MSHA DATABASEMSHA records · 16 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

Pit 23-Fairplay

ActiveSurfaceConstruction Sand and Gravel
MSHA MINE ID0503092
LOCATIONPark, CO
PUBLIC RECORD1,344 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

15

2 significant & substantial (S&S)

  1. 2025 Q11
  2. 2025 Q20
  3. 2025 Q37
  4. 2025 Q41
  5. 2026 Q10
  6. 2026 Q26
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

4,178.00

15 of 15 violations with amounts

  1. 2025 Q1193
  2. 2025 Q2—
  3. 2025 Q32,808
  4. 2025 Q4177
  5. 2026 Q1—
  6. 2026 Q21,000
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

57.00

5 inspections · 5 with hours

  1. 2025 Q19.25
  2. 2025 Q2—
  3. 2025 Q316.25
  4. 2025 Q418.50
  5. 2026 Q1—
  6. 2026 Q213.00
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q110193.000019.3
2025-Q200—000—
2025-Q3722,808.0000116.3
2025-Q410177.0000118.5
2026-Q100—000—
2026-Q2601,000.0000213.0
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF02BB56

    Compliance Follow-up Inspection · 0.0 on-site hours

  2. violation5211307

    46.9(a) · $151.00 proposed

  3. violation5211306

    46.3(b)(2) · $151.00 proposed

  4. inspectionF02BB55

    Regular Safety and Health Inspection · 13.0 on-site hours

  5. violation5211305

    56.12068 · $151.00 proposed

  6. violation5211304

    56.12004 · $151.00 proposed

  7. violation5211303

    56.12068 · $151.00 proposed

  8. violation5211302

    56.4101 · $245.00 proposed

  9. violation9157758

    56.12013(b) · $177.00 proposed

  10. inspection6469662

    Regular Safety and Health Inspection · 18.5 on-site hours

  11. violation5057181

    45.4(b) · $151.00 proposed

  12. violation5057180

    56.14107(a) · S&S · $1,431.00 proposed

  13. violation5057179

    56.12032 · $366.00 proposed

  14. violation5057178

    56.14132(a) · S&S · $313.00 proposed

  15. violation5057177

    56.4101 · $151.00 proposed

  16. violation5057176

    56.20003(a) · $245.00 proposed

  17. violation5057175

    56.4201(a)(2) · $151.00 proposed

  18. inspectionF01D9FB

    Regular Safety and Health Inspection · 16.3 on-site hours

  19. inspectionF01D9DF

    Regular Safety and Health Inspection · 9.3 on-site hours

  20. violation9829731

    56.14132(b)(1) · $193.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYJames C Marvel Jr → Brannan Sand & Gravel Company, LLC → Pit 23-Fairplay
HISTORY RECORDS26 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

James C Marvel JrcontrolsBrannan Sand & Gravel Company, LLCoperatesPit 23-Fairplay

msha-controller-operator-history · controller/operator co-tenure derived on mine 0503092
—

W W SellerscontrolsBrannan Sand & Gravel CompanyoperatesPit 23-Fairplay

msha-controller-operator-history · controller/operator co-tenure derived on mine 0503092
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYneutral

Accidents and injuries

1 historical accident/injury rows; 0 coded fatalities and 3 lost days across the published record.

ACCIDENT + INJURY RECORD0 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

99 violation rows across the full record; 17 carry an S&S flag and $29,313 appears in current assessed amounts.

ENFORCEMENT ACTIVITY70 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

55 personal; 2 area. 4 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE57 samples
personal-health-samplesarea-samples
04 / PRODUCTIONcontext

Quarterly production and employment

10K employee hours and 19 summed average employees across reported subunits in the latest published quarter.

2026-Q20 tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

2 contested-violation rows, 2 civil-penalty docket/decision rows, and 2 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE6 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT4 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

26 inspection events and 604 published inspection hours across the historical record.

OVERSIGHT COVERAGE17 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records00 coal · 0 personal · 0 area
Sample status0 not voided0 voided · 0 status not reported
Personal samples with C/E > 1—0 published ratios · not a citation count
2026 · No reported dates in this selection
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
No silica records match these filters. Missing samples do not establish safe conditions.
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
521130746.9(a)Citation
521130646.3(b)(2)Citation
521130556.12068Citation
521130456.12004Citation
521130356.12068Citation
521130256.4101Citation
915775856.12013(b)Citation
505718145.4(b)Citation
OTHER HEALTH SAMPLES4 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Respirable dust, <.1mgFront-end Loader Operator
C/E: 00.00Concentration: 0000.00 · limit: 0000.00Source unit unspecified
Zinc oxide fumesWelder, etc.
C/E: 00.00Concentration: 0000.00 · limit: 0010.00Source unit unspecified
Vanadium fumesWelder, etc.
C/E: 00.00Concentration: 0000.00 · limit: 0050.00Source unit unspecified
Nickel fumesWelder, etc.
C/E: 00.00Concentration: 0000.00 · limit: 0003.00Source unit unspecified

SOURCE COVERAGE

Reporting dates and coverage

16 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors1Sep 4, 2018—Sep 4, 2018mine-keyed
Addresses of Recordidentity · logistics1Oct 1, 2018—Oct 1, 2018mine-keyed
Assessed Violationscompliance · legal98Jul 10, 2017—May 7, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal2Jun 13, 2024—Jun 13, 2024mine-keyed
Coal Dust Sampleshealth · safety—No published rowsabsent / not applicable
Conferencescompliance · legal2Mar 3, 2026—Mar 3, 2026mine-keyed
Contested Violationscompliance · legal2May 18, 2023—May 18, 2023mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety753Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety206Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance2Jan 1, 1950—Jun 13, 2017mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance74Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance20Not published—Not publishedmine-keyed
Inspectionssafety · compliance26Jul 10, 2017—May 13, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety2Jul 11, 2017—Feb 16, 2018mine-keyed
Metal and Nonmetal Personal Health Sampleshealth · safety55Jan 3, 2018—Aug 20, 2024mine-keyed
Noise Sampleshealth · safety · equipment—No published rowsabsent / not applicable
Quartz Samples — Coalhealth · safety—No published rowsabsent / not applicable
Violationscompliance · safety · legal99Jul 10, 2017—May 7, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.