Coal production
852,458reported short tons
ACTIVE / OPERATOR PORTFOLIO
Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.
MINE PORTFOLIO
2025-01-01 – 2026-10-13. Active records; production reporting is not required.
Material, method and type filters apply to this table. The portfolio’s status applies to the entire page. GEM fields describe their own release, not the selected MSHA year.
| Mine | Location / type | Coal · short tons | Hours worked | Violations | Accident records | On-site inspection hours |
|---|---|---|---|---|---|---|
| Hances Ridge Split #11519891 · Active6/8 quarters reported | Bell, KYSurface · MSHA: Coal (Bituminous) | 280,281 | 84,964 | 15 | 2 | 298.0 |
| Jericol1519986 · Active1/8 quarters reported | Harlan, KYSurface · MSHA: Coal (Bituminous) | 7,744 | 9,034 | 13 | 0 | 108.5 |
| N R G1512399 · Active6/8 quarters reported | Harlan, KYFacility · MSHA: Coal (Bituminous) | 0 | 279 | 13 | 1 | 135.0 |
| PARAGON LOADOUT4406943 · Active6/8 quarters reported | Wise, VAFacility · MSHA: Coal (Bituminous) | 0 | 15,122 | 18 | 1 | 178.3 |
| River Ridge P-11519895 · Active6/8 quarters reported | Letcher, KYSurface · MSHA: Coal (Bituminous) | 564,433 | 124,183 | 54 | 1 | 557.8 |
| Totz Prep Plant1510657 · Active6/8 quarters reported | Harlan, KYFacility · MSHA: Coal (Bituminous) | 0 | 91,762 | 42 | 1 | 505.3 |
Production and hours sum available quarterly reports. — means unavailable; zero safety records means none in the selected imported period. Ownership reflects the current MSHA record.
LOCATION
6 of 6 mines with usable MSHA coordinates. Select a marker to open a mine.
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. All 6 mines listed under this operator were checked; 6 have reports in the available quarters. Totals use current ownership.
reported short tons
reported employee hours
production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 114,555 | 54,086 | 2.12 | 72 | 5/6 mines reporting |
| 2025 Q2 | 118,574 | 53,989 | 2.20 | 74 | 5/6 mines reporting |
| 2025 Q3 | 121,003 | 53,032 | 2.28 | 77 | 5/6 mines reporting |
| 2025 Q4 | 146,933 | 49,543 | 2.97 | 75 | 5/6 mines reporting |
| 2026 Q1 | 166,481 | 52,839 | 3.15 | 73 | 5/6 mines reporting |
| 2026 Q2 | 184,912 | 61,855 | 2.99 | 94 | 6/6 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
2025-01-01 – 2026-10-13
19 significant & substantial (S&S)
0 records classified as fatality
128 of 155 violations with amounts
51 inspections · 51 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 34 | 3 | 5,817.00 | 2 | 0 | 7 | 340.0 |
| 2025-Q2 | 26 | 0 | 4,901.00 | 0 | 0 | 7 | 410.5 |
| 2025-Q3 | 8 | 0 | 1,057.00 | 0 | 0 | 5 | 83.3 |
| 2025-Q4 | 11 | 0 | 1,661.00 | 2 | 0 | 4 | 204.3 |
| 2026-Q1 | 27 | 5 | 4,320.00 | 1 | 0 | 13 | 205.0 |
| 2026-Q2 | 13 | 5 | 3,414.00 | 1 | 0 | 7 | 270.5 |
| 2026-Q3 | 36 | 6 | 1,963.00 | 0 | 0 | 8 | 269.3 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 0 | — |
All violations issued in the selected period. Counts combine subsections.
