MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

SKYLINE MINE #3

ActiveUndergroundCoal (Bituminous)
MSHA MINE ID4201566
LOCATIONCarbon, UT
PUBLIC RECORD32,830 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

275

23 significant & substantial (S&S)

  1. 2025 Q147
  2. 2025 Q257
  3. 2025 Q361
  4. 2025 Q462
  5. 2026 Q118
  6. 2026 Q27
  7. 2026 Q322
  8. 2026 Q4 *1

Accident records

13

0 records classified as fatality

  1. 2025 Q14
  2. 2025 Q23
  3. 2025 Q33
  4. 2025 Q41
  5. 2026 Q11
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

178,337.00

266 of 275 violations with amounts

  1. 2025 Q164,231
  2. 2025 Q221,053
  3. 2025 Q357,922
  4. 2025 Q421,100
  5. 2026 Q14,676
  6. 2026 Q22,135
  7. 2026 Q37,220
  8. 2026 Q4 *—

On-site inspection hours

2,536.50

19 inspections · 19 with hours

  1. 2025 Q1437.00
  2. 2025 Q2504.50
  3. 2025 Q3476.75
  4. 2025 Q4559.00
  5. 2026 Q1237.25
  6. 2026 Q2111.50
  7. 2026 Q3196.50
  8. 2026 Q4 *14.00
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q147364,231.00402437.0
2025-Q257521,053.00303504.5
2025-Q361857,922.00302476.8
2025-Q462221,100.00102559.0
2026-Q11834,676.00103237.3
2026-Q2712,135.00004111.5
2026-Q32217,220.00102196.5
2026-Q4 *10—00114.0

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5030954

    75.1100-3

  2. inspectionF020381

    Regular Safety and Health Inspection · 14.0 on-site hours

  3. inspectionF00E3EA

    Compliance Follow-up Inspection · 6.0 on-site hours

  4. accident220262370003

    STEPPING OR KNEELING ON OBJECT · DAYS AWAY FROM WORK ONLY

    Accident narrative

    While Place changing miner, employee stepped on a piece of coal twisting EE's ankle.

  5. violation5032044

    77.1110 · $226.00 proposed

  6. violation5032043

    77.512 · $288.00 proposed

  7. violation5032042

    77.512 · $151.00 proposed

  8. violation5032041

    41.20 · $151.00 proposed

  9. violation5037030

    75.1731(a) · $288.00 proposed

  10. violation5037029

    75.400 · $592.00 proposed

  11. violation5032040

    77.502 · $151.00 proposed

  12. violation9734386

    75.370(a)(1) · $151.00 proposed

  13. violation5036156

    75.222(a) · $288.00 proposed

  14. violation5036155

    75.202(a) · S&S · $1,431.00 proposed

  15. violation5036154

    75.1913(b) · $288.00 proposed

  16. violation5037028

    75.1731(a) · $288.00 proposed

  17. violation5037027

    75.400 · $592.00 proposed

  18. violation5037026

    77.1101(c) · $288.00 proposed

  19. violation5037025

    75.403 · $226.00 proposed

  20. violation5037024

    75.403 · $226.00 proposed

  21. violation5037023

    75.403 · $226.00 proposed

  22. violation5037022

    71.206(a) · $226.00 proposed

  23. violation5037021

    75.1101-7(c) · $226.00 proposed

  24. violation5037020

    75.220(a)(1) · $226.00 proposed

  25. violation5037019

    75.333(h) · $465.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS661,61112 rows · 2 receiving plants
HEAT CONTENT · BTU/LB11,138Weighted by reported tons
SULFUR / ASH · % BY WEIGHT0.89 / 12.36Separate averages over measured receipts
DELIVERED COST · USD/TON86.85100.0% of reported tons have usable costs
Quarterly receipts and quality
QuarterShort tonsHeat · Btu/lbSulfur %Ash %Delivered USD/ton
2025-Q3 *219,62310,5591.1414.4087.13
2025-Q4228,25011,0531.0012.4285.56
2026-Q1149,91511,8400.3810.3887.49
2026-Q263,82311,7820.849.7988.99
Month / sourceReceiving plant / supplierShort tonsDelivered USD/tonHeat · Btu/lbSulfur %Ash %PurchaseTransport
2026-06EIA row 10537 · preliminaryHuntington8069 · UT · WOLVERINE FUELS LLC.1,07090.3712,6640.519.00ContractBITTruck
2026-05EIA row 8650 · preliminaryHuntington8069 · UT · WOLVERINE FUELS LLC.39,37589.6411,5281.1310.40ContractBITTruck
2026-04EIA row 6872 · preliminaryHuntington8069 · UT · WOLVERINE FUELS LLC.23,37887.8312,1720.378.80ContractBITTruck
2026-03EIA row 5041 · preliminaryHuntington8069 · UT · SKYLINE MINE6,15787.5111,7710.449.10ContractBITTruck
2026-02EIA row 3139 · preliminaryHuntington8069 · UT · SKYLINE MINE35,55687.1411,9940.369.00ContractBITTruck
2026-01EIA row 1164 · preliminaryHuntington8069 · UT · SKYLINE MINE108,20287.6011,7930.3910.90ContractBITTruck
2025-12EIA row 35467 · finalHuntington8069 · UT · SKYLINE MINE69,37385.4312,0160.449.50ContractBITTruck
2025-11EIA row 32452 · finalHuntington8069 · UT · SUFCO41,05882.8510,7491.1512.80ContractBITTruck
2025-10EIA row 29512 · finalHuntington8069 · UT · SKYLINE MINE117,81986.5810,5931.2714.00ContractBITTruck
2025-09EIA row 26460 · finalHuntington8069 · UT · SKYLINE MINE103,72186.7510,6601.2113.90ContractBITTruck
2025-08EIA row 22832 · finalIntermountain Power Project6481 · UT · WOLVERINE FUELS LLC.2,34076.0811,3930.8112.40ContractBITRail
2025-08EIA row 23368 · finalHuntington8069 · UT · SKYLINE MINE113,56287.7010,4501.0914.90ContractBITTruck
Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Published county average
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Skyline Mine #34201566 · Carbon, Utah2,963,808———County sales or price not published1 eligible mines / 1 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYWolverine Fuels LLC → CANYON FUEL COMPANY LLC → SKYLINE MINE #3
HISTORY RECORDS38 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

