MSHA DATABASEMSHA records · 17 contributing sources · snapshot Oct 13, 2026

MINE DETAILS

Coon Cedar Grove Mine

NonProducingUndergroundCoal (Bituminous)
MSHA MINE ID4608837
LOCATIONRaleigh, WV
PUBLIC RECORD5,455 linked rows

LOCATION

Mine location

1 of 1 mine with usable MSHA coordinates. Select a marker to open a mine.

Mine coordinates

2025-01-01 – 2026-10-13Applies to production, safety and portfolio metrics. Silica samples have separate filters.

Violations

21

1 significant & substantial (S&S)

  1. 2025 Q15
  2. 2025 Q28
  3. 2025 Q33
  4. 2025 Q42
  5. 2026 Q11
  6. 2026 Q21
  7. 2026 Q31
  8. 2026 Q4 *0

Accident records

0

0 records classified as fatality

  1. 2025 Q10
  2. 2025 Q20
  3. 2025 Q30
  4. 2025 Q40
  5. 2026 Q10
  6. 2026 Q20
  7. 2026 Q30
  8. 2026 Q4 *0

Proposed penalties · USD

3,098.00

20 of 21 violations with amounts

  1. 2025 Q1781
  2. 2025 Q21,260
  3. 2025 Q3453
  4. 2025 Q4302
  5. 2026 Q1151
  6. 2026 Q2151
  7. 2026 Q3—
  8. 2026 Q4 *—

On-site inspection hours

260.75

8 inspections · 8 with hours

  1. 2025 Q144.00
  2. 2025 Q229.50
  3. 2025 Q335.50
  4. 2025 Q456.75
  5. 2026 Q131.00
  6. 2026 Q231.25
  7. 2026 Q332.75
  8. 2026 Q4 *—
Quarterly safety data
QuarterViolationsS&SProposed USDAccident recordsFatality recordsInspectionsOn-site hours
2025-Q150781.0000244.0
2025-Q2811,260.0000129.5
2025-Q330453.0000135.5
2025-Q420302.0000156.8
2026-Q110151.0000131.0
2026-Q210151.0000131.3
2026-Q310—00132.8
2026-Q4 *00—000—

Most cited CFR sections

All violations issued in the selected period. Counts combine subsections.

Safety activity

  1. violation5027022

    75.202(a)

  2. inspectionF004B0E

    Regular Safety and Health Inspection · 32.8 on-site hours

  3. violation9843672

    77.1606(c) · $151.00 proposed

  4. inspectionF01FF36

    Regular Safety and Health Inspection · 31.3 on-site hours

  5. inspectionF021FAE

    Regular Safety and Health Inspection · 31.0 on-site hours

  6. violation5092679

    75.1714-2(e) · $151.00 proposed

  7. violation9559743

    75.900-4 · $151.00 proposed

  8. violation9559742

    75.800-4(a) · $151.00 proposed

  9. inspection6316397

    Regular Safety and Health Inspection · 56.8 on-site hours

  10. violation9843671

    75.512 · $151.00 proposed

  11. violation9843670

    75.310(a)(3) · $151.00 proposed

  12. violation9843669

    75.1103-5(d) · $151.00 proposed

  13. inspection7008483

    Regular Safety and Health Inspection · 35.5 on-site hours

  14. violation9843668

    75.1107-16(c) · $151.00 proposed

  15. violation9843667

    77.1607(cc) · $151.00 proposed

  16. violation9843666

    77.400(a) · S&S · $177.00 proposed

  17. violation9843665

    75.333(h) · $151.00 proposed

  18. violation9843664

    75.310(a)(3) · $151.00 proposed

  19. violation9843663

    75.1103-4(a)(1)(i) · $151.00 proposed

  20. violation9843662

    75.601 · $177.00 proposed

  21. violation9843661

    75.512 · $151.00 proposed

  22. inspection7008482

    Regular Safety and Health Inspection · 29.5 on-site hours

  23. violation9559737

    77.205(b) · $151.00 proposed

  24. violation9559736

    75.1731(a) · $151.00 proposed

  25. violation9559735

    77.205(b) · $151.00 proposed

Safety sources and definitions

MSHA Violations (issue date), Accidents (accident date), and Inspections (begin date). Snapshot 2026-10-13.

Counts describe published rows, including contractor records; accident records are not distinct incidents or numbers of people injured.

