SKYLINE MINE #3 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Maintenance of incombustible content of rock dust.
30 CFR 75.403
Maintenance of incombustible content of rock dust.
30 CFR 75.403
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1)
Maintenance of incombustible content of rock dust.
30 CFR 75.403
Maintenance of incombustible content of rock dust.
30 CFR 75.403
Verbal Hazard Complaint Inspections
0.0 on-site hours reported
Roof control plan.
30 CFR 75.220(a)(1)
Multi-gas detectors.
30 CFR 75.1714-7(a)
Condition and examination of firefighting equipment.
30 CFR 75.1100-3
Regular Safety and Health Inspection
79.3 on-site hours reported
Compliance Follow-up Inspection
6.0 on-site hours reported
Stepping or kneeling on object
Days away from work only
Accident narrative
While Place changing miner, employee stepped on a piece of coal twisting EE's ankle.
Examination and maintenance of firefighting equipment.
30 CFR 77.1110 · $226.00 proposed penalty
Inspection and cover plates.
30 CFR 77.512 · $288.00 proposed penalty
Inspection and cover plates.
30 CFR 77.512 · $151.00 proposed penalty
Legal identity report.
30 CFR 41.20 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Electric equipment; examination, testing, and maintenance.
30 CFR 77.502 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Roof control plan-approval criteria.
30 CFR 75.222(a) · $288.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $1,431.00 proposed penalty
Starting aids.
30 CFR 75.1913(b) · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $288.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.