RIVER VIEW MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Spot Inspections
103(i) · 8.0 on-site hours reported
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
Machinery
Perm tot or perm prtl disablty
Accident narrative
The roof bolter operator was injured while installing a roof bolt into the drill chuck. Inadvertently hit the rotation, the operator's right glove became entangled with the spinning bolt, causing fractures to the right arm and amputation of the right thumb. The thumb was reattached. The employee started missing work on 7/8/2026.
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(i) · $151.00 proposed penalty
Regular Safety and Health Inspection
782.5 on-site hours reported
Spot Inspections
103(i) · 6.0 on-site hours reported
Handling of materials
Days away from work only
Accident narrative
Employee strained their lower back while putting drill steels back into the bolter tray. Started missing work on 06/23/2026
Fire suppression systems for diesel-powered equipment and fuel transportation units.
30 CFR 75.1911(i) · $288.00 proposed penalty
Machinery
Days away from work only
Accident narrative
The operator was installing a roof bolt when a piece of the top fell hitting the left Achillies. The operator started missing work on 06/17/2026 for a bruised Achillies tendon.
Slip or fall of person
Days away from work only
Accident narrative
Employee was attempting to step through a man door and stumbled back on EE's left leg. Started missing work on 06/17/2026 for pain in the left knee.
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $151.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
While pulling on a hydraulic hose to feed from one side of the roof bolter to the other the EE felt a sharp pain in their right arm. Continued to work until 08/03/2026 to repair rotator cuff, and bicep tendon.
Protection of trailing cables.
30 CFR 75.606 · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Spot Inspections
103(i) · 6.0 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $226.00 proposed penalty
On-shift examination.
30 CFR 75.362(d)(1)(ii) · $209.00 proposed penalty
Spot Inspections
103(i) · 8.0 on-site hours reported
Nonpermissible diesel-powered equipment; design and performance requirements.
30 CFR 75.1909(a)(10) · $151.00 proposed penalty
Maintenance of diesel-powered equipment.
30 CFR 75.1914(a) · $151.00 proposed penalty
Spot Inspections
103(i) · 5.0 on-site hours reported
Slip or fall of person
Days away from work only
Accident narrative
As the Safety Technician was walking past the power center, EE tripped over a cable causing EE to fall awkwardly on EE's right knee. Started missing work on 5/18/2026.
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $151.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.