Michael Powellton Deep Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Electrical Technical Investigation
5.0 on-site hours reported
Spot Inspection
7.8 on-site hours reported
Spot Inspection
20.3 on-site hours reported
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S)
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · Significant and substantial (S&S)
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S)
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S)
Machinery and equipment; operation and maintenance.
30 CFR 75.1725(a) · Significant and substantial (S&S)
Roof control plan.
30 CFR 75.220(a)(1) · Significant and substantial (S&S)
Protection from falls of roof, face and ribs.
30 CFR 75.202(a) · Significant and substantial (S&S)
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(1)
Multi-gas detectors.
30 CFR 75.1714-7(a)
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $4,383.00 proposed penalty
Machinery and equipment; operation and maintenance.
30 CFR 77.404(a) · $1,219.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503
Electric equipment; examination, testing and maintenance.
30 CFR 75.512
Other safeguards.
30 CFR 75.1403
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Handtools (nonpowered)
No dys awy frm wrk,no rstr act
Accident narrative
Employee was pulling track rail back on the active pillar section, when the chain they were using to pull the rail came loose and struck them in the right eye and face area.
Condition and examination of firefighting equipment.
30 CFR 75.1100-3 · $288.00 proposed penalty
Proximity detection systems.
30 CFR 75.1732(b)(2) · Significant and substantial (S&S) · $4,749.00 proposed penalty
Deenergization of self-propelled electric face equipment installation requirements.
30 CFR 75.523-1(a) · $959.00 proposed penalty
Roof control plan.
30 CFR 75.220(a)(1) · $642.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $288.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.