ACTIVE / OPERATOR PORTFOLIO

Bluegrass Natural Resources, LLC

Membership and operating status are from the latest MSHA Mines snapshot. Open a mine for its ownership history.

MSHA OPERATOR ID0190634

MINE PORTFOLIO

6 of 6 mines and facilities

2025-01-01 – 2026-10-13. Active records; production reporting is not required.

MineLocation / typeCoal · short tonsHours workedViolationsAccident recordsOn-site inspection hours
CAVE BRANCH PLANT1516054 · Active6/8 quarters reportedHarlan, KYFacility · MSHA: Coal (Bituminous)0259,541300445.3
Cloverlick Kellioka Mine1519973 · Active6/8 quarters reportedHarlan, KYUnderground · MSHA: Coal (Bituminous)186,287153,835360798.0
LONE MOUNTAIN PLANT4405898 · Active6/8 quarters reportedLee, VAFacility · MSHA: Coal (Bituminous)016,24310126.0
ORCHARD BRANCH OWL MINE1519860 · Active6/8 quarters reportedHarlan, KYUnderground · MSHA: Coal (Bituminous)384,440211,9726451,216.3
PANTHER MINE1518198 · Active6/8 quarters reportedHarlan, KYUnderground · MSHA: Coal (Bituminous)736,384387,88912862,561.0
Trace Branch Splint Mine1519974 · Active6/8 quarters reportedHarlan, KYUnderground · MSHA: Coal (Bituminous)161,110114,288464886.8

LOCATION

Portfolio map

6 of 6 mines with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

305

28 significant & substantial (S&S)

  1. 2025 Q150
  2. 2025 Q239
  3. 2025 Q329
  4. 2025 Q436
  5. 2026 Q164
  6. 2026 Q243
  7. 2026 Q340
  8. 2026 Q4 *4

Accident records

15

0 records classified as fatality

  1. 2025 Q11
  2. 2025 Q22
  3. 2025 Q32
  4. 2025 Q41
  5. 2026 Q13
  6. 2026 Q22
  7. 2026 Q34
  8. 2026 Q4 *0

Proposed penalties · USD

69,048.00

276 of 305 violations with amounts

  1. 2025 Q112,629
  2. 2025 Q27,127
  3. 2025 Q34,091
  4. 2025 Q45,975
  5. 2026 Q126,234
  6. 2026 Q28,864
  7. 2026 Q34,128
  8. 2026 Q4 *—

On-site inspection hours

6,033.25

135 inspections · 135 with hours

  1. 2025 Q1698.25
  2. 2025 Q2837.50
  3. 2025 Q3764.00
  4. 2025 Q4882.75
  5. 2026 Q1997.75
  6. 2026 Q21,039.25
  7. 2026 Q3759.75
  8. 2026 Q4 *54.00
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q150712,629.001013698.3
2025-Q23937,127.002017837.5
2025-Q32904,091.002020764.0
2025-Q43625,975.001016882.8
2026-Q164926,234.003022997.8
2026-Q24348,864.0020221,039.3
2026-Q34034,128.004019759.8
2026-Q4 *40—00654.0

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF019601
    PANTHER MINE · 1518198

    103(i) Spot Inspections · 8.0 on-site hours

  2. violation5085178
    CAVE BRANCH PLANT · 1516054

    77.205(a)

  3. violation5085177
    CAVE BRANCH PLANT · 1516054

    77.1104

  4. violation5085176
    CAVE BRANCH PLANT · 1516054

    77.1606(c)

  5. violation5085894
    Trace Branch Splint Mine · 1519974

    75.362(d)(2)

  6. inspectionF0016BE
    CAVE BRANCH PLANT · 1516054

    Regular Safety and Health Inspection · 0.0 on-site hours

  7. inspectionF014A20
    PANTHER MINE · 1518198

    Regular Safety and Health Inspection · 15.0 on-site hours

  8. inspectionF02B8B8
    ORCHARD BRANCH OWL MINE · 1519860

    Regular Safety and Health Inspection · 23.0 on-site hours

  9. inspectionF021189
    Cloverlick Kellioka Mine · 1519973

    Regular Safety and Health Inspection · 0.0 on-site hours

  10. inspectionF01F07A
    Trace Branch Splint Mine · 1519974

    Regular Safety and Health Inspection · 8.0 on-site hours

  11. violation8853273
    Trace Branch Splint Mine · 1519974

    75.1505(a)

  12. inspectionF00549F
    PANTHER MINE · 1518198

    103(i) Spot Inspections · 6.0 on-site hours

  13. violation5085893
    Trace Branch Splint Mine · 1519974

    75.1403

  14. inspectionF02B8B4
    ORCHARD BRANCH OWL MINE · 1519860

    Spot Inspection · 5.8 on-site hours

  15. accident220262720004
    Trace Branch Splint Mine · 1519974

    POWERED HAULAGE · DAYS AWAY FROM WORK ONLY

    Accident narrative

    EE was located in an intersection when EE was struck by a battery-powered scoop. Following the incident, EE was immediately transported to the surface. EE sustained a posterior dislocation of the left hip with a fracture of the femur ball socket.

  16. inspectionF01F079
    Trace Branch Splint Mine · 1519974

    Non-Fatal Accident Investigation · 22.3 on-site hours

  17. violation5085892
    Trace Branch Splint Mine · 1519974

    75.1403

  18. violation5085891
    Trace Branch Splint Mine · 1519974

    75.400 · S&S

  19. violation5085889
    Trace Branch Splint Mine · 1519974

    Description not reported

  20. violation5085890
    Trace Branch Splint Mine · 1519974

    75.1107-4(a)(2)(ii)

  21. violation5085262
    Trace Branch Splint Mine · 1519974

    75.503

  22. violation5085261
    Trace Branch Splint Mine · 1519974

    75.512

  23. violation5085260
    Trace Branch Splint Mine · 1519974

    75.517 · S&S

  24. accident220262720033
    Trace Branch Splint Mine · 1519974

    HANDLING OF MATERIALS · DAYS AWAY FROM WORK ONLY

    Accident narrative

    The employee was removing a chain from the continuous miner trailing cable when the cable coupler (cathead) slid from the top of the power center, inadvertently striking the employee in the face. After being struck by the cable coupler, the employee received two broken teeth and chipped another. * Note: The two teeth that were broken were already implanted. (False teeth) *

  25. inspectionF01F078
    Trace Branch Splint Mine · 1519974

    Spot Inspection · 10.8 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this operator in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON91.75Weighted by estimated sales of covered mines
ESTIMATED SALES · SHORT TONS738,485Allocated from published county sales
ESTIMATED COAL REVENUE · USD67,756,030Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED100.0%2 of 2 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Panther Mine1518198 · Harlan, Kentucky503,36091.75505,10446,343,325County allocation estimate22.17% of eligible county production13 eligible mines / 13 sales respondents
Orchard Branch Owl Mine1519860 · Harlan, Kentucky232,57591.75233,38121,412,704County allocation estimate10.24% of eligible county production13 eligible mines / 13 sales respondents
Cave Branch Plant1516054 · Harlan, Kentucky091.75——Preparation plant13 eligible mines / 13 sales respondents
Cloverlick Kellioka Mine1519973 · Location unavailable————No matching annual production record
Trace Branch Splint Mine1519974 · Location unavailable————No matching annual production record
Lone Mountain Plant4405898 · Lee, Virginia0———Preparation plant
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.