Coal production
2,858,764reported short tons
ALL STATUSES / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-18. All statuses records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Coyote Creek Mine3201028 · Active6/8 quarters reported | Mercer, NDSurface · MSHA: Coal (Lignite) | 2,858,764 | 329,077 | 12 | 3 | 152.5 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-18. All 1 mines listed under this operator were checked; 1 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 509,730 | 52,834 | 9.65 | 114 | 1/1 mines reporting |
| 2025 Q2 | 185,282 | 57,993 | 3.19 | 118 | 1/1 mines reporting |
| 2025 Q3 | 577,287 | 56,659 | 10.19 | 118 | 1/1 mines reporting |
| 2025 Q4 | 565,820 | 51,752 | 10.93 | 114 | 1/1 mines reporting |
| 2026 Q1 | 614,981 | 54,516 | 11.28 | 113 | 1/1 mines reporting |
| 2026 Q2 | 405,664 | 55,323 | 7.33 | 118 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-18
1 significant & substantial (S&S)
0 records classified as fatality
12 of 12 violations with amounts
7 inspections · 7 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 0 | 0 | — | 0 | 0 | 1 | 30.5 |
| 2025-Q2 | 0 | 0 | — | 1 | 0 | 0 | — |
| 2025-Q3 | 6 | 0 | 1,762.00 | 0 | 0 | 3 | 55.8 |
| 2025-Q4 | 0 | 0 | — | 0 | 0 | 0 | — |
| 2026-Q1 | 2 | 1 | 525.00 | 1 | 0 | 1 | 32.3 |
| 2026-Q2 | 0 | 0 | — | 1 | 0 | 0 | — |
| 2026-Q3 | 4 | 0 | 604.00 | 0 | 0 | 2 | 34.0 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
Compliance Follow-up Inspection · 0.5 on-site hours
77.404(a) · $151.00 proposed
77.1606(c) · $151.00 proposed
77.1104 · $151.00 proposed
77.1606(c) · $151.00 proposed
Regular Safety and Health Inspection · 33.5 on-site hours
MACHINERY · DAYS AWAY FROM WORK ONLY
A mechanic was working on a Sullair air compressor engine oil leak with the engine running. EE had an inspection mirror in EE's left hand and a flashlight in EE's right hand. EE observed that the engine was not leaking anymore so EE pulled EE's hands back. The fan caught EE's left hand and pulled it into the fan causing injuries to EE's left hand.
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
Employee was operating a loaded end dump truck, while EE was steering with EE's left arm EE received a sharp pain in EE's left shoulder. The employee did not report EE's injury to a supervisor until 2 hours after EE's shift ended at 4:00 p.m. EE sought medical attention hours later and was informed by that doctor to take the rest of the week off and got referred to an ortho dr.
48.27 · S&S · $374.00 proposed
77.205(b) · $151.00 proposed
Regular Safety and Health Inspection · 32.3 on-site hours
Spot Inspection · 8.5 on-site hours
Spot Inspection · 10.5 on-site hours
77.512 · $504.00 proposed
77.208(a) · $151.00 proposed
77.404(a) · $226.00 proposed
77.205(a) · $151.00 proposed
77.1102 · $226.00 proposed
77.204 · $504.00 proposed
Regular Safety and Health Inspection · 36.8 on-site hours
POWERED HAULAGE · DAYS AWAY FROM WORK ONLY
05/09/25 emp tipped a scraper onto its side while working on a slope. EE stated EE was not injured. On next scheduled shift 05/12, emp stated that EE injured right shoulder. Emp went to ER, X-rays done, was diagnosed with right shoulder pain, and released to return to work with no restrictions. The emp worked until 05/27 when MRI indicated EE could not work without restrictions.
Regular Safety and Health Inspection · 30.5 on-site hours
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 318,095 | 6,962 | 0.80 | 8.14 | 25.02 | |
| 2025-Q4 | 398,565 | 6,889 | 1.03 | 10.61 | 29.66 | |
| 2026-Q1 | 579,518 | 6,974 | 0.95 | 11.23 | 25.06 | |
| 2026-Q2 | 401,046 | 7,012 | 0.78 | 10.22 | 37.18 | |
| 2026-Q3 * | 192,031 | 6,989 | 0.84 | 9.10 | 33.37 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 12492 · preliminary | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 192,031 | 33.37 | 6,989 | 0.84 | 9.10 | ContractLIG | Tram/conveyor |
| 2026-06EIA row 10545 · preliminary | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 161,890 | 31.08 | 7,001 | 0.67 | 9.70 | ContractLIG | Tram/conveyor |
| 2026-05EIA row 8660 · preliminary | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 115,157 | 43.04 | 7,089 | 0.80 | 10.10 | ContractLIG | Tram/conveyor |
| 2026-04EIA row 6881 · preliminary | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 123,999 | 39.69 | 6,956 | 0.90 | 11.00 | ContractLIG | Tram/conveyor |
| 2026-03EIA row 5053 · preliminary | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 177,150 | 27.68 | 6,952 | 0.90 | 11.00 | ContractLIG | Tram/conveyor |
| 2026-02EIA row 3151 · preliminary | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 180,884 | 26.65 | 6,970 | 0.90 | 11.00 | ContractLIG | Tram/conveyor |
| 2026-01EIA row 1171 · preliminary | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 221,484 | 21.67 | 6,996 | 1.04 | 11.60 | ContractLIG | Tram/conveyor |
| 2025-11EIA row 32461 · final | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 205,664 | 24.75 | 6,836 | 0.80 | 9.30 | ContractLIG | Tram/conveyor |
| 2025-10EIA row 29522 · final | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 192,901 | 34.91 | 6,945 | 1.27 | 12.00 | ContractLIG | Tram/conveyor |
| 2025-09EIA row 26468 · final | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 173,620 | 25.81 | 7,001 | 0.75 | 7.50 | ContractLIG | Tram/conveyor |
| 2025-08EIA row 23377 · final | COYOTE CREEK MINE3201028 | Coyote8222 · ND · COYOTE CREEK MINING COMPANY LLC | 144,475 | 24.07 | 6,916 | 0.86 | 8.90 | ContractLIG | Tram/conveyor |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| Coyote Creek Mine3201028 · Mercer, North Dakota | 1,913,979 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.