ACTIVE / OPERATOR PORTFOLIO

CANYON FUEL COMPANY LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR IDP23684

MINE PORTFOLIO

3 of 3 mines and facilities

2025-01-01 – 2026-10-18. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
CASTLE VALLEY PREP PLANT4202455 · Active6/8 quarters reportedCarbon, UTFacility · MSHA: Coal (Bituminous)022,2760049.5
SKYLINE MINE #34201566 · Active6/8 quarters reportedCarbon, UTUnderground · MSHA: Coal (Bituminous)3,131,2031,210,611277132,590.0
SUFCO4200089 · Active6/8 quarters reportedSevier, UTUnderground · MSHA: Coal (Bituminous)5,173,8551,293,228351213,456.8

LOCATION

Portfolio map

3 of 3 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-18Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

628

63 significant & substantial (S&S)

  1. 2025 Q1106
  2. 2025 Q296
  3. 2025 Q3126
  4. 2025 Q497
  5. 2026 Q166
  6. 2026 Q255
  7. 2026 Q364
  8. 2026 Q4 *18

Accident records

34

0 records classified as fatality

  1. 2025 Q17
  2. 2025 Q26
  3. 2025 Q36
  4. 2025 Q46
  5. 2026 Q13
  6. 2026 Q21
  7. 2026 Q35
  8. 2026 Q4 *0

Proposed penalties · USD

391,335.00

586 of 628 violations with amounts

  1. 2025 Q1110,560
  2. 2025 Q242,322
  3. 2025 Q388,184
  4. 2025 Q492,179
  5. 2026 Q129,153
  6. 2026 Q214,869
  7. 2026 Q314,068
  8. 2026 Q4 *—

On-site inspection hours

6,096.25

49 inspections · 49 with hours

  1. 2025 Q1873.75
  2. 2025 Q2897.75
  3. 2025 Q31,078.25
  4. 2025 Q41,053.50
  5. 2026 Q1739.25
  6. 2026 Q2641.25
  7. 2026 Q3677.50
  8. 2026 Q4 *135.00
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q110610110,560.00703873.8
2025-Q296842,322.00606897.8
2025-Q31261388,184.006091,078.3
2025-Q4971292,179.006071,053.5
2026-Q1661029,153.00306739.3
2026-Q255614,869.001010641.3
2026-Q364314,068.00506677.5
2026-Q4 *181—002135.0

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5035567
    SKYLINE MINE #3 · 4201566

    75.503 · $366.00 proposed

  2. violation5035566
    SKYLINE MINE #3 · 4201566

    75.1713-7(c) · $288.00 proposed

  3. violation5035565
    SKYLINE MINE #3 · 4201566

    75.1725(a) · $465.00 proposed

  4. violation5037162
    SKYLINE MINE #3 · 4201566

    75.1725(a) · $209.00 proposed

  5. violation5035966
    SUFCO · 4200089

    75.517 · $226.00 proposed

  6. violation5035144
    SUFCO · 4200089

    75.1722(a) · S&S · $1,126.00 proposed

  7. violation5037161
    SKYLINE MINE #3 · 4201566

    75.370(a)(1) · $504.00 proposed

  8. violation5037160
    SKYLINE MINE #3 · 4201566

    75.1403 · $151.00 proposed

  9. violation5035564
    SKYLINE MINE #3 · 4201566

    75.333(h) · $549.00 proposed

  10. inspectionF033021
    SKYLINE MINE #3 · 4201566

    Regular Safety and Health Inspection · 188.3 on-site hours

  11. inspection6469830
    SUFCO · 4200089

    Regular Safety and Health Inspection · 476.0 on-site hours

  12. inspectionF01E434
    SUFCO · 4200089

    Special Emphasis Programs · 5.0 on-site hours

  13. inspectionF007B36
    CASTLE VALLEY PREP PLANT · 4202455

    Special Emphasis Programs · 1.5 on-site hours

  14. accident220260020003
    SKYLINE MINE #3 · 4201566

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Miner was stepping down a ladder and received a Jones Fracture to EE's left foot as EE transferred EE's weight.

  15. inspectionF00B8D3
    SKYLINE MINE #3 · 4201566

    Spot Inspection · 11.0 on-site hours

  16. violation5036118
    SKYLINE MINE #3 · 4201566

    75.363(a) · $755.00 proposed

  17. violation5036117
    SKYLINE MINE #3 · 4201566

    75.204(c)(1) · $151.00 proposed

  18. violation5035965
    SUFCO · 4200089

    75.333(h) · $151.00 proposed

  19. violation5035964
    SUFCO · 4200089

    75.400 · S&S · $755.00 proposed

  20. violation5035963
    SUFCO · 4200089

    75.1731(b) · S&S · $465.00 proposed

  21. violation5037159
    SKYLINE MINE #3 · 4201566

    75.400 · $465.00 proposed

  22. accident220253500018
    SUFCO · 4200089

    MACHINERY · DAYS AWAY FROM WORK ONLY

    Accident narrative

    While cleaning out dust hopper EE removed the guard and was working on unplugging the hopper when EE dropped EE's knife into the hopper. EE had thought that EE had turned off the hydraulic power and hydraulic lever on the agitator. When reaching into the hopper to get EE's knife the agitator came on and caught EE's right arm between the agitator and dust hopper.

