MINE DETAILS
Pogo Mine
LOCATION
Mine location
1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.
Mine coordinates
- Pogo Mine64.25972, -146.11111Open map ↗
Quarterly trends
2025 Q1 – 2026 Q4
Database snapshot · 2026-10-13. MSHA quarterly production and employment reports.
Coal production
0reported short tons
Hours worked
1,416,647reported employee hours
Tons per hour
0.00production ÷ hours worked
Missing values appear as —. Totals use available reports. Tons per hour requires production and hours for the same quarters and a nonzero hours total. * Striped bars mark partial mine coverage or an incomplete quarter. See the table for coverage.
Quarterly data and reporting coverage
| Quarter | Coal (short tons) | Hours worked | Tons / hour | Avg. employees | Coverage |
|---|---|---|---|---|---|
| 2025 Q1 | 0 | 231,314 | 0.00 | 780 | 1/1 mines reporting |
| 2025 Q2 | 0 | 375,496 | 0.00 | 791 | 1/1 mines reporting |
| 2025 Q3 | 0 | 319,768 | 0.00 | 806 | 1/1 mines reporting |
| 2025 Q4 | 0 | 366,057 | 0.00 | 749 | 1/1 mines reporting |
| 2026 Q1 | — | — | — | — | No report |
| 2026 Q2 | 0 | 124,012 | 0.00 | 725 | 1/1 mines reporting |
| 2026 Q3 | — | — | — | — | No report |
| 2026 Q4 | — | — | — | — | No report |
Safety and enforcement
2025-01-01 – 2026-10-13
Violations
869 significant & substantial (S&S)
Accident records
460 records classified as fatality
Proposed penalties · USD
26,841.0082 of 86 violations with amounts
On-site inspection hours
859.5030 inspections · 30 with hours
Counts are published records, including contractor records. * The quarter was incomplete at the snapshot date; recent counts may rise as reports arrive. — means no reported amount or hours. Portfolio totals use current membership.
Quarterly safety data
| Quarter | Violations | S&S | Proposed USD | Accident records | Fatality records | Inspections | On-site hours |
|---|---|---|---|---|---|---|---|
| 2025-Q1 | 22 | 2 | 7,415.00 | 5 | 0 | 5 | 132.8 |
| 2025-Q2 | 13 | 2 | 3,205.00 | 7 | 0 | 2 | 123.8 |
| 2025-Q3 | 16 | 2 | 4,811.00 | 9 | 0 | 3 | 99.0 |
| 2025-Q4 | 6 | 0 | 1,028.00 | 5 | 0 | 4 | 101.5 |
| 2026-Q1 | 7 | 1 | 2,723.00 | 5 | 0 | 3 | 106.5 |
| 2026-Q2 | 7 | 1 | 2,984.00 | 5 | 0 | 4 | 155.8 |
| 2026-Q3 | 15 | 1 | 4,675.00 | 10 | 0 | 8 | 140.3 |
| 2026-Q4 * | 0 | 0 | — | 0 | 0 | 1 | 0.0 |
Most cited CFR sections
All violations issued in the selected period. Counts combine subsections.
Safety activity
Regular Safety and Health Inspection · 0.0 on-site hours
103 (g) Written Notification Hazard Complaint Inspectio · 0.0 on-site hours
Impoundment Spot Inspection · 4.8 on-site hours
MACHINERY · DAYS AWAY FROM WORK ONLY
Accident narrative
While inserting an empty NQ2 inner tube into the drill string, the Driller lowered the rod string using the feed ram. The inner tube encountered resistance, causing the IP's forearm to become trapped between the whale tail and mid-mast roller. Continued downward movement forced the IP's wrist backwards, resulting in a fracture to the right wrist.
103 (g) Written Notification Hazard Complaint Inspectio · 15.5 on-site hours
HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY
Accident narrative
The IP was in a active heading cleaning up supplies, while loading ground support plates into the back of a vehicle, the IP reports their finger was smashed when it was between the plates and the pickup bed
103 (g) Written Notification Hazard Complaint Inspectio · 7.5 on-site hours
Non-Injury Accident Investigation · 9.0 on-site hours
HANDTOOLS (NONPOWERED) · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
IP was breaking up a PVC collar pipe with a fin-hoe when a rock or piece of plastic broke free and struck them in the upper lip resulting in 4 sutures.
57.9315
Verbal Hazard Complaint Inspections · 17.5 on-site hours
MACHINERY · DAYS AWAY FROM WORK ONLY
Accident narrative
While removing a stuck bolt from a loader belly pan, on night shift, the bolt head sheared and the pan dropped unexpectedly. The IP's right index finger was contacted by the pan as it fell.
