MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

PANTHER MINE

ActiveUndergroundCoal (Bituminous)
MSHA MINE ID1518198
LOCATIONHarlan, KY
PUBLIC RECORD19,391 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

128

14 significant & substantial (S&S)

  1. 2025 Q124
  2. 2025 Q222
  3. 2025 Q317
  4. 2025 Q410
  5. 2026 Q131
  6. 2026 Q215
  7. 2026 Q39
  8. 2026 Q4 *0

Accident records

6

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q21
  3. 2025 Q32
  4. 2025 Q40
  5. 2026 Q12
  6. 2026 Q20
  7. 2026 Q31
  8. 2026 Q4 *0

Proposed penalties · USD

40,715.00

124 of 128 violations with amounts

  1. 2025 Q17,690
  2. 2025 Q24,543
  3. 2025 Q32,265
  4. 2025 Q41,908
  5. 2026 Q120,017
  6. 2026 Q22,580
  7. 2026 Q31,712
  8. 2026 Q4 *—

On-site inspection hours

2,561.00

64 inspections · 64 with hours

  1. 2025 Q1393.75
  2. 2025 Q2373.75
  3. 2025 Q3371.50
  4. 2025 Q4377.50
  5. 2026 Q1439.25
  6. 2026 Q2314.50
  7. 2026 Q3267.75
  8. 2026 Q4 *23.00
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q12437,690.00009393.8
2025-Q22234,543.00108373.8
2025-Q31702,265.002010371.5
2025-Q41011,908.00007377.5
2026-Q131620,017.002011439.3
2026-Q21502,580.000010314.5
2026-Q3911,712.00107267.8
2026-Q4 *00—00223.0

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF019601

    103(i) Spot Inspections · 8.0 on-site hours

  2. inspectionF014A20

    Regular Safety and Health Inspection · 15.0 on-site hours

  3. inspectionF00549F

    103(i) Spot Inspections · 6.0 on-site hours

  4. inspectionF014A1E

    103(i) Spot Inspections · 6.0 on-site hours

  5. inspectionF014A1A

    103(i) Spot Inspections · 6.5 on-site hours

  6. inspectionF021181

    103(i) Spot Inspections · 6.0 on-site hours

  7. inspectionF021180

    103(i) Spot Inspections · 9.0 on-site hours

  8. violation5086089

    75.517 · S&S · $504.00 proposed

  9. violation5086088

    75.1714-4(e) · $151.00 proposed

  10. violation5086087

    75.1910(i) · $151.00 proposed

  11. accident220262090012

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    Employee was rock dusting belt by hand, when they felt a sharp pain in lower back.

  12. violation5086086

    75.517 · $151.00 proposed

  13. violation5086085

    75.503 · $151.00 proposed

  14. violation5086084

    75.503 · $151.00 proposed

  15. inspectionF005496

    103(i) Spot Inspections · 6.0 on-site hours

  16. violation5086083

    75.204(c)(1) · $151.00 proposed

  17. violation5086082

    75.517 · $151.00 proposed

  18. violation5086081

    75.333(d)(2) · $151.00 proposed

  19. inspectionF02117F

    Regular Safety and Health Inspection · 228.3 on-site hours

  20. inspectionF014A11

    103(i) Spot Inspections · 7.0 on-site hours

  21. inspectionF00DC82

    Spot Inspection · 8.0 on-site hours

  22. inspectionF003CF9

    Spot Inspection · 7.0 on-site hours

  23. inspectionF02117B

    103(i) Spot Inspections · 5.0 on-site hours

  24. violation5080039

    75.503 · $151.00 proposed

  25. violation5080038

    75.342(a)(4) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON91.75Published county average
ESTIMATED SALES · SHORT TONS505,104Allocated from published county sales
ESTIMATED COAL REVENUE · USD46,343,325Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%1 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Panther Mine1518198 · Harlan, Kentucky503,36091.75505,10446,343,325County allocation estimate22.17% of eligible county production13 eligible mines / 13 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYJavelin Global Commodities (UK) Ltd → Bluegrass Natural Resources, LLC → PANTHER MINE
HISTORY RECORDS921 relationships
INTERVAL CHECK2 REVIEWcontroller/operator overlap
—

