MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

Deep Mine 25

Abandoned and SealedSurfaceCoal (Bituminous)
MSHA MINE ID4407129
LOCATIONDickenson, VA
PUBLIC RECORD7,857 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

0

0 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

—

0 of 0 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

—

0 inspections · 0 with hours

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q3—
  4. 2025 Q4—
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q200—000—
2025-Q300—000—
2025-Q400—000—
2026-Q100—000—
2026-Q200—000—
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

SectionViolationsS&S

No violation records in this period.

Safety activity

    No matching records in this period.

    Safety sources and definitions

    MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

    Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

    Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

    S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

    Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

    Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

    CFR headings link to the current Title 30 index; they are not historical legal determinations.

    Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

    REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
    HEAT CONTENT · BTU/LB—Weighted by reported tons
    SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
    DELIVERED COST · USD/TON—No price coverage

    No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

    Coverage, sources and calculations
    • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
    • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
    • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
    • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
    • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
    • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

    Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

    • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
    • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

    Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

    FOB PRICE BENCHMARK · USD/TON—Published county average
    ESTIMATED SALES · SHORT TONS—Allocated from published county sales
    ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
    ANNUAL PRODUCTION COVERED—0 of 0 producing annual mine records
    Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
    Deep Mine 254407129 · Location unavailable————No matching annual production record
    Method, assumptions and source records
    1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
    2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
    3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
    4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
    5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
    6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
    7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

    Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

    EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

    Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

    OWNERSHIP

    Operator and controller history

    Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

    CURRENT HIERARCHYAlpha Metallurgical Resources Inc → Paramont Contura, LLC → Deep Mine 25
    HISTORY RECORDS512 relationships
    INTERVAL CHECK2 REVIEWcontroller/operator overlap
    —

    Jason Hogg et alcontrolsJarisa, Inc.operatesDeep Mine 25

    msha-controller-operator-history · controller/operator co-tenure derived on mine 4407129
    —

    Larissa Bailey et alcontrolsJarisa, Inc.operatesDeep Mine 25

    msha-controller-operator-history · controller/operator co-tenure derived on mine 4407129
    —

    Alpha Metallurgical Resources InccontrolsParamont Contura, LLCoperatesDeep Mine 25

    msha-controller-operator-history · controller/operator co-tenure derived on mine 4407129
    —

    Paul M HoggcontrolsJarisa, Inc.operatesDeep Mine 25

    msha-controller-operator-history · controller/operator co-tenure derived on mine 4407129
    —

    Alpha Natural Resources, Inc.controlsParamont Coal Company Virginia, LLC.operatesDeep Mine 25

    msha-controller-operator-history · controller/operator co-tenure derived on mine 4407129
    Other historical summaries · source-specific periods

    RECORD SUMMARY

    Production, safety and enforcement

    These summaries use the periods stated on each card, independently of the reporting period above.

    01 / SAFETYneutral

    Accidents and injuries

    119 historical accident/injury rows; 0 coded fatalities and 2,939 lost days across the published record.

    ACCIDENT + INJURY RECORD0 since 2021
    accidentsmine-production-quarterly
    02 / COMPLIANCEneutral

    Violations and penalties

    1,411 violation rows across the full record; 361 carry an S&S flag and $572,005 appears in current assessed amounts.

    ENFORCEMENT ACTIVITY0 since 2021
    inspectionsviolationsassessed-violationsorders-107a
    03 / HEALTHwatch

    Occupational health samples

    2,663 coal dust; 248 coal quartz; 269 noise. 0 personal-sample rows have a published C/E ratio above 1; 24 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

    OCCUPATIONAL EXPOSURE3K samples
    coal-dust-samplesquartz-samplesnoise-samples
    04 / PRODUCTIONcontext

    Quarterly production and employment

    200 employee hours and 1 summed average employees across reported subunits in the latest published quarter.

    2019-Q20 tons
    mine-production-quarterlymine-production-yearly
    05 / LEGALwatch

    Contests, conferences and decisions

    276 contested-violation rows, 276 civil-penalty docket/decision rows, and 81 conference records linked by issuance number.

