MSHA DATABASEMSHA records · 16 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

Coyote Creek Mine

ActiveSurfaceCoal (Lignite)
MSHA MINE ID3201028
LOCATIONMercer, ND
PUBLIC RECORD2,230 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

12

1 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q36
  4. 2025 Q40
  5. 2026 Q12
  6. 2026 Q20
  7. 2026 Q34
  8. 2026 Q4 *0

Accident records

3

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q21
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q11
  6. 2026 Q21
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

2,891.00

12 of 12 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q31,762
  4. 2025 Q4—
  5. 2026 Q1525
  6. 2026 Q2—
  7. 2026 Q3604
  8. 2026 Q4 *—

On-site inspection hours

152.50

7 inspections · 7 with hours

  1. 2025 Q130.50
  2. 2025 Q2—
  3. 2025 Q355.75
  4. 2025 Q4—
  5. 2026 Q132.25
  6. 2026 Q2—
  7. 2026 Q334.00
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—00130.5
2025-Q200—100—
2025-Q3601,762.0000355.8
2025-Q400—000—
2026-Q121525.0010132.3
2026-Q200—100—
2026-Q340604.0000234.0
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF03121B

    Compliance Follow-up Inspection · 0.5 on-site hours

  2. violation5212221

    77.404(a) · $151.00 proposed

  3. violation5212220

    77.1606(c) · $151.00 proposed

  4. violation5212219

    77.1104 · $151.00 proposed

  5. violation5212218

    77.1606(c) · $151.00 proposed

  6. inspectionF03293A

    Regular Safety and Health Inspection · 33.5 on-site hours

  7. accident220260990012

    MACHINERY · DAYS AWAY FROM WORK ONLY

    Accident narrative

    A mechanic was working on a Sullair air compressor engine oil leak with the engine running. EE had an inspection mirror in EE's left hand and a flashlight in EE's right hand. EE observed that the engine was not leaking anymore so EE pulled EE's hands back. The fan caught EE's left hand and pulled it into the fan causing injuries to EE's left hand.

  8. accident220260440005

    POWERED HAULAGE · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was operating a loaded end dump truck, while EE was steering with EE's left arm EE received a sharp pain in EE's left shoulder. The employee did not report EE's injury to a supervisor until 2 hours after EE's shift ended at 4:00 p.m. EE sought medical attention hours later and was informed by that doctor to take the rest of the week off and got referred to an ortho dr.

  9. violation5054404

    48.27 · S&S · $374.00 proposed

  10. violation5054403

    77.205(b) · $151.00 proposed

  11. inspectionF01486B

    Regular Safety and Health Inspection · 32.3 on-site hours

  12. inspectionF0175E2

    Spot Inspection · 8.5 on-site hours

  13. inspectionF00F901

    Spot Inspection · 10.5 on-site hours

  14. violation5051376

    77.512 · $504.00 proposed

  15. violation5051375

    77.208(a) · $151.00 proposed

  16. violation5051374

    77.404(a) · $226.00 proposed

  17. violation5051373

    77.205(a) · $151.00 proposed

  18. violation5051372

    77.1102 · $226.00 proposed

  19. violation5051371

    77.204 · $504.00 proposed

  20. inspectionF009D65

    Regular Safety and Health Inspection · 36.8 on-site hours

  21. accident220251540008

    POWERED HAULAGE · DAYS AWAY FROM WORK ONLY

    Accident narrative

    05/09/25 emp tipped a scraper onto its side while working on a slope. EE stated EE was not injured. On next scheduled shift 05/12, emp stated that EE injured right shoulder. Emp went to ER, X-rays done, was diagnosed with right shoulder pain, and released to return to work with no restrictions. The emp worked until 05/27 when MRI indicated EE could not work without restrictions.