Javelin Global Commodities (UK) LtdcontrolsBluegrass Natural Resources, LLCoperatesPANTHER MINE

msha-controller-operator-history · controller/operator co-tenure derived on mine 1518198
—

Industrial Minerals Group LLCcontrolsINMET Mining, LLC.operatesPANTHER MINE

msha-controller-operator-history · controller/operator co-tenure derived on mine 1518198
—

Jeffery A HoopscontrolsBlackjewel L.L.C.operatesPANTHER MINE

msha-controller-operator-history · controller/operator co-tenure derived on mine 1518198
—

Alpha Natural Resources, Inc.controlsNorth Fork Coal CorporationoperatesPANTHER MINE

msha-controller-operator-history · controller/operator co-tenure derived on mine 1518198
—

Massey Energy CompanycontrolsNorth Fork Coal CorporationoperatesPANTHER MINE

msha-controller-operator-history · controller/operator co-tenure derived on mine 1518198
—

Cumberland Resources CorporationcontrolsNorth Fork Coal CorporationoperatesPANTHER MINE

msha-controller-operator-history · controller/operator co-tenure derived on mine 1518198
—

Alpha Natural Resources, Inc.controlsPanther Mining LLCoperatesPANTHER MINE

msha-controller-operator-history · controller/operator co-tenure derived on mine 1518198
—

Massey Energy CompanycontrolsPanther Mining LLCoperatesPANTHER MINE

msha-controller-operator-history · controller/operator co-tenure derived on mine 1518198
—

Cumberland Resources CorporationcontrolsPanther Mining LLCoperatesPANTHER MINE

msha-controller-operator-history · controller/operator co-tenure derived on mine 1518198
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

231 historical accident/injury rows; 1 coded fatalities and 7,268 lost days across the published record.

ACCIDENT + INJURY RECORD39 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

3,185 violation rows across the full record; 738 carry an S&S flag and $1,623,827 appears in current assessed amounts.

ENFORCEMENT ACTIVITY449 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

6,125 coal dust; 385 coal quartz; 637 noise. 0 personal-sample rows have a published C/E ratio above 1; 104 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE7K samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

72K employee hours and 108 summed average employees across reported subunits in the latest published quarter.

2026-Q2129K tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

1,350 contested-violation rows, 1,381 civil-penalty docket/decision rows, and 173 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE2,904 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT18 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

413 inspection events and 39K published inspection hours across the historical record.

