGE #224601433 | Monroe (MI)1733 · MI · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 4,459 | 71.35 | 13,102 | 2.95 | 7.60 | ContractBIT | Rail / Great Lakes |
| 2026-04EIA row 6170 · preliminary | LOVERIDGE #224601433 | Roxboro2712 · NC · ACNR COAL SALES, Inc. | 37,333 | 88.96 | 13,156 | 2.75 | 7.90 | ContractBIT | Rail |
| 2026-04EIA row 6197 · preliminary | LOVERIDGE #224601433 | Marshall (NC)2727 · NC · ACNR COAL SALES, Inc. | 12,416 | 91.91 | 13,271 | 2.63 | 7.80 | ContractBIT | Rail |
| 2026-04EIA row 6275 · preliminary | LOVERIDGE #224601433 | Brunner Island3140 · PA · AMERICAN CONSOLIDATED NATURAL RESOURCES COAL SALES | 15,806 | —Not published | 13,285 | 2.81 | 7.30 | ContractBIT | Rail |
| 2026-04EIA row 7460 · preliminary | LOVERIDGE #224601433 | Longview Power Plant56671 · WV · ACNR COAL SALES, Inc. | 89,303 | —Not published | 13,035 | 2.70 | 7.60 | ContractBIT | River / Truck |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Marion County Mine4601433 · Marion, West Virginia | 5,645,400 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.