Coal production
8,342,126reported short tons
ALL STATUSES / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Gibson South1202388 · Active6/8 quarters reported | Gibson, INUnderground · MSHA: Coal (Bituminous) | 8,342,126 | 1,376,266 | 181 | 37 | 4,947.5 |
| Gibson Mine1202215 · Abandoned and Sealed | Gibson, INFacility · MSHA: Coal (Bituminous) | — | — | 0 | 0 | — |
| Gibson North Processing1202494 · NonProducing6/8 quarters reported | Gibson, INSurface · MSHA: Coal (Bituminous) | 0 | 7,375 | 2 | 0 | 74.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 3 mines listed under this operator were checked; 2 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 1,410,951 | 240,693 | 5.86 | 361 | 2/2 mines reporting |
| 2025 Q2 | 1,303,932 | 229,619 | 5.68 | 360 | 2/2 mines reporting |
| 2025 Q3 | 1,471,575 | 236,995 | 6.21 | 357 | 2/2 mines reporting |
| 2025 Q4 | 1,301,618 | 218,279 | 5.96 | 365 | 2/2 mines reporting |
| 2026 Q1 | 1,541,872 | 233,623 | 6.60 | 367 | 2/2 mines reporting |
| 2026 Q2 | 1,312,178 | 224,432 | 5.85 | 367 | 2/2 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
49 significant & substantial (S&S)
0 records classified as fatality
167 of 183 violations with amounts
163 inspections · 163 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 13 | 1 | 2,656.00 | 3 | 0 | 21 | 760.5 |
| 2025-Q2 | 28 | 6 | 11,891.00 | 5 | 0 | 22 | 709.8 |
| 2025-Q3 | 25 | 7 | 11,743.00 | 8 | 0 | 22 | 820.8 |
| 2025-Q4 | 25 | 8 | 14,457.00 | 1 | 0 | 23 | 681.8 |
| 2026-Q1 | 27 | 7 | 9,993.00 | 4 | 0 | 21 | 664.8 |
| 2026-Q2 | 29 | 8 | 8,473.00 | 8 | 0 | 26 | 737.5 |
| 2026-Q3 | 32 | 10 | 9,275.00 | 7 | 0 | 23 | 571.3 |
| 2026-Q4 * | 4 | 2 | — | 1 | 0 | 5 | 75.8 |
All violations issued in the selected period. Counts combine subsections.
103(i) Spot Inspections · 6.0 on-site hours
103(i) Spot Inspections · 6.0 on-site hours
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Employee was hanging miner cable during a unit power move and felt something "pop" in EE's right elbow. EE continued working until 06/18/2026 when EE was seen at OA and was taken off work for a potential tear.
FALL OF ROOF OR BACK · ACCIDENT ONLY
An unplanned roof fall occurred on the 1st Southeast Main, crosscut 29, entry 7. The fall measured approximately 37 feet in length, 17 feet wide, and 12' height. The fall occurred in the travelway outby of Unit #1.
Non-Injury Accident Investigation · 6.5 on-site hours
Roof Control Technical Investigation · 71.0 on-site hours
Description not reported
75.400 · $151.00 proposed
103(i) Spot Inspections · 3.0 on-site hours
75.517 · $267.00 proposed
103(i) Spot Inspections · 6.3 on-site hours
75.342(a)(4) · $151.00 proposed
STEPPING OR KNEELING ON OBJECT · DAYS AWAY FROM WORK ONLY
Employee was getting out of the mini-trac when EE stepped awkwardly on a loose piece of coal, rolling EE's ankle and left foot. EE was taken to OA where EE's x-rays revealed a small "jones" fracture in EE's left foot. EE started missing work on 06/10/2026.
103(i) Spot Inspections · 4.3 on-site hours
75.1910(d) · $151.00 proposed
75.1909(c)(5) · $151.00 proposed
Regular Safety and Health Inspection · 17.3 on-site hours
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
While throwing miner cable over, EE felt a sharp pain in EE's lower back. EE was seen at OA and placed off work starting on 6/1/2026 for a lower back strain.
