MSHA DATABASEMSHA records · 11 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

Newhall Surface Mine No. 3

ActiveSurfaceCoal (Bituminous)
MSHA MINE ID4609624
LOCATIONMcdowell, WV
PUBLIC RECORD238 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

17

2 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q32
  4. 2025 Q44
  5. 2026 Q10
  6. 2026 Q211
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

2,531.00

15 of 17 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q3302
  4. 2025 Q4470
  5. 2026 Q1—
  6. 2026 Q21,759
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

83.00

5 inspections · 5 with hours

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q315.25
  4. 2025 Q419.75
  5. 2026 Q1—
  6. 2026 Q245.50
  7. 2026 Q32.50
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q200—000—
2025-Q320302.0000115.3
2025-Q440470.0000219.8
2026-Q100—000—
2026-Q21121,759.0000145.5
2026-Q300—0012.5
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF01086A

    Spot Inspection · 2.5 on-site hours

  2. violation5131076

    77.404(a) · S&S · $267.00 proposed

  3. violation5131075

    77.205(a) · S&S · $267.00 proposed

  4. violation5131074

    77.1605(d) · $151.00 proposed

  5. violation5092336

    77.1606(c) · $151.00 proposed

  6. violation5092335

    77.1606(c)

  7. violation5092334

    77.1605(a) · $151.00 proposed

  8. violation5092333

    77.1606(c) · $151.00 proposed

  9. violation5092332

    77.1606(c) · $168.00 proposed

  10. violation5092331

    77.1605(d) · $151.00 proposed

  11. violation5092324

    77.1109(a) · $151.00 proposed

  12. violation5092323

    77.1605(k) · $151.00 proposed

  13. inspectionF01085D

    Regular Safety and Health Inspection · 45.5 on-site hours

  14. inspectionF02A94D

    Spot Inspection · 1.5 on-site hours

  15. violation5090766

    77.1606(c)

  16. inspectionF02A93F

    Regular Safety and Health Inspection · 18.3 on-site hours

  17. violation5090756

    77.1606(c) · $168.00 proposed

  18. violation5090755

    77.1606(c) · $151.00 proposed

  19. violation5090754

    77.1606(c) · $151.00 proposed

  20. violation5090745

    71.400 · $151.00 proposed

  21. violation5090744

    77.1000 · $151.00 proposed

  22. inspectionF02A938

    Regular Safety and Health Inspection · 15.3 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Published county average
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED0.0%0 of 1 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Newhall Surface Mine No. 34609624 · Mcdowell, West Virginia22,457150.07——Below EIA sales-reporting threshold10 eligible mines / 10 sales respondents
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYEdward A Asbury → Skyway Strip, Inc. → Newhall Surface Mine No. 3
HISTORY RECORDS13 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

Edward A AsburycontrolsSkyway Strip, Inc.operatesNewhall Surface Mine No. 3

msha-controller-operator-history · controller/operator co-tenure derived on mine 4609624
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYneutral

Accidents and injuries

0 historical accident/injury rows; 0 coded fatalities and 0 lost days across the published record.

ACCIDENT + INJURY RECORD0 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

46 violation rows across the full record; 9 carry an S&S flag and $8,412 appears in current assessed amounts.

ENFORCEMENT ACTIVITY46 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHcontext

Occupational health samples

85 coal dust; 14 coal quartz; 9 noise. 0 personal-sample rows have a published C/E ratio above 1; 0 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE108 samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

6K employee hours and 9 summed average employees across reported subunits in the latest published quarter.

2026-Q29K tons
mine-production-quarterlymine-production-yearly
05 / LEGALneutral

Contests, conferences and decisions

0 contested-violation rows, 0 civil-penalty docket/decision rows, and 0 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE0 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT0 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

14 inspection events and 482 published inspection hours across the historical record.

OVERSIGHT COVERAGE14 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records22 coal · 0 personal · 0 area
Sample status2 not voided0 voided · 0 status not reported
Mean coal quartz concentration9.5 µg/m³2 eligible measurements · 0 missing concentration
2026 · May 20, 2026–Jun 11, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58593375 / lab 2026024443Coal quartzQuartzHIGHWALL DRILL OPERATORDESIGNATED WORK POSITION13 µg/m³8.3% quartzNot voidedNot reported
58596629 / lab 2026021266Coal quartzQuartzBULLDOZER OPERATORDESIGNATED WORK POSITION6 µg/m³5.1% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

EIA MINE CONTEXT2024 record
ANNUAL COAL PRODUCTION22,457short tons
LABOR HOURS
23,835
AVG EMPLOYEES
8
SUPPLY REGION
Appalachia Central
UNION
No union code published
OPERATION
Mine only
COMPANY TYPE
Independent Producer Operator

1 published EIA row aggregated under this MSHA ID. Components remain available in JSON.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
513107677.404(a)S&S
513107577.205(a)S&S
513107477.1605(d)Citation
509233677.1606(c)Citation
509233577.1606(c)Order
509233477.1605(a)Citation
509233377.1606(c)Citation
509233277.1606(c)Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustBULLDOZER OPERATOR
.028 mg/m³Not voided
Coal dustHIGHWALL DRILL OPERATOR
.079 mg/m³Not voided
Coal dustHIGHWALL DRILL OPERATOR
.168 mg/m³Not voided
Coal dustREFUSE TRUCK DRIVER/BACKFILL TRUCK DRIVE
.26 mg/m³Not voided
Coal dustHIGHLIFT OPERATOR/FRONT END LOADER
.222 mg/m³Not voided
Coal dustREFUSE TRUCK DRIVER/BACKFILL TRUCK DRIVE
.203 mg/m³Not voided
Coal dustBULLDOZER OPERATOR
.134 mg/m³Not voided
Coal dustMINE FOREMAN/MINE MANAGER
.046 mg/m³Not voided

SOURCE COVERAGE

Reporting dates and coverage

11 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors—No published rowsabsent / not applicable
Addresses of Recordidentity · logistics1May 27, 2026—May 27, 2026mine-keyed
Assessed Violationscompliance · legal44Sep 7, 2022—Jun 9, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal—No published rowsabsent / not applicable
Coal Dust Sampleshealth · safety85Dec 18, 2014—Aug 18, 2026mine-keyed
Conferencescompliance · legal—No published rowsabsent / not applicable
Contested Violationscompliance · legal—No published rowsabsent / not applicable
Contractor Employment and Production — Quarterlycontractors · production · safety—No published rowsabsent / not applicable
Contractor Employment and Production — Yearlycontractors · production · safety—No published rowsabsent / not applicable
Controller and Operator Historyidentity · compliance1Feb 1, 2022—Feb 1, 2022mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance18Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance5Not published—Not publishedmine-keyed
Inspectionssafety · compliance14Sep 7, 2022—Aug 17, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment9Sep 21, 2022—Feb 16, 2024mine-keyed
Quartz Samples — Coalhealth · safety14Mar 21, 2017—Jun 11, 2026mine-keyed
Violationscompliance · safety · legal46Sep 7, 2022—Jun 9, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.