OVERSIGHT COVERAGE178 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records1515 coal · 0 personal · 0 area
Sample status15 not voided0 voided · 0 status not reported
Mean coal quartz concentration8.73 µg/m³15 eligible measurements · 0 missing concentration
2026 · Jan 20, 2026–Jul 17, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58543674 / lab 2026029736Coal quartzQuartzSHUTTLE CAR OPERATOR (STANDARD SIDE)NON DESIGNATED OCCUPATION4 µg/m³2% quartzNot voidedNot reported
58543673 / lab 2026029738Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION8 µg/m³3.1% quartzNot voidedNot reported
58543692 / lab 2026029742Coal quartzQuartzSHUTTLE CAR OPERATOR (STANDARD SIDE)NON DESIGNATED OCCUPATION4 µg/m³1.6% quartzNot voidedNot reported
58543593 / lab 2026029741Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION3 µg/m³1.6% quartzNot voidedNot reported
58543603 / lab 2026028907Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION3 µg/m³2% quartzNot voidedNot reported
58548622 / lab 2026017393Coal quartzQuartzSHUTTLE CAR OPERATOR (STANDARD SIDE)NON DESIGNATED OCCUPATION24 µg/m³3.5% quartzNot voidedNot reported
58548830 / lab 2026017395Coal quartzQuartzSHUTTLE CAR OPERATOR (STANDARD SIDE)NON DESIGNATED OCCUPATION14 µg/m³3.3% quartzNot voidedNot reported
58548635 / lab 2026017397Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION23 µg/m³4.2% quartzNot voidedNot reported
58548689 / lab 2026017391Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION7 µg/m³2.8% quartzNot voidedNot reported
58548621 / lab 2026014858Coal quartzQuartzROOF BOLTER (TWIN HEAD) (RETURN SIDE)NON DESIGNATED OCCUPATION4 µg/m³3.3% quartzNot voidedNot reported
58548844 / lab 2026014857Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION11 µg/m³3.8% quartzNot voidedNot reported
58548666 / lab 2026004858Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION5 µg/m³1.5% quartzNot voidedNot reported
58549185 / lab 2026003012Coal quartzQuartzCONTINUOUS MINER OPERATORDESIGNATED OCCUPATION6 µg/m³2.3% quartzNot voidedNot reported
58549133 / lab 2026003015Coal quartzQuartzSHUTTLE CAR OPERATOR (STANDARD SIDE)NON DESIGNATED OCCUPATION7 µg/m³2.5% quartzNot voidedNot reported
58549134 / lab 2026003013Coal quartzQuartzSHUTTLE CAR OPERATOR (STANDARD SIDE)NON DESIGNATED OCCUPATION8 µg/m³2.4% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

EIA MINE CONTEXT2024 record
ANNUAL COAL PRODUCTION503,360short tons
LABOR HOURS
277,357
AVG EMPLOYEES
115
SUPPLY REGION
Appalachia Central
UNION
No union code published
OPERATION
Mine only
COMPANY TYPE
Independent Producer Operator

1 published EIA row aggregated under this MSHA ID. Components remain available in JSON.

TITLE 30 CROSSWALKCurrent through 2026-08-19

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
508608975.517S&S
508608875.1714-4(e)Citation
508608775.1910(i)Citation
508608675.517Citation
508608575.503Citation
508608475.503Citation
508608375.204(c)(1)Citation
508608275.517Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustCONTINUOUS MINER OPERATOR
.178 mg/m³Not voided
Coal dustCONTINUOUS MINER OPERATOR
.208 mg/m³Not voided
Coal dustCONTINUOUS MINER OPERATOR
.387 mg/m³Not voided
Coal dustCONTINUOUS MINER OPERATOR
.534 mg/m³Not voided
Coal dustCONTINUOUS MINER OPERATOR
.291 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
.355 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
.537 mg/m³Not voided
Coal dustOCCUPATION CODE NOT FOUND
.281 mg/m³Not voided

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors231Oct 14, 2002—Jul 20, 2026mine-keyed
Addresses of Recordidentity · logistics1Apr 26, 2021—Apr 26, 2021mine-keyed
Assessed Violationscompliance · legal3,118Sep 13, 2002—Aug 3, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal1,381Nov 18, 2003—Oct 15, 2019mine-keyed
Coal Dust Sampleshealth · safety6,125Sep 19, 2002—Oct 7, 2026mine-keyed
Conferencescompliance · legal173Jan 14, 2003—Jul 30, 2026mine-keyed
Contested Violationscompliance · legal1,350Mar 11, 2004—Feb 12, 2026mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety1,685Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety410Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance9Sep 1, 1999—Aug 3, 2023mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance232Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance55Not published—Not publishedmine-keyed
Inspectionssafety · compliance413Mar 13, 2000—Oct 8, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment637Sep 19, 2002—Jul 17, 2026mine-keyed
Quartz Samples — Coalhealth · safety385Oct 29, 2002—Jul 17, 2026mine-keyed
Violationscompliance · safety · legal3,185Sep 13, 2002—Aug 3, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.