Minimum requirements of surface bathing facilities, change rooms, and sanitary toilet facilities.
30 CFR 75.1712-3(a) · $267.00 proposed penalty
Grounding metallic frames, casings, and other enclosures of electric equipment.
30 CFR 77.701 · $151.00 proposed penalty
Changes in electric system map; recording.
30 CFR 75.508-2 · $151.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vi) · $151.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(a) · $267.00 proposed penalty
Maintenance of belt conveyors and belt conveyor entries.
30 CFR 75.1731(b) · $151.00 proposed penalty
Water sprinkler systems; arrangement of sprinklers.
30 CFR 75.1101-8(a) · $267.00 proposed penalty
Cable fittings; suitability.
30 CFR 75.515 · $267.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $504.00 proposed penalty
Water sprinkler systems; arrangement of sprinklers.
30 CFR 75.1101-8(a) · $267.00 proposed penalty
Cable fittings; suitability.
30 CFR 75.515 · $151.00 proposed penalty
Approval of other fire suppression devices.
30 CFR 75.1107-13(g) · $151.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $245.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · Significant and substantial (S&S) · $2,133.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $592.00 proposed penalty
Drill dust control at underground areas of underground mines.
30 CFR 72.630(b) · $177.00 proposed penalty
Automatic fire sensors and manual actuators; installation; minimum requirements.
30 CFR 75.1107-4(a)(1) · $288.00 proposed penalty
Permanent splicing of trailing cables.
30 CFR 75.604(b) · $193.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $2,133.00 proposed penalty
Automatic fire sensors.
30 CFR 75.1103-1(b) · $465.00 proposed penalty
Escapeways; bituminous and lignite mines.
30 CFR 75.380(d)(7)(vii) · $267.00 proposed penalty
Installation of high-voltage transmission cables.
30 CFR 75.807 · $398.00 proposed penalty
Permissible electric face equipment; maintenance.
30 CFR 75.503 · $592.00 proposed penalty
Electric equipment; examination, testing and maintenance.
30 CFR 75.512 · $592.00 proposed penalty
Accumulation of combustible materials.
30 CFR 75.400 · $592.00 proposed penalty
Sources and definitions
MSHA Violations (issue date), Accidents (accident date) and Inspections (begin date).
Violation titles use current CFR headings to identify the cited rule; they are not the inspector’s account of what happened.
Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.
Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.
S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.
Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.
Portfolio totals use current mine membership, including events before the current owner or operator's tenure.