← Michael Powellton Deep Mine

Michael Powellton Deep Mine safety activity

MSHA violations, accident reports and inspections.

2025-01-01 – 2026-10-28Database snapshot · 2026-10-28

Safety activity

  1. Water sprinkler systems; fire warning devices at belt drives.

    violationRecord 5133887

    30 CFR 75.1101-10 · $151.00 proposed penalty

  2. Electric equipment; examination, testing and maintenance.

    violationRecord 5133886

    30 CFR 75.512 · Significant and substantial (S&S) · $10,569.00 proposed penalty

  3. Permanent splicing of trailing cables.

    violationRecord 5133885

    30 CFR 75.604(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  4. Permanent splicing of trailing cables.

    violationRecord 5133884

    30 CFR 75.604(b) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  5. Power wires and cables; insulation and protection.

    violationRecord 5133883

    30 CFR 75.517 · Significant and substantial (S&S) · $9,757.00 proposed penalty

  6. Other safeguards.

    violationRecord 5133882

    30 CFR 75.1403 · Significant and substantial (S&S) · $4,749.00 proposed penalty

  7. Accumulation of combustible materials.

    violationRecord 5133878

    30 CFR 75.400 · $592.00 proposed penalty

  8. Roof control plan.

    violationRecord 5133877

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $10,569.00 proposed penalty

  9. Roof control plan.

    violationRecord 5133876

    30 CFR 75.220(a)(1) · Significant and substantial (S&S) · $2,133.00 proposed penalty

  10. Other safeguards.

    violationRecord 5133875

    30 CFR 75.1403 · $288.00 proposed penalty

  11. Escapeways; bituminous and lignite mines.

    violationRecord 5133874

    30 CFR 75.380(d)(1) · Significant and substantial (S&S) · $4,749.00 proposed penalty

  12. Electric equipment; examination, testing and maintenance.

    violationRecord 5095582

    30 CFR 75.512 · $267.00 proposed penalty

  13. Identification of circuit breakers.

    violationRecord 5095581

    30 CFR 75.904 · $432.00 proposed penalty

  14. Mechanical equipment guards.

    violationRecord 5133872

    30 CFR 75.1722(a) · $432.00 proposed penalty

  15. Machinery and equipment; operation and maintenance.

    violationRecord 5133871

    30 CFR 75.1725(a) · Significant and substantial (S&S) · $8,315.00 proposed penalty

  16. Rock dusting.

    violationRecord 5133870

    30 CFR 75.402 · $288.00 proposed penalty

  17. Mine ventilation plan; submission and approval.

    violationRecord 5133869

    30 CFR 75.370(a)(1) · $398.00 proposed penalty

  18. Drill dust control at underground areas of underground mines.

    violationRecord 5133838

    30 CFR 72.630(b) · $193.00 proposed penalty

  19. Permissible electric face equipment; maintenance.

    violationRecord 5133837

    30 CFR 75.503 · $288.00 proposed penalty

  20. Mine ventilation plan; submission and approval.

    violationRecord 5133836

    30 CFR 75.370(a)(1) · $549.00 proposed penalty

  21. Mine ventilation plan; submission and approval.

    violationRecord 5133835

    30 CFR 75.370(a)(1) · $818.00 proposed penalty

  22. Permanent splicing of trailing cables.

    violationRecord 5133828

    30 CFR 75.604(b) · $432.00 proposed penalty

  23. Power wires and cables; insulation and protection.

    violationRecord 5133827

    30 CFR 75.517 · Significant and substantial (S&S) · $3,736.00 proposed penalty

  24. Permissible electric face equipment; maintenance.

    violationRecord 5133826

    30 CFR 75.503 · $288.00 proposed penalty

  25. Electric equipment; examination, testing and maintenance.

    violationRecord 5133825

    30 CFR 75.512 · $288.00 proposed penalty

Sources and definitions

MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).

Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.