Wolverine Fuels LLCcontrolsCanyon Fuel Company LLCoperatesSKYLINE MINE #3

msha-controller-operator-history · controller/operator co-tenure derived on mine 4201566
—

Arch Resources InccontrolsCanyon Fuel Company LLCoperatesSKYLINE MINE #3

msha-controller-operator-history · controller/operator co-tenure derived on mine 4201566
—

El Paso Energy CorpcontrolsUtah Fuel CompanyoperatesSKYLINE MINE #3

msha-controller-operator-history · controller/operator co-tenure derived on mine 4201566
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

214 historical accident/injury rows; 1 coded fatalities and 4,045 lost days across the published record.

ACCIDENT + INJURY RECORD58 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

4,214 violation rows across the full record; 656 carry an S&S flag and $2,887,939 appears in current assessed amounts.

ENFORCEMENT ACTIVITY1,492 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

16,491 coal dust; 688 coal quartz; 840 noise. 0 personal-sample rows have a published C/E ratio above 1; 139 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE18K samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

49K employee hours and 96 summed average employees across reported subunits in the latest published quarter.

2026-Q236K tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

121 contested-violation rows, 146 civil-penalty docket/decision rows, and 114 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE381 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT23 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

491 inspection events and 63K published inspection hours across the historical record.

OVERSIGHT COVERAGE113 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records88 coal · 0 personal · 0 area
Sample status8 not voided0 voided · 0 status not reported
Mean coal quartz concentration21.63 µg/m³8 eligible measurements · 0 missing concentration
2026 · Jan 12, 2026–Jul 8, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58542293 / lab 2026027883Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION18 µg/m³5.7% quartzNot voidedNot reported
58542603 / lab 2026027886Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION15 µg/m³4.1% quartzNot voidedNot reported
58538305 / lab 2026024918Coal quartzQuartzOCCUPATION CODE NOT FOUNDDESIGNATED AREA10 µg/m³4.1% quartzNot voidedNot reported
58538418 / lab 2026024917Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION87 µg/m³19.5% quartzNot voidedNot reported
58538408 / lab 2026024913Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION33 µg/m³12% quartzNot voidedNot reported
58516125 / lab 2026002144Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION3 µg/m³1% quartzNot voidedNot reported
58516101 / lab 2026002151Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION5 µg/m³1.3% quartzNot voidedNot reported
58516145 / lab 2026001071Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION2 µg/m³0.8% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
503095475.1100-3Citation
503204477.1110Citation
503204377.512Citation
503204277.512Citation
503204141.20Citation
503703075.1731(a)Citation
503702975.400Citation
503204077.502Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustCONTINUOUS MINER OPERATOR
.026 mg/m³Voided · INVALID PRODUCTION
Coal dustCONTINUOUS MINER OPERATOR
14.613 mg/m³Voided
Coal dustCONTINUOUS MINER OPERATOR
.108 mg/m³Voided · INVALID PRODUCTION
Coal dustOCCUPATION CODE NOT FOUND
.101 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
.064 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
.774 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
1.466 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
.078 mg/m³Voided

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors214Feb 6, 2000—Aug 20, 2026mine-keyed
Addresses of Recordidentity · logistics1Dec 27, 2023—Dec 27, 2023mine-keyed
Assessed Violationscompliance · legal4,149Jan 4, 2000—Aug 11, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal146May 25, 2000—Aug 18, 2026mine-keyed
Coal Dust Sampleshealth · safety16,491Jan 3, 2000—Oct 7, 2026mine-keyed
Conferencescompliance · legal114Apr 26, 2001—Jul 7, 2026mine-keyed
Contested Violationscompliance · legal121Apr 9, 2001—Jul 1, 2025mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety4,046Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety817Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance3Jan 1, 1979—Dec 20, 1996mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance412Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance82Not published—Not publishedmine-keyed
Inspectionssafety · compliance491Jan 3, 2000—Oct 1, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment840Apr 18, 2001—Aug 17, 2026mine-keyed
Quartz Samples — Coalhealth · safety688Jan 19, 2000—Jul 8, 2026mine-keyed
Violationscompliance · safety · legal4,214Jan 4, 2000—Oct 7, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.