Zero means no matching records in the imported sources, not proof of no events. Historical coverage differs by source; absence before a source begins reporting is not a zero incident rate. Invalid or absent dates and records after the snapshot are excluded.

S&S means SIG_SUB=Y. Fatality records use DEGREE_INJURY_CD=01. Proposed penalties are not final assessed or paid amounts; missing dollar values are omitted.

Inspection hours are SUM_TOTAL_ON_SITE_HOURS attributed to the inspection start date, without supervisor/trainee hours. Missing hours are omitted; a started inspection may still be open.

Portfolio totals use current mine membership, including events before the current owner or operator's tenure.

CFR headings link to the current Title 30 index; they are not historical legal determinations.

Latest EIA month: 2026-07Source checked 2026-10-13 · publication lag differs from MSHA.

REPORTED RECEIPTS · SHORT TONS—0 rows · 0 receiving plants
HEAT CONTENT · BTU/LB—Weighted by reported tons
SULFUR / ASH · % BY WEIGHT— / —Separate averages over measured receipts
DELIVERED COST · USD/TON—No price coverage

No receipts matched this mine in the selected period. EIA-923 does not cover all mine sales, exports or metallurgical coal shipments.

Coverage, sources and calculations
  • Reported coal receipts at EIA-923 power plants/terminals; this is not a census of mine shipments, exports or metallurgical sales.
  • Matches use only the published MSHA ID, normalized to seven digits. Unidentified mine origins remain in the source table but are not assigned to a mine.
  • Portfolio attribution uses current MSHA ownership, not ownership at the shipment date. Receipts and production can differ because of timing, stocks and coverage.
  • Quality means are weighted by positive reported tons with that measurement. Delivered cost uses only rows with published cost, positive heat and positive tons; missing/withheld costs are never zero-filled.
  • USD/ton = (cents/MMBtu ÷ 100) × MMBtu/ton. This is plant delivered cost, not mine sales price or revenue.
  • Receipt month is as published, including records supplied by annual respondents. Recent months are preliminary and subject to revision. Missing rows do not prove zero shipments.

Imported releases start 2008-01. This window includes 12 published months. EIA releases · Survey instructions

  • 2026 · preliminary · EIA923_Schedules_2_3_4_5_M_07_2026_21SEP2026.xlsx · Page 5 Fuel Receipts and Costs
  • 2025 · final · EIA923_Schedules_2_3_4_5_M_12_2025_Final.xlsx · Page 5 Fuel Receipts and Costs

Latest priced year: 2024Source checked 2026-10-13. Prices apply only to their calendar year.

FOB PRICE BENCHMARK · USD/TON—Published county average
ESTIMATED SALES · SHORT TONS—Allocated from published county sales
ESTIMATED COAL REVENUE · USD—Covered mines only · not reported revenue
ANNUAL PRODUCTION COVERED—0 of 0 producing annual mine records
Mine / countyAnnual production · tonsCounty FOB · USD/tonEst. sales · tonsEst. coal revenue · USDBasis / availability
Coon Cedar Grove Mine4608837 · Location unavailable————No matching annual production record
Method, assumptions and source records
  1. This is an annual county-sales allocation, not reported mine or company revenue. Currency is nominal USD in the source year; quantities are short tons.
  2. Mine share = same-year annual mine production / eligible same-county production. Estimated sales = published county sales × share. Estimated coal revenue = estimated sales × published county average FOB price.
  3. The model assumes eligible mines share county sales in proportion to production and receive the county-average price. Matching mine counts is a check, not proof of identical respondents. Mine quality, contracts and sales timing can differ substantially. No statistical confidence interval is implied.
  4. FOB excludes transport and insurance. EIA-923 delivered costs do not enter this model. No grade premium, state/national fallback, quarterly apportionment or carry-forward to a later year is applied.
  5. Eligibility follows the source's production threshold and excludes preparation-only and refuse operations. Withheld values, inconsistent county counts and missing/ambiguous locations produce no estimate.
  6. County sales are published in thousands of tons and prices to cents. Calculations retain precision, but the inputs are rounded and the allocation is approximate.
  7. Portfolio attribution uses current MSHA ownership, not ownership during the sales year. Covered-mine sums exclude unavailable estimates and must not be read as whole-company revenue. Coverage denominators use the annual EIA mine-production release.