Spot Inspection · 9.0 on-site hours
Spot Inspection · 20.0 on-site hours
Spot Inspection · 7.8 on-site hours
77.1606(c)
77.1110
77.1606(c) · S&S
77.1605(d)
77.404(a) · S&S
77.208(d)
77.1605(d)
77.1109(a)
Spot Inspection · 1.0 on-site hours
77.1606(c) · S&S
77.505
77.400(a) · S&S
77.504
77.1000
Impoundment Spot Inspection · 7.0 on-site hours
77.1301(c)(5)
77.1301(c)(5)
77.1606(c)
77.1606(c)
77.1605(d)
77.1605(d)
77.1606(c)
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
EIA-923 · COAL RECEIPTS
Receipts reported by power plants and terminals, matched by MSHA mine ID.
| Quarter | Short tons | Heat · Btu/lb | Sulfur % | Ash % | Delivered USD/ton | |
|---|---|---|---|---|---|---|
| 2025-Q3 * | 142,385 | 12,472 | 0.96 | 10.92 | 130.46 | |
| 2025-Q4 | 184,610 | 12,475 | 1.02 | 11.34 | 124.10 | |
| 2026-Q1 | 126,325 | 12,424 | 1.01 | 11.40 | 129.53 | |
| 2026-Q2 | 183,441 | 12,488 | 0.98 | 11.34 | 135.68 | |
| 2026-Q3 * | 34,183 | 12,419 | 1.08 | 11.30 | 128.64 |
| Month / source | Mine | Receiving plant / supplier | Short tons | Delivered USD/ton | Heat · Btu/lb | Sulfur % | Ash % | Purchase | Transport |
|---|---|---|---|---|---|---|---|---|---|
| 2026-07EIA row 12278 · preliminary | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 34,183 | 128.64 | 12,419 | 1.08 | 11.30 | ContractBIT | Rail |
| 2026-06EIA row 10364 · preliminary | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 56,250 | 136.99 | 12,475 | 1.06 | 11.50 | ContractBIT | Rail |
| 2026-06EIA row 10644 · preliminary | KELLYVIEW LOADOUT FACILITY4406943 | WestRock-West Point Mill10017 · VA · 4TH GEN FUELS LLC | 2,307 | —Not published | 12,750 | 0.70 | 7.40 | ContractBIT | Rail |
| 2026-06EIA row 10716 · preliminary | RIVER RIDGE P11519895 | Florence Mill50806 · SC · 4TH GEN FUELS LLC | 7,458 | —Not published | 12,400 | 0.72 | 8.10 | ContractBIT | Rail / Truck |
| 2026-05EIA row 8491 · preliminary | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 47,633 | 137.78 | 12,496 | 0.99 | 11.60 | ContractBIT | Rail |
| 2026-04EIA row 6703 · preliminary | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 59,938 | 132.78 | 12,475 | 0.98 | 12.10 | ContractBIT | Rail |
| 2026-04EIA row 6978 · preliminary | KELLYVIEW LOADOUT FACILITY4406943 | WestRock-West Point Mill10017 · VA · 4TH GEN FUELS LLC | 2,517 | —Not published | 13,200 | 0.87 | 7.90 | ContractBIT | Rail |
| 2026-04EIA row 7051 · preliminary | RIVER RIDGE P11519895 | Florence Mill50806 · SC · 4TH GEN FUELS LLC | 7,338 | —Not published | 12,400 | 0.70 | 8.00 | ContractBIT | Rail |
| 2026-03EIA row 4883 · preliminary | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 47,245 | 130.15 | 12,379 | 1.03 | 11.90 | ContractBIT | Rail |
| 2026-02EIA row 2954 · preliminary | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 35,167 | 128.75 | 12,416 | 1.03 | 11.10 | ContractBIT | Rail |
| 2026-02EIA row 3249 · preliminary | KELLYVIEW LOADOUT FACILITY4406943 | WestRock-West Point Mill10017 · VA · 4TH GEN FUELS LLC | 2,340 | —Not published | 12,500 | 0.88 | 9.80 | ContractBIT | Rail |
| 2026-01EIA row 971 · preliminary | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 34,272 | 129.46 | 12,494 | 1.01 | 11.80 | ContractBIT | Rail |
| 2026-01EIA row 1362 · preliminary | RIVER RIDGE P11519895 | Florence Mill50806 · SC · 4TH GEN FUELS LLC | 7,301 | —Not published | 12,400 | 0.77 | 8.20 | ContractBIT | Rail |
| 2025-12EIA row 34085 · final | RIVER RIDGE P11519895 | Cooper1384 · KY · 4TH GEN FUELS LLC | 5,751 | 105.72 | 12,435 | 0.98 | 11.60 | SpotBIT | Truck |
| 2025-12EIA row 35002 · final | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 70,555 | 124.62 | 12,464 | 0.96 | 11.50 | ContractBIT | Rail |