  23. violation5030655
    SUFCO · 4200089

    75.400 · $151.00 proposed

  24. violation5035962
    SUFCO · 4200089

    75.1909(e) · $177.00 proposed

  25. violation5037158
    SKYLINE MINE #3 · 4201566

    75.370(a)(1) · $165.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-18.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-18 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS4,473,46036 rows · 3 receiving plants
HEAT CONTENT · BTU/LB11,227Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.82 / 11.88Separate averages over measured receipts
DELIVERED COST · USD/TON84.63100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *831,28510,8751.0112.6782.41
2025-Q41,277,15111,1320.8711.8381.84
2026-Q1987,08911,4190.6611.1985.94
2026-Q2991,35711,3240.7712.2187.61
2026-Q3 *386,57811,5580.7511.2987.65
Month / sourceMineReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-07EIA row 12137 · preliminarySUFCO4200089Hunter6165 · UT · SUFCO315,97087.5111,4540.7011.80ContractBITTruck
2026-07EIA row 12485 · preliminarySUFCO4200089Huntington8069 · UT · SUFCO70,60888.2812,0240.979.00ContractBITTruck
2026-06EIA row 10229 · preliminarySUFCO4200089Hunter6165 · UT · SUFCO312,88487.6511,4720.7011.80ContractBITTruck
2026-06EIA row 10536 · preliminarySUFCO4200089Huntington8069 · UT · SUFCO54,94190.3710,6851.0415.10ContractBITTruck
2026-06EIA row 10537 · preliminarySKYLINE MINE #34201566Huntington8069 · UT · WOLVERINE FUELS LLC.1,07090.3712,6640.519.00ContractBITTruck
2026-05EIA row 8368 · preliminarySUFCO4200089Hunter6165 · UT · SUFCO236,92386.5611,3240.7011.80ContractBITTruck
2026-05EIA row 8650 · preliminarySKYLINE MINE #34201566Huntington8069 · UT · WOLVERINE FUELS LLC.39,37589.6411,5281.1310.40ContractBITTruck
2026-05EIA row 8651 · preliminarySUFCO4200089Huntington8069 · UT · SUFCO53,98389.6410,5791.1216.30ContractBITTruck
2026-04EIA row 6569 · preliminarySUFCO4200089Hunter6165 · UT · SUFCO230,47987.0811,4020.7011.80ContractBITTruck
2026-04EIA row 6872 · preliminarySKYLINE MINE #34201566Huntington8069 · UT · WOLVERINE FUELS LLC.23,37887.8312,1720.378.80ContractBITTruck
2026-04EIA row 6873 · preliminarySUFCO4200089Huntington8069 · UT · SUFCO38,32487.8310,8541.2414.80ContractBITTruck
2026-03EIA row 4746 · preliminarySUFCO4200089Hunter6165 · UT · SUFCO185,28386.5311,3200.7011.80ContractBITTruck
2026-03EIA row 5041 · preliminarySKYLINE MINE #34201566Huntington8069 · UT · SKYLINE MINE6,15787.5111,7710.449.10ContractBITTruck
2026-03EIA row 5042 · preliminarySUFCO4200089Huntington8069 · UT · SUFCO36,73887.5211,8471.089.40ContractBITTruck
2026-02EIA row 2815 · preliminarySUFCO4200089Hunter6165 · UT · SUFCO241,22886.3611,2980.7011.80ContractBITTruck
2026-02EIA row 3139 · preliminarySKYLINE MINE #34201566Huntington8069 · UT · SKYLINE MINE35,55687.1411,9940.369.00ContractBITTruck
2026-02EIA row 3140 · preliminarySUFCO4200089Huntington8069 · UT · SUFCO41,28587.3411,7491.079.50ContractBITTruck
2026-01EIA row 835 · preliminarySUFCO4200089Hunter6165 · UT · SUFCO279,75583.6311,1570.7011.80ContractBITTruck
2026-01EIA row 1163 · preliminarySUFCO4200089Huntington8069 · UT · SUFCO52,88587.6011,9570.367.90ContractBITTruck
2026-01EIA row 1164 · preliminarySKYLINE MINE #34201566Huntington8069 · UT · SKYLINE MINE108,20287.6011,7930.3910.90ContractBITTruck
2025-12EIA row 34866 · finalSUFCO4200089Hunter6165 · UT · SUFCO306,10883.6311,1570.8111.80ContractBITTruck
2025-12EIA row 35466 · finalSUFCO4200089Huntington8069 · UT · SUFCO42,35985.4110,6151.2114.20ContractBITTruck
2025-12EIA row 35467 · finalSKYLINE MINE #34201566Huntington8069 · UT · SKYLINE MINE69,37385.4312,0160.449.50ContractBITTruck
2025-11EIA row 31874 · finalSUFCO4200089Hunter6165 · UT · SUFCO304,25178.2911,1620.8211.50ContractBITTruck
2025-11EIA row 32452 · finalSKYLINE MINE #34201566Huntington8069 · UT · SUFCO41,05882.8510,7491.1512.80ContractBITTruck
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-18. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 2 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Sufco4200089 · Sevier, Utah3,099,164———County sales or price not published1 eligible mines / 1 sales respondents
Skyline Mine #34201566 · Carbon, Utah2,963,808———County sales or price not published1 eligible mines / 1 sales respondents
Castle Valley Prep Plant4202455 · Carbon, Utah0———Preparation plant1 eligible mines / 1 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

SELECTED PORTFOLIO

1 linked controller.

Relationships reflect the selected mine status and current MSHA controller/operator fields.