Eagle Seam Deep Mine safety activity
MSHA violations, accident reports and inspections.
Safety activity
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $592.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Regular Safety and Health Inspection
135.5 on-site hours reported
Slip or fall of person
Days away from work only
Accident narrative
Employee was washing the head drive area and fell. They tried to catch themselves and fell on their wrist
Accumulation of combustible materials.
30 CFR 75.400 · $549.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $7,676.00 proposed penalty
Maintenance of incombustible content of rock dust.
30 CFR 75.403 · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $267.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $549.00 proposed penalty
Other safeguards.
30 CFR 75.1403 · Significant and substantial (S&S) · $2,312.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $193.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Other safeguards.
30 CFR 75.1403
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $313.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $697.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(f)(5)(ii) · $313.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,503.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $697.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $288.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $755.00 proposed penalty
Certification.
30 CFR 75.1201 · $151.00 proposed penalty
Mine ventilation plan; submission and approval.
30 CFR 75.370(a)(1) · $226.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.