Automatic fire sensors and manual actuators; installation; minimum requirements.
30 CFR 75.1107-4(c) · $193.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $549.00 proposed penalty
Methane monitors.
30 CFR 75.342(a)(4) · Significant and substantial (S&S) · $549.00 proposed penalty
Inspection of fire suppression devices.
30 CFR 75.1107-16(b) · $151.00 proposed penalty
Machinery
Days away from work only
Accident narrative
The roof bolter was drilling a hole for EE's rib pin when a rock fell hitting the canopy swinging in and striking EE's right shoulder, lower back and EE's right knee. The rock pushed EE's knee into EE's boom causing a contusion and swelling to the knee. Started missing work on 10/17/2025.
Criteria—Self-propelled personnel carriers.
30 CFR 75.1403-6(a)(1) · $151.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $151.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
The miner operator used EE's index finger to rub EE's right eye causing dirt from EE's glove to enter and scratch the eyeball. Seen the doctor on 10/15/2025 where medication eye drops were prescribed and no work was missed.
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $209.00 proposed penalty
Spot Inspections
103(i) · 7.5 on-site hours reported
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $151.00 proposed penalty
Power wires and cables; insulation and protection.
30 CFR 75.517 · Significant and substantial (S&S) · $642.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $193.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $549.00 proposed penalty
Slip or fall of person
Days away from work only
Accident narrative
While crossing over a supply trailer the tractor operator slipped and fell onto the ground. The operator worked until needing surgery to repair the left knee. Started missing work on 11/26/2025.
Accumulation of combustible materials.
30 CFR 75.400 · $288.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $209.00 proposed penalty
Handling of materials
Days away from work only
Accident narrative
while hanging the miner cable and water line that goes to the miner, the shuttle car operator strained EE's left shoulder. Started missing work on 10/03/2025 and returned to work on 10/08/2025.
Roof bolting.
30 CFR 75.204(c)(1) · $193.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $697.00 proposed penalty
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $226.00 proposed penalty
Fall of roof or back
No dys awy frm wrk,no rstr act
Accident narrative
The mechanic was setting on a golf cart when a thin piece of draw from the mine roof fell striking the mechanic in the scalp. Resulting in staples to close the wound. No work was missed.
Regular Safety and Health Inspection
1,079.5 on-site hours reported
Ventilation Technical Investigation
6.5 on-site hours reported
Spot Inspections
103(i) · 7.5 on-site hours reported
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.