MINE #9 safety activity
MSHA violations, accident reports and inspections.
Safety activity
Escapeway maps.
30 CFR 75.1505(a)
Approved self-rescue devices.
30 CFR 75.1714-1(c)
Communications facilities; refuge alternatives.
30 CFR 75.1600-3(a)(2)
Regular Safety and Health Inspection
31.3 on-site hours reported
Communication facilities; working sections; installation and maintenance requirements; audible or visual alarms.
30 CFR 75.1600-2(b)
Spot Inspection
10.5 on-site hours reported
Flammable liquids; storage.
30 CFR 77.1103(a)
Fall of roof or back
Accident only
Accident narrative
Fall occurred in #3 entry in the neutral in intersection at break #7. The fall was about 35' x 35' and 5' high. It did not block the travel ways or the air course. It has been timbered around fall and dangered off.
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $1,550.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $151.00 proposed penalty
Water sprinkler systems; fire warning devices at belt drives.
30 CFR 75.1101-10 · $151.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $313.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $755.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · Significant and substantial (S&S)
Automatic fire warning devices; actions and response.
30 CFR 75.1103-5(a) · Significant and substantial (S&S)
Automatic fire warning devices; actions and response.
30 CFR 75.1103-5(a)(1) · Significant and substantial (S&S)
Automatic fire warning devices; actions and response.
30 CFR 75.1103-5(a)(2) · Significant and substantial (S&S) · $697.00 proposed penalty
Automatic fire sensor and warning device systems; examination and test requirements.
30 CFR 75.1103-8(b) · $151.00 proposed penalty
Ventilation controls.
30 CFR 75.333(h) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Water sprinkler systems; general.
30 CFR 75.1101-6 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · $151.00 proposed penalty
Electric wiring and equipment; installation and maintenance.
30 CFR 77.516 · Significant and substantial (S&S) · $592.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(iv) · $177.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.