  22. inspection6472848

    Regular Safety and Health Inspection · 30.5 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS1,889,25511 rows · 1 receiving plants
HEAT CONTENT · BTU/LB6,964Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.89 / 10.15Separate averages over measured receipts
DELIVERED COST · USD/TON29.44100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *318,0956,9620.808.1425.02
2025-Q4398,5656,8891.0310.6129.66
2026-Q1579,5186,9740.9511.2325.06
2026-Q2401,0467,0120.7810.2237.18
2026-Q3 *192,0316,9890.849.1033.37
Month / sourceReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 12492 · preliminaryCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC192,03133.376,9890.849.10ContractLIGTram/conveyor
2026-06EIA row 10545 · preliminaryCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC161,89031.087,0010.679.70ContractLIGTram/conveyor
2026-05EIA row 8660 · preliminaryCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC115,15743.047,0890.8010.10ContractLIGTram/conveyor
2026-04EIA row 6881 · preliminaryCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC123,99939.696,9560.9011.00ContractLIGTram/conveyor
2026-03EIA row 5053 · preliminaryCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC177,15027.686,9520.9011.00ContractLIGTram/conveyor
2026-02EIA row 3151 · preliminaryCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC180,88426.656,9700.9011.00ContractLIGTram/conveyor
2026-01EIA row 1171 · preliminaryCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC221,48421.676,9961.0411.60ContractLIGTram/conveyor
2025-11EIA row 32461 · finalCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC205,66424.756,8360.809.30ContractLIGTram/conveyor
2025-10EIA row 29522 · finalCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC192,90134.916,9451.2712.00ContractLIGTram/conveyor
2025-09EIA row 26468 · finalCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC173,62025.817,0010.757.50ContractLIGTram/conveyor
2025-08EIA row 23377 · finalCoyote8222 · ND · COYOTE CREEK MINING COMPANY LLC144,47524.076,9160.868.90ContractLIGTram/conveyor
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Published county average
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Coyote Creek Mine3201028 · Mercer, North Dakota1,913,979———County sales or price not published2 eligible mines / 2 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYNACCO Industries Inc → Coyote Creek Mining Company, L.L.C. → Coyote Creek Mine
HISTORY RECORDS13 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

NACCO Industries InccontrolsCoyote Creek Mining Company, L.L.C.operatesCoyote Creek Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 3201028
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

16 historical accident/injury rows; 0 coded fatalities and 586 lost days across the published record.

ACCIDENT + INJURY RECORD7 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

39 violation rows across the full record; 2 carry an S&S flag and $11,737 appears in current assessed amounts.

ENFORCEMENT ACTIVITY21 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHcontext

Occupational health samples

206 coal dust; 87 noise. 0 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE293 samples
coal-dust-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

55K employee hours and 118 summed average employees across reported subunits in the latest published quarter.

2026-Q2406K tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

3 contested-violation rows, 3 civil-penalty docket/decision rows, and 1 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE7 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT7 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

32 inspection events and 2K published inspection hours across the historical record.

OVERSIGHT COVERAGE17 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records00 coal · 0 personal · 0 area
Sample status0 not voided0 voided · 0 status not reported
Personal samples with C/E > 1—0 published ratios · not a citation count
2026 · No reported dates in this selection
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
No silica records match these filters. Missing samples do not establish safe conditions.
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
521222177.404(a)Citation
521222077.1606(c)Citation
521221977.1104Citation
521221877.1606(c)Citation
505440448.27S&S
505440377.205(b)Citation
505137677.512Citation
505137577.208(a)Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustBULLDOZER OPERATOR
.019 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
0 mg/m³Not voided
NoiseBULLDOZER OPERATOR
PEL dose: 0%Action-level dose: 1%
NoiseBULLDOZER OPERATOR
PEL dose: 1%Action-level dose: 16%
Coal dustBULLDOZER OPERATOR
.021 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.012 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.016 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.028 mg/m³Not voided

SOURCE COVERAGE

Reporting dates and coverage

16 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors16Jan 5, 2015—Apr 2, 2026mine-keyed
Addresses of Recordidentity · logistics1Oct 28, 2015—Oct 28, 2015mine-keyed
Assessed Violationscompliance · legal39Sep 23, 2015—Jul 28, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal3May 5, 2016—Mar 10, 2022mine-keyed
Coal Dust Sampleshealth · safety206Sep 9, 2015—Jul 28, 2026mine-keyed
Conferencescompliance · legal1Feb 2, 2024—Feb 2, 2024mine-keyed
Contested Violationscompliance · legal3Sep 23, 2015—Sep 22, 2021mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety1,435Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety253Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance1Mar 10, 2014—Mar 10, 2014mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance99Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance14Not published—Not publishedmine-keyed
Inspectionssafety · compliance32Sep 8, 2015—Aug 21, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment87Sep 22, 2015—Jul 28, 2026mine-keyed
Quartz Samples — Coalhealth · safety—No published rowsabsent / not applicable
Violationscompliance · safety · legal39Sep 23, 2015—Jul 28, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.