Sales-reporting threshold: 50,000 short tons per mine in 2024. Withheld sales or prices stay unavailable.

EIA Table 30 · county sales and FOB prices · EIA annual mine production · Release index

Annual report released November 19, 2025. Method: county-sales-allocation-v1. JSON and CSV preserve source row numbers and file checksums.

OWNERSHIP

Operator and controller history

Current ownership comes from MSHA Mines. Historical start and end dates come from MSHA Controller and Operator History.

CURRENT HIERARCHYAlpha Metallurgical Resources Inc → Marfork Coal Company, LLC → Coon Cedar Grove Mine
HISTORY RECORDS49 relationships
INTERVAL CHECKPASScontroller/operator overlap
—

Alpha Metallurgical Resources InccontrolsMarfork Coal Company, LLCoperatesCoon Cedar Grove Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4608837
—

Alpha Natural Resources Holdings, InccontrolsMarfork Coal Company, LLCoperatesCoon Cedar Grove Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4608837
—

Alpha Natural Resources, Inc.controlsMarfork Coal Company, LLCoperatesCoon Cedar Grove Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4608837
—

Massey Energy CompanycontrolsMarfork Coal Company, LLCoperatesCoon Cedar Grove Mine

msha-controller-operator-history · controller/operator co-tenure derived on mine 4608837
Other historical summaries · source-specific periods

RECORD SUMMARY

Production, safety and enforcement

These summaries use the periods stated on each card, independently of the reporting period above.

01 / SAFETYneutral

Accidents and injuries

50 historical accident/injury rows; 0 coded fatalities and 946 lost days across the published record.

ACCIDENT + INJURY RECORD0 since 2021
accidentsmine-production-quarterly
02 / COMPLIANCEwatch

Violations and penalties

954 violation rows across the full record; 253 carry an S&S flag and $394,282 appears in current assessed amounts.

ENFORCEMENT ACTIVITY145 since 2021
inspectionsviolationsassessed-violationsorders-107a
03 / HEALTHwatch

Occupational health samples

1,144 coal dust; 55 coal quartz; 63 noise. 0 personal-sample rows have a published C/E ratio above 1; 9 noise rows have an action-level or PEL dose above 100%. These are separate measures, not a silica exceedance count. Silica results and sample status are shown separately.

OCCUPATIONAL EXPOSURE1K samples
coal-dust-samplesquartz-samplesnoise-samples
04 / PRODUCTIONcontext

Quarterly production and employment

8K employee hours and 13 summed average employees across reported subunits in the latest published quarter.

2026-Q20 tons
mine-production-quarterlymine-production-yearly
05 / LEGALwatch

Contests, conferences and decisions

160 contested-violation rows, 162 civil-penalty docket/decision rows, and 31 conference records linked by issuance number.

POST-ISSUANCE LIFECYCLE353 linked rows
conferencescontested-violationscivil-penalty-dockets-decisions
06 / CONTRACTORScontext

Contractors

Contractors are linked through this mine’s violation or accident records. Their production and hours cover all their operations, so they are not included in this mine’s totals.

ENTITY-LEVEL CONTEXT7 linked entities
contractor-production-quarterlycontractor-production-yearlyaccidentsviolations
07 / INSPECTIONScontext

Inspections

191 inspection events and 11K published inspection hours across the historical record.

OVERSIGHT COVERAGE29 since 2021
inspectionsviolations

HEALTH SAMPLING

Silica and quartz

Matching records33 coal · 0 personal · 0 area
Sample status3 not voided0 voided · 0 status not reported
Mean coal quartz concentration3.67 µg/m³3 eligible measurements · 0 missing concentration
2026 · Jan 15, 2026–Sep 3, 2026
Date / sampleDataset / analyteOccupation / areaMeasurementSample statusPublished action
58575241 / lab 2026037636Coal quartzQuartzELECTRICIANPART 90 MINER2 µg/m³1.6% quartzNot voidedNot reported
58574435 / lab 2026016307Coal quartzQuartzELECTRICIANPART 90 MINER4 µg/m³1.5% quartzNot voidedNot reported
58546738 / lab 2026002169Coal quartzQuartzELECTRICIANPART 90 MINER5 µg/m³3.8% quartzNot voidedNot reported
Sources and interpretation
  • Coal means use numeric concentrations from samples marked not voided, excluding control/invalid sample types and dates after the snapshot. Missing values remain null; reported zeroes remain zero.
  • Quarterly means describe available samples, not mine-wide or worker-average exposure. Quarters with no eligible measurements remain empty; the current quarter is partial.
  • Personal C/E is MSHA's published concentration-to-limit ratio. A value above 1 is not by itself a citation or a determination under the 2024 silica rule. Personal and area files do not publish a void-status field.
  • Area records include bulk-dust analyses and are kept separate from personal exposure results. Their concentration units are not specified in the source dictionary.
  • Missing samples do not establish safe conditions. Coal quartz percentage and concentration are separate measures. No compliance threshold is inferred for coal samples.