    POST-ISSUANCE LIFECYCLE633 linked rows
    conferencescontested-violationscivil-penalty-dockets-decisions
    06 / CONTRACTORScontext

    Contractors

    Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

    ENTITY-LEVEL CONTEXT6 linked entities
    contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
    07 / INSPECTIONScontext

    Inspections

    217 inspection events and 16K published inspection hours across the historical record.

    OVERSIGHT COVERAGE0 since 2021
    inspectionsviolations

    HEALTH SAMPLING

    Silica and quartz

    Matching records00 coal · 0 personal · 0 area
    Sample status0 not voided0 voided · 0 status not reported
    Mean coal quartz concentration— µg/m³0 eligible measurements · 0 missing concentration
    2026 · No reported dates in this selection
    Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
    No silica records match these filters. Missing samples do not establish safe conditions.
    Sources and interpretation
    • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
    • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
    • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
    • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
    • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

    Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

    EIA + TITLE 30

    EIA production and cited regulations

    EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

    RECENT PUBLIC RECORDS

    Recent violations and samples

    Latest records retained for inspection; aggregates above use the full source history.

    VIOLATIONS12 latest shown
    821566275.370(a)(1)S&S
    825839575.512Citation
    825839475.400Citation
    825839375.1731(b)Citation
    825839275.1107-9(a)(1)Citation
    825839175.1722(c)Citation
    825839075.363(b)Citation
    739679545.4(a)Citation
    OTHER HEALTH SAMPLES8 latest shown

    Coal dust, noise and other contaminants. Silica records above ↑

    Coal dustBULLDOZER OPERATOR
    .033 mg/m³Not voided
    Coal dustBULLDOZER OPERATOR
    .058 mg/m³Not voided
    Coal dustBULLDOZER OPERATOR
    .048 mg/m³Not voided
    Coal dustSCOOP CAR OPERATOR
    .523 mg/m³Not voided
    Coal dustSHUTTLE CAR OPERATOR (STANDARD SIDE)
    .258 mg/m³Not voided
    Coal dustSHUTTLE CAR OPERATOR (STANDARD SIDE)
    .367 mg/m³Not voided
    Coal dustCONTINUOUS MINER OPERATOR
    .836 mg/m³Not voided
    Coal dustUTILITY MAN
    .376 mg/m³Not voided

    SOURCE COVERAGE

    Reporting dates and coverage

    17 datasets contain linked records. Missing datasets are listed below.

    DATASETROWSWINDOWSTATUS
    Accident, Injuries, and Illnessessafety · contractors119Feb 27, 2006—May 12, 2016mine-keyed
    Addresses of Recordidentity · logistics1Apr 24, 2019—Apr 24, 2019mine-keyed
    Assessed Violationscompliance · legal1,390Oct 11, 2005—Nov 21, 2017mine-keyed
    Civil Penalty Dockets and Decisionscompliance · legal276Aug 11, 2008—Jun 30, 2017mine-keyed
    Coal Dust Sampleshealth · safety2,663Oct 17, 2005—Apr 2, 2019mine-keyed
    Conferencescompliance · legal81Nov 1, 2005—Dec 23, 2016mine-keyed
    Contested Violationscompliance · legal276May 1, 2007—Oct 24, 2016mine-keyed
    Contractor Employment and Production — Quarterlycontractors · production · safety551Not published—Not publishedentity-linked
    Contractor Employment and Production — Yearlycontractors · production · safety148Not published—Not publishedentity-linked
    Controller and Operator Historyidentity · compliance5Oct 1, 2004—Feb 8, 2018mine-keyed
    Mine Employment and Production — Quarterlyproduction · safety · compliance167Not published—Not publishedmine-keyed
    Mine Employment and Production — Yearlyproduction · safety · compliance34Not published—Not publishedmine-keyed
    Inspectionssafety · compliance217Mar 18, 2005—Feb 27, 2019mine-keyed
    Minesidentity · production · logistics1Not published—Not publishedmine-keyed
    Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
    Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
    Noise Sampleshealth · safety · equipment269Sep 12, 2006—Nov 21, 2017mine-keyed
    Quartz Samples — Coalhealth · safety248Feb 15, 2006—Jan 12, 2018mine-keyed
    Violationscompliance · safety · legal1,411Oct 11, 2005—Nov 21, 2017mine-keyed
    107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

    NOTES

    Limitations

    • Contractor production is entity-level and is never represented as mine-attributable.
    • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.