| 2025-12EIA row 35584 · final | KELLYVIEW LOADOUT FACILITY4406943 | WestRock-West Point Mill10017 · VA · 4TH GEN FUELS LLC | 2,568 | —Not published | 12,500 | 0.79 | 7.00 | ContractBIT | Rail |
| 2025-11EIA row 31097 · final | RIVER RIDGE P11519895 | Cooper1384 · KY · 4TH GEN FUELS LLC | 6,894 | 107.34 | 12,625 | 0.99 | 11.20 | SpotBIT | Truck |
| 2025-11EIA row 32009 · final | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 35,311 | 125.47 | 12,428 | 1.06 | 11.70 | ContractBIT | Rail |
| 2025-10EIA row 28132 · final | RIVER RIDGE P11519895 | Cooper1384 · KY · 4TH GEN FUELS LLC | 5,950 | 110.02 | 12,940 | 1.01 | 10.50 | SpotBIT | Truck |
| 2025-10EIA row 29059 · final | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 47,802 | 128.71 | 12,460 | 1.16 | 12.10 | ContractBIT | Rail |
| 2025-10EIA row 29633 · final | KELLYVIEW LOADOUT FACILITY4406943 | WestRock-West Point Mill10017 · VA · 4TH GEN FUELS LLC | 2,510 | —Not published | 12,500 | 0.79 | 7.00 | ContractBIT | Rail |
| 2025-10EIA row 29754 · final | RIVER RIDGE P11519895 | Florence Mill50806 · SC · 4TH GEN FUELS LLC | 7,269 | —Not published | 12,400 | 0.78 | 6.60 | ContractBIT | Rail / Truck |
| 2025-09EIA row 25058 · final | RIVER RIDGE P11519895 | Cooper1384 · KY · 4TH GEN FUELS LLC | 1,473 | 97.75 | 11,615 | 1.03 | 16.30 | SpotBIT | Truck |
| 2025-09EIA row 25997 · final | KELLYVIEW LOADOUT FACILITY4406943 | Clover7213 · VA · 4TH GEN FUELS LLC | 47,743 | 128.91 | 12,485 | 1.01 | 11.30 | ContractBIT | Rail |
| 2025-08EIA row 21897 · final | RIVER RIDGE P11519895 | Cooper1384 · KY · 4TH GEN FUELS LLC | 3,921 | 107.94 | 12,645 | 0.87 | 12.20 | SpotBIT | Truck |
Delivered cost includes transport and is not mine revenue. Missing prices remain blank. * Fewer than three months are published in the selected quarter. Receipts reflect the months EIA has published; an unfinished quarter is not comparable with a full quarter. Portfolio matches use current ownership.
Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions
EIA ANNUAL COAL REPORT · 2024
Annual county prices and a production-based allocation of county coal sales.
The estimate assumes each eligible mine receives its county-average price and shares county sales in proportion to production. Actual sales and prices can differ substantially. Unavailable estimates are excluded; this is not a total for the whole portfolio. 2 current coal members have no matching annual record; their coverage is unknown. Annual price data uses a separate window from the MSHA charts.
| Mine / county | Annual production · tons | County FOB · USD/ton | Est. sales · tons | Est. coal revenue · USD | Basis / availability |
|---|---|---|---|---|---|
| River Ridge P-11519895 · Letcher, Kentucky | 310,570 | 92.61 | 315,622 | 29,229,752 | County allocation estimate22.64% of eligible county production8 eligible mines / 8 sales respondents |
| Totz Prep Plant1510657 · Harlan, Kentucky | 0 | 91.75 | — | — | Preparation plant13 eligible mines / 13 sales respondents |
| N R G1512399 · Location unavailable | — | — | — | — | No matching annual production record |
| Hances Ridge Split #11519891 · Bell, Kentucky | 76,857 | — | — | — | County sales or price not published2 eligible mines / 2 sales respondents |
| Jericol1519986 · Location unavailable | — | — | — | — | No matching annual production record |
| Paragon Loadout4406943 · Wise, Virginia | 0 | 101.34 | — | — | Preparation plant4 eligible mines / 4 sales respondents |
Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.
EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index
Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.
SELECTED PORTFOLIO
Relationships reflect the selected mine status and current MSHA controller/operator fields.