Coal quartz field definitions ↗Metal/nonmetal personal field definitions ↗Metal/nonmetal area field definitions ↗

EIA + TITLE 30

EIA production and cited regulations

EIA annual figures are reported separately from MSHA. Regulation links use the current eCFR snapshot.

RECENT PUBLIC RECORDS

Recent violations and samples

Latest records retained for inspection; aggregates above use the full source history.

VIOLATIONS12 latest shown
502702275.202(a)Citation
984367277.1606(c)Citation
509267975.1714-2(e)Citation
955974375.900-4Citation
955974275.800-4(a)Citation
984367175.512Citation
984367075.310(a)(3)Citation
984366975.1103-5(d)Citation
OTHER HEALTH SAMPLES8 latest shown

Coal dust, noise and other contaminants. Silica records above ↑

Coal dustELECTRICIAN
.143 mg/m³Not voided
Coal dustELECTRICIAN
.115 mg/m³Not voided
Coal dustELECTRICIAN
.092 mg/m³Not voided
Coal dustELECTRICIAN
.11 mg/m³Not voided
Coal dustELECTRICIAN
.094 mg/m³Voided
Coal dustELECTRICIAN
.058 mg/m³Not voided
Coal dustELECTRICIAN
.029 mg/m³Voided
Coal dustELECTRICIAN
.069 mg/m³Not voided

SOURCE COVERAGE

Reporting dates and coverage

17 datasets contain linked records. Missing datasets are listed below.

DATASETROWSWINDOWSTATUS
Accident, Injuries, and Illnessessafety · contractors50Aug 15, 2001—Sep 19, 2020mine-keyed
Addresses of Recordidentity · logistics1Apr 2, 2021—Apr 2, 2021mine-keyed
Assessed Violationscompliance · legal928Mar 28, 2001—Apr 16, 2026mine-keyed
Civil Penalty Dockets and Decisionscompliance · legal162May 28, 2004—Dec 6, 2024mine-keyed
Coal Dust Sampleshealth · safety1,144Apr 12, 2001—Sep 3, 2026mine-keyed
Conferencescompliance · legal31Aug 9, 2001—Nov 4, 2020mine-keyed
Contested Violationscompliance · legal160Jan 9, 2007—Apr 24, 2024mine-keyed
Contractor Employment and Production — Quarterlycontractors · production · safety1,211Not published—Not publishedentity-linked
Contractor Employment and Production — Yearlycontractors · production · safety249Not published—Not publishedentity-linked
Controller and Operator Historyidentity · compliance4Jun 1, 2000—Jun 1, 2000mine-keyed
Mine Employment and Production — Quarterlyproduction · safety · compliance203Not published—Not publishedmine-keyed
Mine Employment and Production — Yearlyproduction · safety · compliance48Not published—Not publishedmine-keyed
Inspectionssafety · compliance191Aug 7, 2000—Jul 2, 2026mine-keyed
Minesidentity · production · logistics1Not published—Not publishedmine-keyed
Metal and Nonmetal Area Sampleshealth · safety—No published rowsabsent / not applicable
Metal and Nonmetal Personal Health Sampleshealth · safety—No published rowsabsent / not applicable
Noise Sampleshealth · safety · equipment63Nov 17, 2004—Aug 1, 2025mine-keyed
Quartz Samples — Coalhealth · safety55Apr 12, 2001—Sep 3, 2026mine-keyed
Violationscompliance · safety · legal954Mar 28, 2001—Sep 2, 2026mine-keyed
107(a) Orders Issuedsafety · compliance—No published rowsabsent / not applicable

NOTES

Limitations

  • Contractor production is entity-level and is never represented as mine-attributable.
  • Missing rows can mean no event, publication delay, identity mismatch, or inapplicability.