MSHA DATABASEMSHA records · 15 contributing sources · snapshot Oct 17, 2026

MINE DETAILS

Creek Paum Mine

NonProducingSurfaceCoal (Bituminous)
MSHA MINE ID1103020
LOCATIONJackson, IL
PUBLIC RECORD2,260 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-17Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

1

0 significant & substantial (S&S)

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q31
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Accident records

1

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q21
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

151.00

1 of 1 violations with amounts

  1. 2025 Q1—
  2. 2025 Q2—
  3. 2025 Q3151
  4. 2025 Q4—
  5. 2026 Q1—
  6. 2026 Q2—
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

34.50

4 inspections · 4 with hours

  1. 2025 Q1—
  2. 2025 Q211.00
  3. 2025 Q31.50
  4. 2025 Q411.00
  5. 2026 Q1—
  6. 2026 Q211.00
  7. 2026 Q3—
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q100—000—
2025-Q200—00111.0
2025-Q310151.000011.5
2025-Q400—00111.0
2026-Q100—000—
2026-Q200—10111.0
2026-Q300—000—
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. inspectionF009CFB

    Regular Safety and Health Inspection · 11.0 on-site hours

  2. accident220260970018

    SLIP OR FALL OF PERSON · NO DYS AWY FRM WRK,NO RSTR ACT

    Accident narrative

    The IE slipped while entering the cab of the D5 dozer and struck EE's forehead on the door frame resulting in sutures.

  3. inspectionF009CE9

    Regular Safety and Health Inspection · 11.0 on-site hours

  4. inspectionF00056E

    Spot Inspection · 1.5 on-site hours

  5. violation9789066

    41.12 · $151.00 proposed

  6. inspectionF009CD7

    Regular Safety and Health Inspection · 11.0 on-site hours

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-17.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-17 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-17. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Published county average
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED—0 of 0 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Creek Paum Mine1103020 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYCBR Investments, LLC; CBR Investments II, LLC → Knight Hawk Coal LLC → Creek Paum Mine
HISTORY RECORDS914 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

CBR Investments, LLC et alcontrolsKnight Hawk Coal LLCoperatesCreek Paum Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 1103020
—

CBR Investments II, LLC et alcontrolsKnight Hawk Coal LLCoperatesCreek Paum Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 1103020
—

Arch Coal Inc et alcontrolsKnight Hawk Coal LLCoperatesCreek Paum Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 1103020
—

CBR Investments LLC et alcontrolsKnight Hawk Coal LLCoperatesCreek Paum Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 1103020
—

Franklin D. Robertson et alcontrolsKnight Hawk Coal LLCoperatesCreek Paum Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 1103020
—

Arch Coal Inc. et alcontrolsKnight Hawk Coal LLCoperatesCreek Paum Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 1103020
—

James O. Bunn et alcontrolsKnight Hawk Coal LLCoperatesCreek Paum Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 1103020
—

James O Bunn et alcontrolsKnight Hawk Coal LLCoperatesCreek Paum Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 1103020
—

Franklin D Robertson et alcontrolsKnight Hawk Coal LLCoperatesCreek Paum Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 1103020
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYwatch

Accidents and injuries

32 historical accident/injury rows; 0 coded fatalities and 799 lost days across the published record.

ACCIDENT + INJURY RECORD1 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

125 violation rows across the full record; 67 carry an S&S flag and $24,857 appears in current assessed amounts.

ENFORCEMENT ACTIVITY1 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

332 coal dust; 13 coal quartz; 130 noise. 0 personal-sample rows have a published C/E ratio above 1; 9 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE475 samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

36K employee hours and 67 summed average employees across reported subunits in the latest published quarter.

2002-Q4292K tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

0 contested-violation rows, 0 civil-penalty docket/decision rows, and 3 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE3 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT12 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

85 inspection events and 4K published inspection hours across the historical record.

OVERSIGHT COVERAGE14 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records00 coal · 0 personal · 0 area
Sample status0 not voided0 voided · 0 status not reported
Mean coal quartz concentration— µg/m³0 eligible measurements · 0 missing concentration
2026 · No reported dates in this selection
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
No silica records match these filters. Missing samples do not establish safe conditions.
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
978906641.12Citation
903185377.1606(c)Citation
903185277.1606(c)Citation
845142377.208(d)Citation
845140977.400(a)S&S
842056977.404(a)S&S
842056877.1605(b)Citation
842055577.1605(c)Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustCOAL SAMPLER
.025 mg/m³Not voided
Coal dustCOAL SAMPLER
.024 mg/m³Not voided
Coal dustCOAL SAMPLER
.027 mg/m³Not voided
Coal dustCOAL SAMPLER
.043 mg/m³Not voided
NoiseCOAL SAMPLER
PEL dose: 10%Action-level dose: 18%
NoiseCOAL SAMPLER
PEL dose: 0%Action-level dose: 2%
Coal dustCOAL SAMPLER
.035 mg/m³Not voided
Coal dustCOAL SAMPLER
.03 mg/m³Not voided

SOURCE COVERAGE

Reporting dates and coverage

15 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors32Jan 27, 2000—Apr 3, 2026mine-keyed
Addresses of Recordidentity · logistics1Jan 2, 2019—Jan 2, 2019mine-keyed
Assessed Violationscompliance · legal125Aug 10, 2000—Sep 30, 2025mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal—No published rowsabsent / not applicable
Coal Dust Sampleshealth · safety332Feb 22, 2000—Apr 8, 2026mine-keyed
Conferencescompliance · legal3Apr 15, 2013—Jun 9, 2014mine-keyed
Contested Violationscompliance · legal—No published rowsabsent / not applicable
Contractor Employment and Production — Quarterlycontractors · production · safety1,080Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety240Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance9Mar 1, 1998—Mar 1, 1998mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance32Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance52Not published—Not publishedmine-keyed
Inspectionssafety · compliance85Feb 22, 2000—Apr 7, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment130Feb 22, 2000—Dec 15, 2025mine-keyed
Quartz Samples — Coalhealth · safety13Sep 27, 2001—Aug 24, 2020mine-keyed
Violationscompliance · safety · legal125Aug 10, 2000—Sep 30, 2025mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.