RIVER VIEW MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $697.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $209.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $697.00 proposed penalty
Cable fittings; suitability.
30 CFR 75.515 · $193.00 proposed penalty
Spot Inspections
103(i) · 7.0 on-site hours reported
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $193.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $245.00 proposed penalty
Short circuit protection; ratings and settings of circuit breakers.
30 CFR 75.601-1 · $209.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $697.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
30 CFR 75.1107-4(a)(2)(i) · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $2,712.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $2,133.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $245.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(i) · $151.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $465.00 proposed penalty
Automatic emergency-parking brakes.
30 CFR 75.523-3(c)(2) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $193.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S) · $432.00 proposed penalty
Spot Inspections
103(i) · 6.5 on-site hours reported
Machinery
No dys awy frm wrk,no rstr act
Accident narrative
The roof bolter operator was drilling a hole for a roof bolt when a thin piece of shale slid down the steel (4 1/2 inches by 9 inches, paper thin to 1/4 inch thick). Before the operator could stop the rotation, the shale broke loose hitting the operator on the tip of the nose. Stitches were placed in the nose and no work was missed.
Roof control plan.
30 CFR 75.220(a)(1) · $151.00 proposed penalty
Underground diesel fuel storage facilities and areas; construction and safety precautions.
30 CFR 75.1903(a)(2) · $193.00 proposed penalty
Spot Inspections
103(i) · 2.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.