← RIVER VIEW MINE

RIVER VIEW MINE safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-31Database snapshot · 2026-10-31

Safety activity

  1. Power wires and cables; insulation and protection.

    violationRecord 5044272

    30 CFR 75.517 · Significant and substantial (S&S) · $697.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5044095

    30 CFR 75.512 · $209.00 proposed penalty

  3. Machinery and equipment; operation and maintenance.

    violationRecord 5044094

    30 CFR 75.1725(a) · $193.00 proposed penalty

  4. Electric equipment; examination, testing and maintenance.

    violationRecord 5044093

    30 CFR 75.512 · $697.00 proposed penalty

  5. Cable fittings; suitability.

    violationRecord 5044092

    30 CFR 75.515 · $193.00 proposed penalty

  6. Spot Inspections

    inspectionRecord F01614E

    103(i) · 7.0 on-site hours reported

  7. Methane monitors.

    violationRecord 5044744

    30 CFR 75.342(a)(4) · $151.00 proposed penalty

  8. Installation of high-voltage transmission cables.

    violationRecord 5044743

    30 CFR 75.807 · $193.00 proposed penalty

  9. Mine ventilation plan; submission and approval.

    violationRecord 5044742

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  10. Short circuit protection; ratings and settings of circuit breakers.

    violationRecord 5044091

    30 CFR 75.601-1 · $209.00 proposed penalty

  11. Power wires and cables; insulation and protection.

    violationRecord 5044090

    30 CFR 75.517 · Significant and substantial (S&S) · $697.00 proposed penalty

  12. Automatic fire sensors and manual actuators; installation; minimum requirements.

    violationRecord 5044089

    30 CFR 75.1107-4(a)(2)(i) · $151.00 proposed penalty

  13. Mine ventilation plan; submission and approval.

    violationRecord 5048084

    30 CFR 75.370(a)(1) · $2,712.00 proposed penalty

  14. Mine ventilation plan; submission and approval.

    violationRecord 5048083

    30 CFR 75.370(a)(1) · $2,133.00 proposed penalty

  15. Mine ventilation plan; submission and approval.

    violationRecord 5048082

    30 CFR 75.370(a)(1) · $245.00 proposed penalty

  16. Escapeways; bituminous and lignite mines.

    violationRecord 5044088

    30 CFR 75.380(d)(7)(i) · $151.00 proposed penalty

  17. Permanent splicing of trailing cables.

    violationRecord 5044087

    30 CFR 75.604(b) · Significant and substantial (S&S) · $465.00 proposed penalty

  18. Automatic emergency-parking brakes.

    violationRecord 5041578

    30 CFR 75.523-3(c)(2) · $151.00 proposed penalty

  19. Protection from falls of roof, face and ribs.

    violationRecord 5044086

    30 CFR 75.202(a) · $193.00 proposed penalty

  20. Protection from falls of roof, face and ribs.

    violationRecord 5041577

    30 CFR 75.202(a) · Significant and substantial (S&S) · $432.00 proposed penalty

  21. Spot Inspections

    inspectionRecord F00EA27

    103(i) · 6.5 on-site hours reported

  22. Machinery

    accidentRecord 220261210026

    No dys awy frm wrk,no rstr act

    Accident narrative

    The roof bolter operator was drilling a hole for a roof bolt when a thin piece of shale slid down the steel (4 1/2 inches by 9 inches, paper thin to 1/4 inch thick). Before the operator could stop the rotation, the shale broke loose hitting the operator on the tip of the nose. Stitches were placed in the nose and no work was missed.

  23. Roof control plan.

    violationRecord 5044741

    30 CFR 75.220(a)(1) · $151.00 proposed penalty

  24. Underground diesel fuel storage facilities and areas; construction and safety precautions.

    violationRecord 5044085

    30 CFR 75.1903(a)(2) · $193.00 proposed penalty

  25. Spot Inspections

    inspectionRecord F01614D

    103(i) · 2.5 on-site hours reported

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.