RIVER VIEW MINE safety activity
MSHA violations, accident reports and inspections.
Safety activity
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $592.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $592.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $592.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $209.00 proposed penalty
Approval of other fire suppression devices.
30 CFR 75.1107-13(g) · $151.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · $151.00 proposed penalty
103 (g) Written Notification Hazard Complaint Inspectio
1.0 on-site hours reported
Accumulation of combustible materials.
30 CFR 75.400 · $193.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $313.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $642.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $177.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $755.00 proposed penalty
Slip or fall of person
Days away from work only
Accident narrative
While exiting the scoop the scoop operator twisted their left knee. Started missing work on 02/20/2025.
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $313.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Criteria—Belt conveyors.
30 CFR 75.1403-5(h) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $245.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $755.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $267.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
Roof bolter strained EE's lower back loading pin boards onto the bolter. Started missing work on 02/25/2025.
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $288.00 proposed penalty
Ventilation controls.
30 CFR 75.333(c) · $245.00 proposed penalty
Protection of trailing cables.
30 CFR 75.606 · Significant and substantial (S&S) · $1,219.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.