103(i) Spot Inspections · 5.3 on-site hours
103(i) Spot Inspections · 5.0 on-site hours
Impoundment Spot Inspection · 3.5 on-site hours
103(i) Spot Inspections · 5.0 on-site hours
75.503 · S&S · $398.00 proposed
75.604(b) · S&S · $1,219.00 proposed
75.517 · $151.00 proposed
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 448,782 | 11,410 | 1.74 | 7.75 | 62.87 | |
| 2025-Q4 | 879,492 | 11,297 | 1.72 | 8.00 | 58.15 | |
| 2026-Q1 | 984,456 | 11,313 | 1.58 | 7.70 | 58.47 | |
| 2026-Q2 | 648,546 | 11,249 | 1.57 | 8.09 | 57.72 | |
| 2026-Q3 * | 136,837 | 11,251 | 1.52 | 9.17 | 61.92 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 11739 · preliminary | GIBSON SOUTH1202388 | James E. Rogers Energy Complex2721 · NC · ALLIANCE COAL | 25,446 | 93.64 | 11,222 | 0.84 | 12.10 | ContractBIT | Rail |
| 2026-07EIA row 12117 · preliminary | GIBSON SOUTH1202388 | Gibson6113 · IN · ALLIANCE COAL | 111,391 | 54.67 | 11,258 | 1.67 | 8.50 | ContractBIT | Rail |
| 2026-06EIA row 9602 · preliminary | GIBSON MINE1202215 | AES Petersburg994 · IN · ALLIANCE COAL | 40,310 | 58.73 | 11,395 | 1.67 | 7.40 | ContractBIT | Rail |
| 2026-06EIA row 9603 · preliminary | GIBSON MINE1202215 | AES Petersburg994 · IN · ALLIANCE COAL | 11,514 | 59.33 | 11,480 | 1.74 | 7.50 | ContractBIT | Truck |
| 2026-06EIA row 10212 · preliminary | GIBSON SOUTH1202388 | Gibson6113 · IN · ALLIANCE COAL | 84,933 | 54.32 | 11,181 | 1.63 | 8.30 | ContractBIT | Rail |
| 2026-06EIA row 10215 · preliminary | GIBSON SOUTH1202388 | Gibson6113 · IN · ALLIANCE COAL | 41,781 | 55.64 | 11,196 | 1.65 | 8.60 | SpotBIT | Rail |
| 2026-06EIA row 10277 · preliminary | GIBSON SOUTH1202388 | Merom6213 · IN · ALLIANCE COAL | 22,546 | 60.12 | 11,430 | 1.72 | 7.40 | ContractBIT | Truck |
| 2026-05EIA row 7796 · preliminary | GIBSON MINE1202215 | AES Petersburg994 · IN · ALLIANCE COAL | 23,961 | 58.21 | 11,405 | 1.51 | 7.50 | ContractBIT | Rail |
| 2026-05EIA row 7797 · preliminary | GIBSON MINE1202215 | AES Petersburg994 · IN · ALLIANCE COAL | 45,790 | 58.69 | 11,400 | 1.50 | 7.50 | ContractBIT | Rail |
| 2026-05EIA row 8355 · preliminary | GIBSON SOUTH1202388 | Gibson6113 · IN · ALLIANCE COAL | 13,993 | 53.95 | 11,142 | 1.40 | 8.60 | ContractBIT | Rail |
| 2026-05EIA row 8360 · preliminary | GIBSON SOUTH1202388 | Gibson6113 · IN · ALLIANCE COAL | 84,003 | 55.02 | 11,088 | 1.51 | 8.20 | SpotBIT | Rail |
| 2026-05EIA row 8413 · preliminary | GIBSON SOUTH1202388 | Merom6213 · IN · ALLIANCE COAL | 30,372 | 59.81 | 11,370 | 1.49 | 7.40 | ContractBIT | Truck |
| 2026-04EIA row 5971 · preliminary | GIBSON MINE1202215 | AES Petersburg994 · IN · ALLIANCE COAL | 23,257 | 57.75 | 11,320 | 1.54 | 7.50 | ContractBIT | Rail |
| 2026-04EIA row 5972 · preliminary | GIBSON MINE1202215 | AES Petersburg994 · IN · ALLIANCE COAL | 19,950 | 58.26 | 11,420 | 1.54 | 7.50 | ContractBIT | Truck |
| 2026-04EIA row 6184 · preliminary | GIBSON SOUTH1202388 | James E. Rogers Energy Complex2721 · NC · ALLIANCE COAL | 25,899 | 93.04 | 11,164 | 1.46 | 8.50 | ContractBIT | Rail |
| 2026-04EIA row 6549 · preliminary | GIBSON SOUTH1202388 | Gibson6113 · IN · ALLIANCE COAL | 69,920 | 53.56 | 11,187 | 1.55 | 8.70 | ContractBIT | Rail |
| 2026-04EIA row 6555 · preliminary | GIBSON SOUTH1202388 | Gibson6113 · IN · ALLIANCE COAL | 83,704 | 54.87 | 11,180 | 1.44 | 8.60 | SpotBIT | Rail |
| 2026-04EIA row 6615 · preliminary | GIBSON SOUTH1202388 | Merom6213 · IN · ALLIANCE COAL | 26,613 | 58.63 | 11,385 | 2.03 | 7.60 | ContractBIT | Truck |
| 2026-03EIA row 4086 · preliminary | GIBSON SOUTH1202388 | Bowen703 · GA · ALLIANCE COAL LLC | 29,470 | 82.26 | 11,174 | 1.48 | 8.50 | ContractBIT | Rail |
| 2026-03EIA row 4155 · preliminary | GIBSON MINE1202215 | AES Petersburg994 · IN · ALLIANCE COAL | 39,141 | 55.21 | 11,355 | 1.52 | 7.40 | ContractBIT | Truck |
| 2026-03EIA row 4156 · preliminary | GIBSON MINE1202215 | AES Petersburg994 · IN · ALLIANCE COAL | 35,097 | 57.53 | 11,285 | 1.44 | 7.30 | ContractBIT | Rail |
| 2026-03EIA row 4375 · preliminary | GIBSON SOUTH1202388 | James E. Rogers Energy Complex2721 · NC · ALLIANCE COAL | 25,067 | 93.08 | 11,255 | 1.50 | 8.40 | ContractBIT | Rail |
| 2026-03EIA row 4727 · preliminary | GIBSON SOUTH1202388 | Gibson6113 · IN · ALLIANCE COAL | 70,620 | 53.77 | 11,178 | 1.45 | 8.20 | ContractBIT | Rail |
| 2026-03EIA row 4730 · preliminary | GIBSON SOUTH1202388 | Gibson6113 · IN · ALLIANCE COAL | 109,579 | 55.12 | 11,185 | 1.44 | 8.10 | SpotBIT | Rail |
| 2026-03EIA row 4790 · preliminary | GIBSON SOUTH1202388 | Merom6213 · IN · ALLIANCE COAL | 29,372 | 55.38 | 11,405 | 1.48 | 7.20 | ContractBIT | Truck |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. 2 current coal members have no matching annual record; their coverage is unknown. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Gibson Mine1202215 · Location unavailable | — | — | — | — | No matching annual production record |
| Gibson South1202388 · Gibson, Indiana | 5,698,564 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
| Gibson North Processing1202494 · Location unavailable | — | — | — | — | No matching annual production record |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.