HANDLING OF MATERIALS · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
IP was working on a mucker tooth when Left thumb got pinched between bucket tooth and mounting block. IP was sent offsite to ER for X-rays. Left Thumb was fractured per ER.
OTHER · NO DYS AWY FRM WRK,NO RSTR ACT
Accident narrative
The IP was on the surface retrieving parts for a piping project when they were stung by a bee. The bee stung them on the R Side of their neck and experienced localized swelling. They had no other symptoms. Using the IP reported to the clinic where they were given a OTC antihistamine. The IP returned directly to work.
MACHINERY · DAYS AWAY FROM WORK ONLY
Accident narrative
IP was pumping grout for cable bolts, when a hole on the feed hose developed a hole, spraying grout onto their face and eyes. Injury diagnosed as severe ocular alkali burns and mild cornea edema.
57.14107(a) · $151.00 proposed
57.4104(b) · $151.00 proposed
57.4101 · $151.00 proposed
57.4201(a)(1) · $151.00 proposed
56.11001 · $151.00 proposed
57.16006 · $151.00 proposed
57.20003(a) · $151.00 proposed
57.20003(a) · $151.00 proposed
HANDTOOLS (NONPOWERED) · PERM TOT OR PERM PRTL DISABLTY
Accident narrative
While hitting an impact driver with a hammer to dislodge frozen bolt, IP inadvertently hit end of left thumb against metal object. Dx: Partial left thumb tip amputation.
57.8531(c) · $151.00 proposed
Safety sources and definitions
MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.
CFR headings link to the current Title 30 index; they are not historical legal determinations.
OWNERSHIP
Operator and controller history
Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.
Northern Star Resources LtdcontrolsNorthern Star (Pogo) LLCoperatesPogo Mine
msha-controller-operator-history · controller/operator co-tenure derived on mine 5001642Sumitomo Metal Mining Co Ltd et alcontrolsNorthern Star (Pogo) LLCoperatesPogo Mine
msha-controller-operator-history · controller/operator co-tenure derived on mine 5001642Teck CorpcontrolsNorthern Star (Pogo) LLCoperatesPogo Mine
msha-controller-operator-history · controller/operator co-tenure derived on mine 5001642Other historical summaries · source-specific periods
RECORD SUMMARY
Production, safety and enforcement
These summaries use the periods stated on each card, independently of the reporting period above.
Accidents and injuries
380 historical accident/injury rows; 0 coded fatalities and 7,020 lost days across the published record.
accidentsmine-production-quarterlyViolations and penalties
1,627 violation rows across the full record; 322 carry an S&S flag and $640,605 appears in current assessed amounts.
inspectionsviolationsassessed-violationsorders-107aOccupational health samples
437 personal; 60 area. 30 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.
personal-health-samplesarea-samplesQuarterly production and employment
124K employee hours and 725 summed average employees across reported subunits in the latest published quarter.
mine-production-quarterlymine-production-yearlyContests, conferences and decisions
165 contested-violation rows, 165 civil-penalty docket/decision rows, and 115 conference records linked by issuance number.
conferencescontested-violationscivil-penalty-dockets-decisionsContractors
Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.
contractor-production-quarterlycontractor-production-yearlyaccidentsviolationsInspections
248 inspection events and 18K published inspection hours across the historical record.
inspectionsviolationsHEALTH SAMPLING
Silica and quartz
Coal quartz, metal/nonmetal personal samples and area samples. Snapshot Oct 13, 2026. 37 silica records across the mine’s published history.
Personal silica samples · concentration / limit
Quarterly mean · published C/E ratio
— No eligible measurements. * Quarter in progress. Means describe the available samples, not average exposure across the mine.
Quartz % is the sample’s quartz content; µg/m³ is its reported concentration. Personal C/E is the ratio to the limit published with that sample. Personal and area concentration units and void status are not specified in those source files.
| Date / sample | Dataset / analyte | Occupation / area | Measurement | Sample status | Published action |
|---|---|---|---|---|---|
| 000000202603914400 | Metal/nonmetal areaQuartz, respirable, >1% Qtz | UG CONSTRUCTION | C/E not reportedConcentration: 0000.4900Source unit unspecified | Not reported | NO ACTIONInspection F038208 |
Sources and interpretation
- Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
- Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
- Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
- Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
- Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.
Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗
EIA + TITLE 30
EIA production and cited regulations
EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.
This can mean the operation is non-coal, inactive for the annual period, or outside the EIA-7A reporting population.
RECENT PUBLIC RECORDS
Recent violations and samples
Latest records retained for inspection; aggregates above use the full source history.
Coal dust, noise and other contaminants. Silica records above ↑
SOURCE COVERAGE
Reporting dates and coverage
16 datasets contain linked records. Missing datasets are listed below.
NOTES
Limitations
- Contractor production is entity-level and is never represented as mine-attributable.
- Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.